Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberESC19-00702
StatusIssued
Name RHETT COLLINS
Site Address 5176 N BOGUS BASIN RD
Project NameHackberry Ridge
Customer Number 
ePlanReviewNo
Description
ten lot foothills subdivision. Establish clearing limits and preserve as much vegetation as possible. Project includes lot improvements and grading on Becker Ridge Road, installation of a nature patch connecting to the Hackberry Ranch subdivision, improvements along Bogus Basin Road; utilities installation. Dust control during grading and infrastructure installation is required. Site preparation and stormwater team meeting is required. CGP eNOI filed by Granite and Hackberry, see IDR1001VO; IDR1001VQ. After grading and installation of wattles and erosion controls, an updated site map with lot #s and lot specific BMPs shall be requested. Total are of project listed in SWPPP as 18.5
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/31/20207/31/20208/3/2020 PASS
DetailsMichael Zawacki
No new activity.
General Inspection7/16/20207/16/20207/16/2020 PASS
DetailsMichael Zawacki
East side is grown and stable.
No new activity on west side. Some areas will need reapplication of seed in fall. No building.
General Inspection7/1/20207/1/20207/7/2020 CANC
DetailsAndy J. Long
General Inspection6/16/20206/16/20206/16/2020PPART
DetailsMichael Zawacki
All lots were repaired after last rain event. Some rills and sediment within site. Rill formed on old trench for water, blew through first row of wattle. Was all caught by vegetation and second row of wattle.
East side is stable.
East side has water running of BB road and rilling, causing blowout of trail on other side of road from water directed into culvert.
General Inspection6/8/20206/8/20206/8/2020PPART
DetailsMichael Zawacki
Met with Scott at site. Some rilling coming down middle where sewer was ran. Already on site with skid steer to make repairs. Walking path was blown out from water coming through culvert.
General Inspection6/4/20206/4/20206/4/2020 PASS
DetailsMichael Zawacki
Trench work done and equipment off site. A few of the upper lots re graded. No repairs made to disturbed areas. Few sections of sidewalk need to be repoured. Road needs some patchwork.
Conference5/19/20205/20/20205/20/2020ADONE
DetailsAndy J. Long
notify ACHD about the roadway runoff issue

General Inspection5/19/20205/19/20205/19/2020PPEND
DetailsAndy J. Long
Runoff from Bogus Basin Road causing erosion on road shoulder. ACHD installed the existing rip rap, not the construction site.

GC/RP Scott said that tomorrow outfall on the culvert on west side of road near trail will get repaired.

Going to notify ACHD of the roadway runoff issue
General Inspection5/14/20205/14/20205/14/2020 PART
DetailsMichael Zawacki
Hillside trenches filled, heavy equipment moved.
No tracking on exposed hillsides.
Hills need to be reseeded.
ots of dirt tracked onto road within site and left.
General Inspection4/28/20204/28/20204/30/2020 PEND
DetailsAndy J. Long
see also ESC19-00994 for Hackberry Ridge inspections

WIP on utilities. Much of the hydroseeded area has been disturbed. Trenches up the slopes to the lots on the ridge.

The berms on the lots and the erosion controls damaged will need to be replaced.
General Inspection4/9/20204/9/20204/9/2020 PART
DetailsMichael Zawacki
Some random small windblown trash on hillside, cans, wrappers, etc. Some runoff onto sidewalks, all ends up in site system.
General Inspection3/25/20203/25/20203/25/2020 PASS
DetailsMichael Zawacki
No issues on east side of BB Rd., grass starting to sprout.
Joint trench work has begun on west side. Tracks up the hillside, some BMPs destroyed. Will need to monitor and repair as needed.
General Inspection3/10/20203/10/20203/12/2020 PASS
DetailsMichael Zawacki
One section on east along BB road is rilling onto lower area of property.
All the other lots are stable and in good condition.
General Inspection2/6/20202/6/20202/6/2020PPEND
DetailsMichael Zawacki
No issues on west side.
East side has large rill forming near road and going to low spot of site.
RP has already been notified.
General Inspection1/27/20201/27/20201/27/2020PPASS
DetailsMichael Zawacki
Everything at phase is good. No blowouts from lots or rilling.
General Inspection1/24/20201/24/20201/24/2020PPASS
DetailsMichael Zawacki
Hillsides hydroseeded and BMPs installed as needed. Lots have been bermed. No issues at site.
General Inspection12/23/201912/23/201912/23/2019PPASS
DetailsMichael Zawacki
All hillsides and lots on both sides of road in good shape. No erosion issues. Some game trails across tackified hillsides.
General Inspection11/25/201911/25/201911/25/2019PPASS
DetailsMichael Zawacki
Both sides of Bogus Basin road hydroseeded and have wattle installed.