Final | 7/30/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - final ok - signed occ card
|
Mec-Aging Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | | PASS |
Jack Reynolds
|
|
|
WIP
|
Pressure Test | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60 lb gas pressure test ok
|
Final | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | NR |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - phase lll has not been reviewed by code offical for green building requirements - checked all hydronics, condensate lines and gas pipe in phase lll - gas line is going through phase 3,4 which includes truck bays has not been pressure tested yet will need to see pressure test during phase 4 -
|
Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige -100lb hydronics test ok
|
Rough-in | 12/17/2018 | 12/17/2018 | 12/17/2018 | P | NR |
Jack Reynolds
|
|
|
Hydronic rough in Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Final | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- partial final on phase 2- temp occ card signed
|
Pressure Test | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 20lb gas pressure test ok
|
Pressure Test | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Jack Reynolds
|
|
|
hydronics pressure test- 100 lb hydronics test ok on phase 2. The piping R/I for hydronics will go into phase 3 and finish- ok for hydronics insulation in phase 2- hydronics connection to ceiling mount panels ok
|
Rough-in | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- hydronics pressure
|
Pressure Test | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60 lb gas pressure test for gas line from west end of building through garage,and into kitcken area and down the walls for gas range ok, gas line stops in kitcken for now but will extend further into building later- wall cover in kitcken area ok- need one more set of supports on gas line above ceiling
|