Information based on query as of Sunday, April 28, 2024.
Permit Information
Permit NumberMEC17-05457
StatusFinaled
Name PAIGE MECHANICAL GROUP INC
Site Address 2855 W LOCKHEED LN
Project NameBOI ARFF REMODEL / EXPANSION
Customer Number17.6789.22
ePlanReviewNo
Description
Alteration: Compressed AIr, Natural Gas, Flue, Hydronic, Water Balance.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/30/20198/1/20198/1/2019APASS
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige
- final ok
- signed occ card
Mec-Aging Inspection5/16/20195/16/20195/16/2019 PASS
DetailsJack Reynolds
WIP
Pressure Test2/14/20192/15/20192/15/2019APASS
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige
- 60 lb gas pressure test ok
Final2/5/20192/6/20192/6/2019ANR
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige
- phase lll has not been reviewed by code offical for green building requirements
- checked all hydronics, condensate lines and gas pipe in phase lll
- gas line is going through phase 3,4 which includes truck bays has not been pressure tested yet will need to see pressure test during phase 4
-
Rough-in12/17/201812/18/201812/18/2018APASS
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige
-100lb hydronics test ok
Rough-in12/17/201812/17/201812/17/2018PNR
DetailsJack Reynolds
Hydronic rough in Phone #: ###-#### Inspection requested via web by Nicholas Paige
Final9/28/201810/1/201810/1/2018APART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige- partial final on phase 2- temp occ card signed
Pressure Test8/30/20188/30/20188/30/2018PPASS
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 20lb gas pressure test ok
Pressure Test8/9/20188/9/20188/9/2018PPASS
DetailsJack Reynolds
hydronics pressure test- 100 lb hydronics test ok on phase 2. The piping R/I for hydronics will go into phase 3 and finish- ok for hydronics insulation in phase 2- hydronics connection to ceiling mount panels ok
Rough-in8/9/20188/9/20188/9/2018PPART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige- hydronics pressure
Pressure Test7/10/20187/10/20187/10/2018PPART
DetailsJack Reynolds
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60 lb gas pressure test for gas line from west end of building through garage,and into kitcken area and down the walls for gas range ok, gas line stops in kitcken for now but will extend further into building later- wall cover in kitcken area ok- need one more set of supports on gas line above ceiling