Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberFIR16-00821
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 6000 W DENTON ST
Project NameCASCADIA SKILLED NURSING
Customer Number 
ePlanReviewYes
Description
[Cascadia Healthcare Skilled Nursing Facility]
The fire sprinkler scope of work consists of protecting one level, three building nursing home. The buildings are connected with breezeways and are therefore being considered one building. There is above and below protection. The system is gridded. Standard sprinklers and concealed space sprinklers are being utilized. The 6” underground supplies a 3” backflow preventer and riser.

The underground piping is under permit FIR16-00665

[BLD16-01757] – Fire sprinkler system used for building area increase and for occupancy. To construct (3) three, one story buildings connected by pedestrian walkways. The total floor area is about 55,643 square feet (20,739 square feet Building 200, 17,172 square feet Building 100, and 17,732 square feet Building 300). Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud exterior bearing and shear walls, wood stud interior bearing and shear walls, engineered wood roof trusses, continuous rigid insulation installed on top of the roof decks, a cantilevered roof at a passenger loading zone, exterior wall finishes, suspended acoustical ceilings, interior doors, millwork, interior finishes, smoke partition corridors, 1-hr. smoke barrier walls, 60 minute accordion-type fire doors, 60 patient sleeping rooms accessible to the disabled, accessible restrooms, a commercial kitchen, exterior doors, and exterior windows. The commercial kitchen includes a grease hood (Type I) and duct system, a make-up air unit to serve the grease hood, a dishwasher hood (Type II) and duct system, and a 1,500-gallon grease interceptor. An emergency generator will serve these buildings and will be installed within an exterior CMU enclosure open to the sky. Special Inspections are required for soils, concrete, post-installed anchors, and welding. The design for the metal awnings and the roof trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/20/20182/21/20182/21/2018APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/15/20182/16/20182/16/2018ACANC
DetailsTroy Cobbley
MIKE IS OUR FOREMAN THIS IS IN CONJUNCTION WITH THE ALARM CONTRACTOR Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
INSP-Final Inspection2/14/20182/15/20182/15/2018ACANC
DetailsTroy Cobbley
MIKE IS OUR FOREMAN FOR THE PROJECT. THIS IS IN CONJUNCTION WITH THE ALARM FINAL Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt
INSP-Final Inspection2/8/20182/9/20182/9/2018APART
DetailsTroy Cobbley
Could not final due to fire alrm issues. We did however perform the forward flush test which passed.
INSP-Sprinkler Rough-in/Hydro12/20/201712/21/201712/21/2017PPASS
DetailsTroy Cobbley
Overhead hydro test passed. Building 300 rough to cover passed. Piping can be covered.

Michael Phone #: ###-####
INSP-Sprinkler Rough-in11/30/201712/1/201712/1/2017PPASS
DetailsTroy Cobbley
The piping above the lay-in ceilings in buildings 1 and 2 is ok for cover.

Mikael Phone #: ###-####
INSP-Sprinkler Rough-in10/12/201710/12/201710/12/2017PPASS
DetailsTroy Cobbley
Remaining piping in the east most building can be covered. Insulation has been added to the combustible concealed spaces.
INSP-Sprinkler Rough-in9/11/20179/12/20179/12/2017APASS
DetailsTroy Cobbley
Remaining rough-in for the piping in the east most building is passed. Hat track is ok to install but sheet rock is not ok to be installed until insulation in the combustible concealed spaces can be verified.
INSP-Sprinkler Rough-in8/31/20179/1/20179/1/2017APART
DetailsTroy Cobbley
See the city approved plans for locations clouded where the sprinkler piping rough-in passed. Hat channel can be installed but piping can not be covered until draft stop/compartments can be verified for the CC2 heads.
INSP-Sprinkler Rough-in8/16/20178/16/20178/16/2017PPASS
DetailsTroy Cobbley
Sheet rock in Building 100 (center building) is ok to cover piping. Columns and double walls have been filled with insulation. Will need another cover inspection when the grid ceiling goes in.

Michael Phone #: ###-####
INSP-Sprinkler Rough-in8/9/20178/9/20178/9/2017PPASS
DetailsTroy Cobbley
Piping rough-in for the center building (100) passed. Piping can not be covered until insulation has been verifed in all combustible concealed spaced.

Mikael Phone #: ###-####
INSP-Sprinkler Rough-in7/26/20177/27/20177/27/2017APASS
DetailsTroy Cobbley
See the city approved plans for areas marked where piping is ok to cover for the center building.

Mikael Phone #: ###-####
INSP-Sprinkler Rough-in7/25/20177/25/20177/25/2017PPASS
DetailsTroy Cobbley
The two combustible concealed spaces at the restrooms have been filled with insulation and an additional head at the movable partion wall is approved for cover. This work was in the west most building.
INSP-Sprinkler Rough-in7/18/20177/19/20177/19/2017PPASS
DetailsTroy Cobbley
See the city approved plans for two corridors where piping is ok to cover in the center building
INSP-Sprinkler Rough-in7/13/20177/13/20177/13/2017PPASS
DetailsTroy Cobbley
Building 200 (west most building) is ok to cover. Combustible concealed spaces have been filled with insulation
INSP-Sprinkler Rough-in7/11/20177/12/20177/12/2017PFAIL
DetailsTroy Cobbley
No inspection was performed due to insulation work has not been completed
INSP-Sprinkler Rough-in7/6/20177/7/20177/7/2017PPART
DetailsTroy Cobbley
The upright heads have been centered but piping can not be covered until I have as-builts and the general contractor has filled the combustible concealed spaces with insulation as discussed
INSP-Sprinkler Rough-in7/3/20177/5/20177/5/2017PFAIL
DetailsTroy Cobbley
Contact plan review about plan modifications due to additional 90's in the 1 1/2" branchlines that effect the hydraulic calculations. Three branchlines need to be modified for spacing in the trusses and insulation needs to be added in the combustible concealed spaces as discussed. I also noted potential obstructions to the side wall sprinkler heads due to light fixtures. Piping can not be covered yet.
INSP-Sprinkler Rough-in6/23/20176/26/20176/26/2017APASS
DetailsTroy Cobbley
Additional hangers and sway bracing in the south west corridor are ok for cover.
INSP-Sprinkler Rough-in6/21/20176/22/20176/22/2017APART
DetailsJim Page
Notated city approved drawings with yellow highlighter/red ink attic area that was inspected and approved for cover. Sway brace attachment points for main in northwest corridor inspected, approved for cover.
INSP-Sprinkler Rough-in6/12/20176/13/20176/13/2017PPART
DetailsJim Page
See the city approved plans for locations where piping can be covered marked with todays date.
INSP-Sprinkler Rough-in6/6/20176/7/20176/7/2017PPASS
DetailsTroy Cobbley
See the city approved plans for locations where piping can be covered marked with todays date.
INSP-Conference6/5/20176/5/20176/5/2017PDONE
DetailsTroy Cobbley
We discussed protection of combustible concealed spaces created by fire blocking.