Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020
|
Third Notice | | 5/12/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Second Notice | | 4/13/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | | 3/26/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Permanent Occupancy | | | 3/16/2020 | | DONE |
|
|
|
|
BLD-Final | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Reading
|
FIRE-Final Inspection | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, final life fire safety inspection is complete.
Phone #: ###-#### Inspection requested via web by Sam Reading
|
FIRE-Final Inspection | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | FAIL |
Jim Page
|
|
|
Could not test release function on north stairwell door due to wiring issue, will need to retest release after repair is made.
Test remote unlock switch for L5 stairwell doors. Phone #: ###-#### Inspection requested via web by Sam Reading
|
FIRE-Final Inspection | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | CANC |
Jim Page
|
|
|
Code exceptions done. Need final ok for c of o Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
|
BLD-Final | 3/2/2020 | 3/3/2020 | 3/3/2020 | A | CANC |
Dave Hannah
|
|
|
Code exceptions done. Need final ok for c of o Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
|
Plan Reviewer's activity | | | 3/2/2020 | | DONE |
Jason Blais
|
|
|
Alternate on stairways doors locking hardware per 2018 code provisions approved by building official and fire marshal uploaded into ePlanReview case.
|
Plan Reviewer's activity | | | 2/28/2020 | | DONE |
Jason Blais
|
|
|
Alternate on door hardware for two rooms approved by building official and fire marshal uploaded into ePlanReview case.
|
BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Reading ok for tco ok for co after fire gos perm
|
FIRE-Final Inspection | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety is complete for area of work. Fire sprinkler inspection is complete, fire alarm inspection is complete and NFPA72 compliant, waiting on as-builts to be submitted/approved for candella change in corner offices, fire alarm permit can be finaled after fire alarm permit is back in issued status. A formal letter of approveal to the building code official is required from the architect requesting the 2018 chapter 10 IFC exception for stairwell doors to be allowed locked and release on fire alarm activation as well as the combination tumbler look setup on the file room door and secure storage directly south of the file room. Combination looks do not meet IFC requirements for single action operation and will require approval from the building code official. 30 day TCO authorized by Joe Bruce, Fire Section Supervisor.
Phone #: ###-#### Inspection requested via web by Sam Reading
|
FIRE-Final Inspection | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | FAIL |
Troy Cobbley
|
|
|
Provide all of the small documents, provide letter from the architect for compliance with the 2018 IFC 1010.1.9.11 exception #3, repair the exit sign in the 4th floor conference room.
Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Final | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
|
FIRE-Conference | 2/7/2020 | 2/7/2020 | 2/7/2020 | A | DONE |
Jim Page
|
|
|
Fire conference complete, discussed items for life fire safety inspection. All door hardware to include delayed egress needs to in place and functional. Stairwell card readers needs to comply with 2015 IFC section 1010.1.9.11 per conversation with Joe Bruce, Fire Section Supervisor.
|
FIRE-Final Inspection | 2/4/2020 | 2/7/2020 | 2/7/2020 | A | CANC |
Jim Page
|
|
|
Was suppose to be scheduled as conference instead of final, this request is cancelled.
Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Final | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
|
BLD-Final | 2/4/2020 | 2/7/2020 | 2/7/2020 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
|
BLD-Ceiling Grid Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Dave Hannah
|
|
|
Cover inspection for 4th floor Conference and break room. Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Ceiling Grid Inspection | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Dave Hannah
|
|
|
Cover inspection for level 5, West and Northwest corridors and offices. Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Ceiling Grid Inspection | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Dave Hannah
|
|
|
inspection for cover Level 5 from Gridline-C south Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Ceiling Grid Inspection | 1/7/2020 | 1/7/2020 | 1/8/2020 | P | PART |
Dave Hannah
|
|
|
Grid inspection east of elevators. excepting corridors, admin storage room, and mail room. Phone #: ###-#### Inspection requested via web by Sam Reading offices and hallway east side ok
|
FIRE-Conference | 12/24/2019 | 12/30/2019 | 12/30/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Emergency light fixture layout, workstation furniture, additional signage requirements Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Wall cover | 12/5/2019 | 12/5/2019 | 12/11/2019 | P | PASS |
Dave Hannah
|
|
|
L4 shaft wall. Fire-rated enclosure under stairs Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Wall cover | 11/18/2019 | 11/18/2019 | 11/21/2019 | P | PASS |
Dave Hannah
|
|
|
Fire rating at 4th floor demising wall. Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Framing/Rough-in | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PART |
Dave Hannah
|
|
|
Ceiling cover for hardlids on level 5 Phone #: ###-#### Inspection requested via web by Sam Reading hard lids ok to cover
|
BLD-Wall cover | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Dave Hannah
|
|
|
Fire Treated Plywood inspection for south stair interior wall and Secure store room West. Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Wall cover | 10/11/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Dave Hannah
|
|
|
Fire treated plywood walls L5 corridors and East Phone #: ###-#### Inspection requested via web by Sam Reading
|
BLD-Conference | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | DONE |
Dave Hannah
|
|
|
Inspector requirements for Tenant build-out Phone #: ###-#### Inspection requested via web by Sam Reading
|
Issue PAID IN FULL permit | | | 8/19/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/19/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2019 | | DONE |
|
|
|
emailed brooke informing her that there are fees still due for issuance
|
Plan assigned to (CDM) | 6/11/2019 | 6/11/2019 | 7/15/2019 | | PASS |
Carl D Madsen
|
|
|
07/04 USAO L-3
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2019 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/15/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 7/15/2019 | | DONE |
|
|
|
all met-emailed brooke@bvadev.com the fees that are due
Need GC-met
Need Rev Val-met
|
Routing - MECHANICAL | 7/10/2019 | | 7/11/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/3/2019 | 7/6/2019 | 7/3/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/11/2019 | 6/11/2019 | 7/2/2019 | | PASS |
Mark Scharfen
|
|
|
07.02.2019-IFC review complete. Uploaded rev_fire 07.02.2019.pdf.
|
1st review completed | | | 7/2/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/11/2019 | | 6/28/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 6/11/2019 | | 6/14/2019 | | FAIL |
Troy James
|
|
|
see eplan
|
Routing - PLANNING | 6/11/2019 | | 6/12/2019 | | PASS |
Nicolette Womack
|
|
|
Only interior work approved.
|
Routing - PUBLIC WORKS | 6/11/2019 | | 6/12/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 6/11/2019 | | 6/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLUMBING | 6/11/2019 | | 6/11/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 6/7/2019 | | PASS |
|
|
|
|
Intake Approval | | | 6/3/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the following to complete your prescreen:
1) The lighting compliance COMcheck is required to be printed on the plans. See checklist for requirement. A separate document is not permitted for the submittal.
2) Sheet G001 lists the incorrect mechanical and plumbing code adopted by the City of Boise. Please see the following link for currently adopted codes by the City of Boise: https://www.cityofboise.org/departments/planning-and-development-services/building/building-permits/general-building-information-300/301-current-codes/
3) Sheets A401-A404, A562, E100, E203, E402, E403, E501, S101, M503, are listed on the drawing index, but have not been uploaded into the drawings folder. Please provide drawings or remove from drawing index.
4) Sheet S001 lists the 2012 IBC in multiple locations for special inspections. The City of Boise has adopted the 2015 IBC. Please revise the sheets to reflect the adopted codes and revise drawings as necessary with current code.
5) Sheet E503 has been included in the drawing files, but not reflected in the sheet index. Update the drawings and sheet index to match.
6) Statement of special inspections is marked on the checklist, but could not be found in the documents folder. Upload this document as required by the checklist.
7) Plan sheets (See sheet Structural Drawings - S001) do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
|
Application received | | | 5/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2019 9:21AM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|