Third Notice | | 7/13/2020 | 8/11/2020 | | DONE |
|
|
|
mailed with third and filal follow up letter
|
Third Follow up | | | 8/11/2020 | | DONE |
|
|
|
final
|
Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
MAILED 7-9-2020 WITH 2 FOLLOW UP
|
Second Follow up | | | 7/8/2020 | | DONE |
|
|
|
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020 with first follow up
|
First Follow up | | | 5/7/2020 | | DONE |
|
|
|
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Third Notice | | 2/11/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Second Notice | | 1/9/2020 | 2/6/2020 | | DONE |
|
|
|
mailed 2-7-20
|
First Notice | | 12/19/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
Permanent Occupancy | | | 12/9/2019 | | DONE |
|
|
|
|
BLD-Final | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
Zoning Approval | 11/19/2019 | 11/19/2019 | 11/19/2019 | | PASS |
KayCee Babb
|
|
|
As reviewed under modifications approved through DRH19-00485.
|
BLD-Final | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PART |
Tony Young
|
|
|
Bruce ###-####,, needs guard rail at stair landing to meet max opening 4", all else ok pending trades
|
BLD-Final | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PEND |
Tony Young
|
|
|
Bruce ###-####,, needs to close up stair around window,, then ok pending others,, need to verify with Project Manager Ron Hill prior to passing completely
|
FIRE-Final Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. 2015 IFC was approved per official request to Ron Johnson with Boise Fire to be used for the access control system due to the changes made in the code cycle between 2012 IFC and 2015 IFC, code segment 1010.1.9.8 is allowed from the 2015 IFC instead of the requirements of the 2012 IFC section 1008.1.9.8.
Final life fire safety inspection is complete.
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PART |
Jim Page
|
|
|
Life fire safety inspection for phase 2 TCO complete.
|
BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, temp occupancy ok in aggreed area,, gym, mezzanine
|
FIRE-Final Inspection | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | NR |
Jim Page
|
|
|
Fire alarm inspection failed, all other life fire safety items are in place and active for phase 2 TCO.
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, fire alarm system not ready for inspection.
late morning // Bruce Phone #: ###-####
|
BLD-Final | 4/18/2019 | 4/19/2019 | 4/19/2019 | P | NR |
Jim Storey
|
|
|
Bruce Phone #: ###-####
|
BLD-Final | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,,, TCO OK phase 1 west area
|
FIRE-Final Inspection | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PART |
Jim Page
|
|
|
TCO Phase 1 life fire safety inspection complete.
Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Tony Young
|
|
|
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | CANC |
Jim Page
|
|
|
Cancelled per conversation with GC, inspection will be rescheduled for a later date.
Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, entry ok
|
FIRE-Conference | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | DONE |
Jim Page
|
|
|
Conference complete.
Coordinated for 930AM with Bruce
|
BLD-Conference | 1/3/2019 | 1/8/2019 | 1/8/2019 | A | PART |
Tony Young
|
|
|
Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####,, ?s about a final
|
FIRE-Conference | 1/3/2019 | 1/8/2019 | 1/8/2019 | A | DONE |
Jim Page
|
|
|
Temp C of O request- See Ron Hill to schedule plan Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | PART |
Jim Sly
|
|
|
Bruce Phone #: ###-#### Select ceilings........OK.
|
BLD-Ceiling Grid Inspection | 12/26/2018 | 12/26/2018 | 12/27/2018 | P | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### second floor ok to flood
|
BLD-Ceiling Grid Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, ok to set exterior tiles to get cabinets in
|
BLD-Framing/Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####,, gym wall fire blocking,, ok to cover
|
BLD-Framing/Rough-in | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, gym walls ok,, fireblocking almost done,, ok to cover when ready
|
BLD-Framing/Rough-in | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, 2nd floor ok,, fire blocking also ok
|
BLD-Framing/Rough-in | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | DEFR |
Tony Young
|
|
|
Bruce Phone #: ###-####,, out of time
|
BLD-Framing/Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, walls on west side ok
|
BLD-Framing/Rough-in | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, frame walk through,, ok pending trades,, need fire blocking at certain areas,, ok to start sheet rocking areas..
