INSP-Final Inspection | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Jordan Fuger Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | FAIL |
Troy Cobbley
|
|
|
Could not test the flow switch for the large system due to missing inspectors test orfice. All other devices worked and reported correctly.
Contact is Morgan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 11/9/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Troy Cobbley
|
|
|
The fire alarm inspection failed. No sprinkler permit items tested.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 11/6/2018 | 11/7/2018 | 11/7/2018 | P | CANC |
Troy Cobbley
|
|
|
Could not perform testing due to fire alarm communication issues. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
The interconnections with the fire alarm system could not be tested, could not verify pressure relief vavles and the overhead doors have not been modified to remain less than 4' obstruction
Jordan Fuger is the contact for this final inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 10/16/2018 | 10/18/2018 | 10/18/2018 | P | CANC |
Troy Cobbley
|
|
|
Not ready for final
Jordan Fuger is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PASS |
Troy Cobbley
|
|
|
Forward flush test passed, Second floor rough-in passed and piping can be re-covered. Need ball drip piped, need pressure relief vavles piped, need interconnection with the fire alarm system tested, need soffits for the ESFR heads finished installed, need the overhead door stops installed as discussed.
Jordan Fuger is the contact for this rough to cover inspection. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PART |
Troy Cobbley
|
|
|
Main floor is complete except for the soffits at the ESFR heads. The second floor ceiling tile needs to be removed for a rough-in inspection.
Jordan Fuger is the contact for this RTC inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2018 | 10/2/2018 | 10/3/2018 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro tests passed.
|
INSP-Sprinkler Rough-in | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" in red where piping is ok to cover except where earth quake bracing is. All other areas can not be covered. The earth quake bracing material used is not what has been submitted/calculated and in some locations has not been installed in the spot as shown on plans. New calculations are required to be approved including new bracing locations. There are several overhead doors that exceed 4' when in the open position that will require sprinkler coverage beneath them. There are atleast two raisede metal work platforms that may require sprinkler coverage beneath. Earth quake bracing is missing from the 2 1/2" branchlines. Also one area the heads are overspaced.
I stopped the inspection after the above items had been noted so this list is not all inclusive of possible correction items.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test on both systems failed due to a visible loss on both guages
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/19/2018 | 9/20/2018 | 9/21/2018 | A | PART |
Tim Frost
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus
______________
Barely got started before I ran out of time. There is problems with conduits in the storage area. ESFR can not have obstruction. Went over the problem with the fitter and GC. Sway branch line restraints were missing in the office area I checked.
|
INSP-Sprinkler Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above the hardlids in the restrooms on levels 1 and 2 complete, approved for cover.
Jeff Chaney is the contact for this inspection. He needs a RTC in the Office area and bathrooms. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|