INSP-Final Inspection | 4/18/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, device testing/pass for fire alarm associated items completed on the 15APR2019 inspection.
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in/Hydro | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | DONE |
Jim Page
|
|
|
No pressure loss observed for overhead hydro.
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 4/12/2019 | 4/15/2019 | 4/15/2019 | P | CANC |
Troy Cobbley
|
|
|
Not ready for final. See morning comments. A re-inspection fee has been added due to the overhead hydro test failing twice before.
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in/Hydro | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed due to visible loss at the guage, need as-builts per earlier correction note for flex heads and additional earthquake bracing. All device interconnect with the new fire alarm panel passed.
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 4/12/2019 | 4/15/2019 | 4/12/2019 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|
INSP-Final Inspection | 4/10/2019 | 4/12/2019 | 4/12/2019 | P | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed due to visible loss on the guage.Separate inspection needs to be scheduled for a hydro test or rough-in.
Please call Chris ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in/Hydro | 4/12/2019 | 4/15/2019 | 4/12/2019 | P | CANC |
Jim Page
|
|
|
Please call Chris Ford Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|
INSP-Sprinkler Rough-in | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping approved for cover. Branch lines under mezzanine are 2 1/2 inch diameter pipe, top of piping is more than 6 inches down from point of attachment at the hangers, need to add sway bracing to branchlines under mezzanine. Will need to provide as-builts showing the addition of the sway bracing and addition of flex heads..
Please call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for the side sammys so that the cover could be repaired. The first side sammy I checked the retaining nut was bearly on.
Please call Chris Ford for above ground rough in Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|