|
BLD-Framing/Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | CANC |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 7/26/2018 | 7/30/2018 | 7/30/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, above ceiling
|
BLD-Framing/Rough-in | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, floor areas,, need to add squash blocks under some of bleacher beams,, ok after trades are passed
|
BLD-Conference | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, all exposed insulating foam needs to be covered by an approved material for fire/smoke control
|
BLD-Conference | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, fire blocking ?s on ridgid insulation areas,, same as wood 2012 IBC 718.2.2?
|
BLD-Footing | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PEND |
Tony Young
|
|
|
Bruce Phone #: ###-####
|
BLD-Footing | 10/12/2017 | 10/12/2017 | 10/13/2017 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####.. pending special inspection
|
Issue PAID IN FULL permit | | | 6/29/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/29/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/29/2017 | | DONE |
|
|
|
talked to Regina at ACHD (engineer planner) she said no fees would be due-the issues have to do with the vacation of the alley between the school and ACHD-Regina said all legal documents are in place. She was in agreement that the building permit for us could be issued
|
Plan assigned to (CJW) | 4/12/2017 | 4/12/2017 | 6/28/2017 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Apr 18 - 5 days) (Apr 26 - 10 days) (190 sheets) Boise High Addition
|
Routing - ELECTRICAL | 6/28/2017 | | 6/28/2017 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2017 | | DONE |
|
|
|
|
Routing PW Drainage | 6/28/2017 | | 6/28/2017 | | PASS |
Brian Murphy
|
|
|
|
Permit Ready to Issue | | | 6/28/2017 | | DONE |
Christina Prado
|
|
|
****need ACHD all else met***Need ACHD, RP, GC Form & Revised Cert of Value for issuance
*** Check State of Idaho Plan Check fees prior to added any additional fees due ***
|
Routing - PLAN CHECK | 6/27/2017 | | 6/27/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
the alternate and licensing agreement items were recieved, approved and uploaded into the system
|
Plan resubmittals requested | | | 5/9/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/4/2017 | | 5/9/2017 | | PASS |
Carl Westfall
|
|
|
Jordan Terry (KPFF)
|
Routing - PLAN CHECK | 5/4/2017 | | 5/9/2017 | | FAIL |
Carl Westfall
|
|
|
Items 1, 5, 8.1 and 8.2 are not fully resolved.
|
Routing - Design Review | 5/4/2017 | | 5/9/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Sewer Rating | 5/4/2017 | | 5/8/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - ELECTRICAL | 5/4/2017 | | 5/6/2017 | | FAIL |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 5/4/2017 | | DONE |
|
|
|
Drawings routed
|
Route to Impact Fee Review | 4/24/2017 | 4/27/2017 | 4/25/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 4/12/2017 | | 4/24/2017 | | FAIL |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 4/12/2017 | | 4/24/2017 | | FAIL |
Carl Westfall
|
|
|
Jordan Terry (KPFF)
|
1st review completed | | | 4/24/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/24/2017 | | DONE |
|
|
|
|
Routing - ELECTRICAL | 4/12/2017 | | 4/19/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 4/12/2017 | | 4/17/2017 | | PASS |
Melissa Jannusch
|
|
|
RP is TBD. Gutter protection (wattles with sand bags) along north gutter, DI protection, material storage, concrete washout, dust control prevention
|
Routing - PLUMBING | 4/12/2017 | | 4/17/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - FIRE | 4/12/2017 | 4/12/2017 | 4/14/2017 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Street Lights | 4/13/2017 | | 4/13/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 4/13/2017 | | 4/13/2017 | | FAIL |
Brian Murphy
|
|
|
need onsite or ACHD OK, APDX J TREATMENT ECT
|
Routing - MECHANICAL | 4/12/2017 | | 4/13/2017 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 4/12/2017 | | 4/13/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 4/12/2017 | | 4/12/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 4/12/2017 | | 4/12/2017 | | FAIL |
Sarah Schafer
|
|
|
Design Review not completed for this project.
|
Intake Approval | | | 4/12/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 4/11/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 11 2017 2:56PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|