General Inspection | 8/12/2020 | 8/12/2020 | 8/12/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2020 | 7/28/2020 | 7/28/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/13/2020 | 7/13/2020 | 7/13/2020 | | PASS |
Michael Zawacki
|
|
|
Work completed, started revegetation.
|
General Inspection | 6/26/2020 | 6/26/2020 | 6/26/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/11/2020 | 6/11/2020 | 6/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/27/2020 | 5/27/2020 | 5/28/2020 | | PASS |
Michael Zawacki
|
|
|
Site still needs landscaping.
|
General Inspection | 5/12/2020 | 5/12/2020 | 5/12/2020 | | PASS |
Michael Zawacki
|
|
|
Crew installing deck off adu. Landscapers installing sprinklers, plan on grass soon. No issues at site.
|
General Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/10/2020 | 4/10/2020 | 4/13/2020 | | PASS |
Michael Zawacki
|
|
|
Garage/adu looks completed, concrete repair completed. Site still needs landscaping.
|
General Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 3/11/2020 | 3/11/2020 | 3/11/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | | PASS |
Michael Zawacki
|
|
|
Met with builder at site. Some rilling coming down lot. Owner has been talking to landscapers about sprinklers and hydroseeding. I recommended putting a wattle down to break up the slope length.
|
General Inspection | 2/7/2020 | 2/7/2020 | 2/11/2020 | | PASS |
Michael Zawacki
|
|
|
|
Complaint Inspection | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | DONE |
Andy J. Long
|
|
|
Dumped washout next to driveway cleaned up. Reviewed washout requirements with RP. Did not see reported washout into a culvert. No other violations
|
General Inspection | 1/22/2020 | 1/22/2020 | 1/22/2020 | | PASS |
Michael Zawacki
|
|
|
Reexcavated around wall. Running jack hammer and breaking driveway. All backfill on lot, no tracking.
|
General Inspection | 1/7/2020 | 1/7/2020 | 1/8/2020 | | PASS |
Michael Zawacki
|
|
|
Site is clean. No trackout, buffer and BMPs in rear.
|
General Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | | PASS |
Michael Zawacki
|
|
|
No one with the excavator was on site, GC not sure if they're coming. Lot is contained, no issues.
|
General Inspection | 12/6/2019 | 12/6/2019 | 12/6/2019 | | PASS |
Michael Zawacki
|
|
|
All work behind garage. No esc issues.
|
General Inspection | 11/21/2019 | 11/21/2019 | 11/22/2019 | | PASS |
Michael Zawacki
|
|
|
Met with homeowner and foreman on site. ADU work nearly completed. Concrete is done with pouring, one spot of washout that they will get clean, rest was properly disposed. WANT TO CHANGE CONCRETE WALL TO ROCK, TOLD THEM THEY NEED TO GET A PLAN MOD TO ENGINEERING, NOT TO P[LACE ROCKS UNTIL ALL IS APPROVED.
|
General Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/22/2019 | 10/22/2019 | 10/23/2019 | | PASS |
Michael Zawacki
|
|
|
Lot contained, no esc issues.
|
General Inspection | 10/1/2019 | 10/1/2019 | 10/1/2019 | | PASS |
Michael Zawacki
|
|
|
Jobsite slopes away from road. No loose trash. There is a long bare grade leading to end of property. Wattle is protecting perimeter, will need to watch for rilling if there is heavy rain.
|
Complaint Inspection | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Michael Zawacki
|
|
|
No ESC issues at site. Excavated area is surrounded by fence, footings poured, outpak washout on site. Backfill material is behind home, has perimeter wattle on downhill side. No dust or trackout at site.
|
Site Preparation | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Andy J. Long
|
|
|
Josh Phone #: ###-####
Permit sign posted. Downslope wattle is installed. Reviewed concrete washout and trash requirements. DI bag installed down street on Rhyolite.
|