General Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/3/2020 | 7/3/2020 | 7/6/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/18/2020 | 6/18/2020 | 6/18/2020 | | PASS |
Michael Zawacki
|
|
|
Landscapers on site.
|
General Inspection | 6/3/2020 | 6/3/2020 | 6/3/2020 | | PASS |
Michael Zawacki
|
|
|
Terravita is on site installing mason landscape wall. Lot still needs to be landscaped.
|
General Inspection | 5/19/2020 | 5/19/2020 | 5/19/2020 | | PASS |
Andy J. Long
|
|
|
BLD now finaled and home occupied. Revegetation bond issued, landscaping not yet installed and perimeter silt fence is in place
|
General Inspection | 5/4/2020 | 5/4/2020 | 5/4/2020 | | PASS |
Michael Zawacki
|
|
|
Home is completed, still needs landscaping. Perimeter silt fence still installed, few trees planted, landscaping has begun.
|
General Inspection | 4/16/2020 | 4/16/2020 | 4/16/2020 | | PASS |
Michael Zawacki
|
|
|
No workers on site. Exterior construction looks completed. Site is clean, still needs landscaping.
|
General Inspection | 4/1/2020 | 4/1/2020 | 4/1/2020 | | PASS |
Michael Zawacki
|
|
|
Exterior work looks completed. All trash is going into trailer on site. Lot still needs landscaping.
|
General Inspection | 3/17/2020 | 3/17/2020 | 3/17/2020 | | PART |
Michael Zawacki
|
|
|
Some small trash along perimeter. Silt fence above site is damaged, only serves as a fence, no esc use. Street and sidewalk clean.
|
General Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 | | PASS |
Michael Zawacki
|
|
|
Lots of workers at house, have cul de sac blocked. Will need to make sure sidewalk and street is swept.
|
General Inspection | 2/11/2020 | 2/13/2020 | 2/13/2020 | A | FAIL |
Michael Zawacki
|
|
|
Pitrun stored on road. Most has been scraped, still dirty, rucks parked on top of where it was.
|
General Inspection | 1/29/2020 | 1/29/2020 | 1/31/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/20/2019 | 12/20/2019 | 12/20/2019 | | PASS |
Michael Zawacki
|
|
|
Pump truck on site, haven't started pouring, no mud yet on site. Work is retaining wall, washout provided.
|
General Inspection | 10/25/2019 | 10/28/2019 | 10/29/2019 | A | PASS |
Michael Zawacki
|
|
|
No dumped washout, did not see concrete washout container at site. Trash is getting full, will need to empty and watch for wind blown.
|
General Inspection | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PEND |
Andy J. Long
|
|
|
No washout on site for pump truck at site. Request to RP to have a washout built. RP had on site foreman begin to build a washout containment as I was on site. Will follow up Monday.
|
General Inspection | 6/4/2019 | 6/18/2019 | 6/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Basement excavated. Forms and rebar in place, no concrete pour yet, site needs washout. All contained, no dust or trackout.
|
Site Preparation | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Andy J. Long
|
|
|
please call Magnum Phone #: ###-####
Permit sign posted. RP onsite with ESC plan.
Installing silt fence to preserve clearing limits above excavation area rather than as a sediment barrier. RP to leave grass buffer to the right of the site access, additional wattle onsite to install after excavation.
Using large Outpak for washout containment.
Approved for construction.
|