INSP-Final Inspection | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Jim Page
|
|
|
Overspaced smoke detection has been corrected, final fire alarm inspection complete.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PART |
Jim Page
|
|
|
Final inspection for temperature sensors in dog house/over builds complete.
|
INSP-Final Inspection | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PART |
Jim Page
|
|
|
Fire alarm inspection for initiating devices and notification complete, a follow up inspection will be required to verify possible spacing issues with smoke detector placement, as of these notes a 30 day TCO is authorized by Ron Johnson for occupancy. If smoke detectors space correctly on the install then the fire alarm permit can be finaled but as mentioned, a follow up inspection will be required.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | CANC |
Troy Cobbley
|
|
|
The project related permit for the means of communication was not scheduled/inspected/passed. No inspection performed.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Final Inspection | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PART |
Jim Page
|
|
|
Fire alarm notification inspection complete, sprinkler monitoring complete, still need to test hood monitoring, in duct detectors and temperature sensors.
Phone #: ###-#### Inspection requested via web by Ken Webster
|
INSP-Conference | 1/15/2019 | 1/18/2019 | 1/18/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Phone #: ###-#### Inspection requested via web by Ken Webster
|