Information based on query as of Sunday, May 5, 2024.
Permit Information
Permit NumberMEC19-01155
StatusFinaled
Name TML LLC
Site Address 3075 W CRESCENT RIM DR
Project Name 
Customer Number22823-13
ePlanReviewNo
Description
New: hvac
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/5/20202/5/20202/5/2020PPASS
DetailsJack Reynolds
Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- final ok area B
- occ card signed
Final2/3/20202/4/20202/4/2020AFAIL
DetailsJack Reynolds
Antonio is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
- need dryer tags installed on 104, 207 and 304
Final1/31/20201/31/20201/31/2020PFAIL
DetailsChad Schwendiman
Air balance will be sent to you hopefully before the inspection. Antonio will be the contact. Phone #: ###-#### Inspection requested via web by stan lillquist - Boilers need to terminate per the manufacures listing, Need dryer vent lenght tags in units 104, 207 and 304
Final1/29/20201/30/20201/30/2020AFAIL
DetailsChad Schwendiman
Temp Occupancy of Area B. Please inspect mid-morning as we are waiting for as air balance report gets typed up. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist - Approved TCO plan does not include a TCO for area B, only area A. Need accurate dryer vent lenght tags installed in all units. Clearance around boiler flue's from sheeting okay.
Final1/16/20201/17/20201/17/2020APART
DetailsJack Reynolds
Can you come around 11am? Temp occupancy Area A and Garage level. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
Temp final ok on area A units 103,104,105,106, lobby
203, 204, 205,
302 and parking garage
Final1/15/20201/15/20201/15/2020PNR
DetailsJack Reynolds
Temp occupancy of Area A and parking garage. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- outside terminations need finished
- 1st floor grilles in common area need finished
- wine cellar 2nd floor needs finshed and running
- need documents from 3rd party on parking garage sensors and exhaust system showing system has been tested
Conference1/13/20201/13/20201/13/2020ADONE
DetailsJack Reynolds
Walk through of area A and parking garage.
- Parking garage needs smoke dampers installed on east side per approved City prints. Talked with contractor and general about topic. Parking garage needs to be completed fully for TCO
- need to seal around penetrations on supply fan and exhaust fan
- condensate for elevator equipment room needs installed by others
Conference12/23/201912/23/201912/23/2019PDONE
DetailsJack Reynolds
Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- talked with Antonio about finals on area A
- wine cellar on 2nd floor needs finished still
Rough-in12/5/201912/5/201912/5/2019PPASS
DetailsJack Reynolds
2nd floor corridor. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- 2nd floor corridor R/I ok
Rough-in11/22/201911/22/201911/22/2019PPASS
DetailsBen Livingston
1st floor corridor. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- 1st floor corridor duct seal, breezway duct insulation -
Rough-in11/19/201911/19/201911/19/2019PFAIL
DetailsJack Reynolds
2nd floor corridor. Antonio is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
- missing F/S damper on 8" duct 2nd floor
Rough-in11/8/201911/12/201911/12/2019APASS
DetailsJack Reynolds
3rd floor corridor. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- 3rd floor fire/smoke damper clearances ok for angles
- duct seal R/I ok
Rough-in11/8/201911/8/201911/8/2019PCANC
DetailsJack Reynolds
3rd floor corridor. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- need fire damper installation instructions for rec and round fire dampers on 3rd floor for inspections
Rough-in10/25/201910/25/201910/25/2019PPASS
DetailsJack Reynolds
Condo 101, Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 101 R/I duct seal ok
- breeze way supply and return ducting R/I duct seal ok for insulation
Rough-in10/17/201910/18/201910/18/2019APASS
DetailsJack Reynolds
Soffit rough in condo 102. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
-unit 102 R/I duct seal ok
Rough-in10/14/201910/14/201910/14/2019PPASS
DetailsJack Reynolds
Soffit inspection in condo 107 and fire damper openings. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 107 duct seal R/I ok
- F/S dampers not ready for clearance inspection
- boiler flues need 6" enclosed clearances to combustibles
Rough-in10/8/201910/8/201910/8/2019PPASS
DetailsJack Reynolds
Soffit rough in condo 207. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 207 duct seal R/I ok
Rough-in9/30/201910/1/201910/1/2019APASS
DetailsJack Reynolds
Condo 201 rough in. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 201 duct seal R/I ok
Rough-in9/26/20199/26/20199/26/2019PPASS
DetailsJack Reynolds
Soffit rough in condo 208. Antonio is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 208 R/I duct seal ok
Rough-in9/20/20199/20/20199/20/2019PPASS
DetailsJack Reynolds
Soffit rough in on condos 202 and 206, Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 202 R/I duct seal ok/ dryer is well over 60' in length with fittings and straight pipe
-unit 206 R/I duct seal ok
Rough-in9/16/20199/17/20199/17/2019APASS
DetailsJack Reynolds
Soffit inspection in 304. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 304 R/I ok duct seal soffit cover ok
Rough-in9/12/20199/13/20199/13/2019APASS
DetailsBen Livingston
Soffits inspection in 303, Antonio is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
- 303 soffits, 205 condensate conection wine room cooler okay -
Rough-in9/6/20199/6/20199/6/2019PPASS
DetailsJack Reynolds
Soffits in condo 301, Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 301 R/I and duct seal ok
Rough-in8/26/20198/26/20198/26/2019PPASS
DetailsJack Reynolds
Soffit rough in for condos 103 ; 106. Contact Antonio ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty
- 103,106 R/I duct seal ok
Rough-in8/21/20198/21/20198/21/2019PPASS
DetailsJack Reynolds
Rough in for Condo''s 104 ; 105. Contact Antonio ###-#### Phone #: ###-#### Inspection requested via web by Dan Flaherty
- unit 104, 105 R/I duct seal ok
Rough-in8/9/20198/9/20198/9/2019PPASS
DetailsJack Reynolds
Soffit inspection in condo 203. Tyson is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
-R/I duct seal 203 ok
Rough-in8/7/20198/7/20198/7/2019PPASS
DetailsJack Reynolds
Soffit rough in on condo 204 ; 205, exclude wine room rough in 205. Tyson is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
- 204 and 205 duct seal ok
- wine room in 205 will be at a later date
Rough-in8/1/20198/2/20198/2/2019AFAIL
DetailsJack Reynolds
Soffit cover in condos 204 and 205, Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- duct seal is not finished
- line set insulation for wine cellar needs insulation fixed
- condensate line for wine cellar need to be min 3/4 and approved materials. use pump to achieve grade then gravity drain to approved location
Rough-in7/1/20197/2/20197/2/2019APART
DetailsJack Reynolds
South end dryer vent, Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
- dryers units on south side 101,102,107 ok
201 needs two seams in the wall sealed
202,206,207 and 5th unit on the 2nd floor that wasn't labeled ok
301,303,304 ok
Rough-in6/17/20196/17/20196/17/2019PPASS
DetailsBen Livingston
Soffit rough in on condo 302. Antonio is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
302 soffit duct okay
Rough-in6/7/20196/10/20196/10/2019APASS
DetailsJack Reynolds
3rd floor north dryer vents. Antonio is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
- 1st and 2nd floor north side dryer vents ok
Rough-in5/14/20195/15/20195/15/2019APASS
DetailsJack Reynolds
inspect dryer vent in condo 302, Antonio is the contact Phone #: ###-#### Inspection requested via web by stan lillquist
- unit 302 dryer vent of 8' ok
- talked with Antonio about the rest of the dryer vents being longer than 35'. Prints show labels being installed near dryer stating dryers being capable of exhausting at least 60'.