INSP-Final Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Please call Troy with frame.
Thank you and have a great day. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Final Inspection | 4/11/2019 | 4/12/2019 | 4/12/2019 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for final due to delays caused by the door installer. I did perform a rough-in inspection for the south warehouse sprinkler system which passed.
Please cordinate final with Troy Nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in/Hydro | 4/10/2019 | 4/11/2019 | 4/11/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, overhead door not installed.
Please cordinate hydro with Troy Nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in/Hydro | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test for the south system passed.
Please Cordinate with Troy Nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PART |
Jim Page
|
|
|
Rough in inspection for north warehouse system complete.
|
INSP-Sprinkler Rough-in/Hydro | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PART |
Jim Page
|
|
|
Hydrostatic test for north warehouse system witnessed, no pressure loss observed.
This will be hydro and rough in for north warehouse system. Please call Troy Nelson with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|