Information based on query as of Thursday, May 2, 2024.
Permit Information
Permit NumberFIR18-00541
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3536 W HILL RD
Project NameHILSIDE JR HIGH GYM BUILDING
Customer Number 
ePlanReviewYes
Description
[Hillside Jr. High Gymnasium]
The fire sprinkler scope of work consists of a single level building with a small mezzanine. There is one wet system. The building has a gym, common area, locker room, kitchen and bathrooms. The system is designed as a double grid. The 6” underground supplies a 4” riser and backflow preventer.

• The underground piping is under permit FIR18-00512

[BLD18-00944]
Permit to construct a new 28,750 square foot gymnasium, locker rooms, and cafeteria with associated support areas including restrooms, kitchen associated office, storage, and mechanical rooms on the existing Hillside Jr. High campus. Work also includes general site work. Special inspections required per attached Form 310. All work per the approved plans and notations. This project is in the WUI zone and required to comply with the Wilderness Urban Interface code as amended by the City of Boise. This building is fully fire sprinklered for area increase and is fully alarmed. JAR

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/13/20195/14/20195/14/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

sprinkler final - prefer after 1pm // Rick Phone #: ###-####
INSP-Sprinkler Rough-in3/26/20193/26/20193/26/2019PPASS
DetailsJim Page
Rough to cover inspection for overehad fire sprinkler in hallway next to gym complete, approved for cover.

Curt Phone #: ###-####
INSP-Final Inspection3/21/20193/22/20193/22/2019APART
DetailsJim Page
Fire sprinkler inspection for phase 1 TCO complete.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro3/13/20193/14/20193/14/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Tom Phone #: ###-####
INSP-Sprinkler Rough-in3/11/20193/11/20193/11/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above drop ceiling in kitchen area and cafeteria complete, notated city approved drawings with red ink areas approved for cover.

Roy Phone #: ###-####
INSP-Sprinkler Rough-in2/13/20192/14/20192/14/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, notated city approved drawings with red ink areas approved for cover.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in1/15/20191/16/20191/16/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids in locker room areas complete, notated city approved drawings with red ink areas appropved for cover.

Kurt Phone #: ###-####
INSP-Sprinkler Rough-in12/17/201812/17/201812/17/2018PPART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping complete, areas where pendant heads are to be installed will require a cover inspection before cover can be approved.

Rudy Phone #: ###-####