INSP-Final Inspection | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Rick Fry Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Final Inspection | 10/18/2019 | 10/21/2019 | 10/21/2019 | A | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints. Mike Phone #: ###-####
|
INSP-Final Inspection | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | FAIL |
Troy Cobbley
|
|
|
***FAIL Head plugged in RM106 MEP. No stamped plans on site. Unable to get ahold of contact MAS***
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining overhead fire sprinkler piping in area of work complete, area of work approved for cover.
rough to cover // Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Mark Scharfen
|
|
|
restroom area ok for cover. noted on site plans area verified. 8 heads.
Mike Phone #: ###-####
|