First Notice | | 10/17/2019 | 3/9/2020 | | DONE |
|
|
|
This permit finaled on the web by Ami Ostrow
|
BLD-Final | 10/4/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Dave Hannah
|
|
|
Call Jesse please. Thank you! Phone #: ###-#### Inspection requested via web by Ami Ostrow
|
Permanent Occupancy | | | 10/7/2019 | | DONE |
|
|
|
|
BLD-Final | 10/3/2019 | 10/4/2019 | 10/4/2019 | P | CANC |
Dave Hannah
|
|
|
Call Jesse please! Phone #: ###-#### >> Inspection requested via web by Ami Ostrow Inspection cancelled from web by: Ami Ostrow
|
FIRE-Final Inspection | 10/3/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire sprinkler ispection is complete, fire aalrm inspection is complete, heat trace ispection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete.
Call jesse please Phone #: ###-#### Inspection requested via web by Ami Ostrow
|
BLD-Conference | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | PASS |
Dave Hannah
|
|
|
Please call Jesse Phone #: ###-#### Inspection requested via web by Ami Ostrow
|
FIRE-Final Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | FAIL |
Jim Page
|
|
|
Provide signage for doors 105-4 and S1-1 reading Roof Top Access as well as Fire sprinkler Floor Control access as discussed. Provide signage on S2-1 stating no roof top access per building fire code review comments, notes 8 and 15.
Please call Jesse for fire / life / safety. Phone #: ###-#### Inspection requested via web by Ami Ostrow
|
BLD-Conference | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | CANC |
Tony Young
|
|
|
Jason Phone #: ###-####
|
BLD-Conference | 9/25/2019 | 9/26/2019 | 9/26/2019 | P | DEFR |
Tony Young
|
|
|
Jason Phone #: ###-####,,, wanted to show 425 fixes?
|
BLD-Final | 9/23/2019 | 9/24/2019 | 9/24/2019 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### ok for tco
|
FIRE-Final Inspection | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Jim Page
|
|
|
Partial final inspwection for life fire safety is complete, item left for life fire safety is signage placed in north stairwell, install signage for fire sprinkler floor control access at discussed doors. Fire sprinkler inspection is complete, fire alarm inspection is complete. 45 day TCO authorized per conversation with Ron Johnson for life fire safety.
Jason Phone #: ###-####
|
Temporary Occupancy | 9/24/2019 | 11/8/2019 | 9/24/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
|
PubWorks Occupancy Approval | 9/24/2019 | 9/24/2019 | 9/24/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | CANC |
Tell Riley
|
|
|
jason Phone #: ###-####//walked through units prior to TCO//will be calling for finals next week//
|
FIRE-Conference | 9/19/2019 | 9/19/2019 | 9/19/2019 | A | PART |
Jim Page
|
|
|
Items noticed on conference walkthrough, provide fire alarm notification in trash rooms, every level. Provide notification in level 4 elevator lobby.
|
FIRE-Final Inspection | 9/17/2019 | 9/19/2019 | 9/19/2019 | A | CANC |
Jim Page
|
|
|
Request was for a conference on areas completed, this request is cancelled.
Jason Phone #: ###-####
|
FIRE-Final Inspection | 9/12/2019 | 9/16/2019 | 9/17/2019 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Jason Phone #: ###-####
|
Zoning Approval | 9/17/2019 | 9/17/2019 | 9/17/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Framing/Rough-in | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 9/12/2019 | 9/16/2019 | 9/16/2019 | P | CANC |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 9/10/2019 | 9/12/2019 | 9/12/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled per conversation with point of contact, this request is cancelled.
Jason- inspection for Levels #2 and #3 Phone #: ###-####
|
BLD-Conference | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 9/3/2019 | 9/3/2019 | 9/4/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Permit Ready to Issue | | | 8/29/2019 | | DONE |
|
|
|
PLAN MOD - fees due, do not reissue
|
(F) Reprint permit | | | 8/29/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/29/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/29/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/27/2019 | 8/27/2019 | 8/28/2019 | | PASS |
Carl Westfall
|
|
|
plan mod
|
Plan Modification Accepted | | | 8/28/2019 | | PASS |
|
|
|
Did plan intake review and sent to the permits desk
|
Routing - PLAN CHECK | 8/28/2019 | | 8/28/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan Reviewer's activity | | | 8/28/2019 | | PASS |
|
|
|
The 3rd plan mod was approved
|
BLD-Framing/Rough-in | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Dave Hannah
|
|
|
jASON Phone #: ###-####
|
Plan Modification Accepted | | | 8/27/2019 | | DONE |
|
|
|
unit 506 is being removed from this permit as it is lagging in completion due to owner finish upgrades. all of the lift safety items will be installed and signed off prior to the entire building receiving certificate of occupancy
|
BLD-Framing/Rough-in | 8/19/2019 | 8/19/2019 | 8/20/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-#### iner shaft wall mec shaft ok to cover floors 2-5
|
BLD-Framing/Rough-in | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Other | 8/7/2019 | 8/7/2019 | 8/8/2019 | P | PASS |
Dave Hannah
|
|
|
Jason-sofit Phone #: ###-#### 5th floor
|
BLD-Framing/Rough-in | 8/6/2019 | 8/6/2019 | 8/7/2019 | P | FAIL |
Dave Hannah
|
|
|
Jason Phone #: ###-#### needs to add second layer of sheetrock trash shut wall
|
BLD-Framing/Rough-in | 8/5/2019 | 8/5/2019 | 8/6/2019 | P | CANC |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Dave Hannah
|
|
|
Jason-trash shoot rooms Phone #: ###-####
|
BLD-Framing/Rough-in | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | FAIL |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 6/13/2019 | 6/13/2019 | 6/17/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PART |
Dave Hannah
|
|
|
JASON Phone #: ###-#### 4th floor corrador drops ok to cover
|
BLD-Energy code compliance | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 6/3/2019 | 6/3/2019 | 6/4/2019 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 5/15/2019 | 5/15/2019 | 5/21/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 5/20/2019 | 5/20/2019 | 5/21/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 5/16/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-#### 3rd floor corr ok to cover
|
BLD-Framing/Rough-in | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### 3rd fl corr drops ok and stair tower to roof ok to cover4
|
BLD-Framing/Rough-in | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | CANC |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | P | CANC |
Dave Hannah
|
|
|
jason Phone #: ###-####
|
BLD-Energy code compliance | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 4/15/2019 | 4/15/2019 | 4/16/2019 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### drop ceilings 4th floor first 5 units ok
|
BLD-Energy code compliance | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 4/10/2019 | 4/11/2019 | 4/11/2019 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 4/5/2019 | 4/8/2019 | 4/8/2019 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### third floor drop ceilings ok
|
BLD-Framing/Rough-in | 4/2/2019 | 4/3/2019 | 4/4/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 4/1/2019 | 4/1/2019 | 4/2/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 3/26/2019 | 3/26/2019 | 3/27/2019 | P | DONE |
Dave Hannah
|
|
|
5th level // Jesse Phone #: ###-####
|
BLD-Energy code compliance | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | DONE |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-#### drop ceilings rms 211-215
|
BLD-Framing/Rough-in | 3/19/2019 | 3/19/2019 | 3/20/2019 | P | PART |
Dave Hannah
|
|
|
jason Phone #: ###-####5th foor ok to rock first 8ft of walls first 4 rooms
|
BLD-Energy code compliance | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PART |
Dave Hannah
|
|
|
jason Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2019 | 3/15/2019 | 3/19/2019 | P | CANC |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2019 | 3/18/2019 | 3/19/2019 | A | CANC |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 3/15/2019 | 3/15/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Dave Hannah
|
|
|
Jesse Phone #: ###-####
|
BLD-Framing/Rough-in | 3/7/2019 | 3/7/2019 | 3/14/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 3/8/2019 | 3/8/2019 | 3/11/2019 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/7/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2019 | | DONE |
|
|
|
PLAN MOD
|
BLD-Other | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PART |
Dave Hannah
|
|
|
Jason-fire caulking-plan mod doesn''t have anything to do with this inspection (per Jason) Phone #: ###-#### rim in ceiling of two hr wall sw side 3rd flr
|
Routing - FIRE | 2/21/2019 | 2/21/2019 | 3/5/2019 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Plan assigned to (CJW) | 2/20/2019 | 2/20/2019 | 3/5/2019 | | PASS |
Carl Westfall
|
|
|
plan mod for Afton II (routed to staff)
|
Plan Reviewer's activity | | | 3/5/2019 | | DONE |
|
|
|
Plan mod approved
|
BLD-Other | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PART |
Dave Hannah
|
|
|
fire proofing // Jason Phone #: ###-####
|
BLD-Energy code compliance | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PART |
Brandon Shaw
|
|
|
Per walk through, seal all vertical penetrations, 4th floor units...
|
BLD-Energy code compliance | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Mike Jordan
|
|
|
Jason-per Jason-doesn''t have anything to do with the plan mod that''s in for review Phone #: ###-####. 3rd floor insulation ok. 2nd floor, 2hr. wall ok per alternate detail at rim board.
|
Routing PW Sewer Rating | 2/21/2019 | | 2/22/2019 | | PASS |
Angela Hardy
|
|
|
New single-user toilet room on 3rd story
|
Routing - PLAN CHECK | 2/20/2019 | | 2/21/2019 | | PASS |
Carl Westfall
|
|
|
2nd plan mod approved
|
Plan Modification Accepted | | | 2/20/2019 | | DONE |
|
|
|
Instead of installing gypsum board in concelaed spaces within the units it is preferred to install non-combustible insulation, specifcations have been proved for insulation to be installed.
|
BLD-Energy code compliance | 2/13/2019 | 2/14/2019 | 2/15/2019 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### second floor ok ok to start insulating thrird fl
|
BLD-Framing/Rough-in | 2/8/2019 | 2/11/2019 | 2/12/2019 | A | PART |
Dave Hannah
|
|
|
2nd floor - Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-#### needs to see how they are going to protect corrador wall that shower side
|
BLD-Energy code compliance | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PART |
Brandon Shaw
|
|
|
5 rooms on 2nd floor
|
BLD-Framing/Rough-in | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### ok to insulate 5 rooms on 2nd floor
|
BLD-Framing/Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Hold downs, 2nd. floor.
|
BLD-Framing/Rough-in | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: 2###-#### dects ok
|
BLD-Energy code compliance | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-#### corradors ceilings ok
|
BLD-Framing/Rough-in | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PART |
Dave Hannah
|
|
|
jason Phone #: ###-#### ok to rock lids and top2ft of corradors
|
BLD-Framing/Rough-in | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### engineering on trusses for extra insulation dead load is ok 1.8 lbs at highist point ok to rock
|
BLD-Energy code compliance | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PART |
Brandon Shaw
|
|
|
Townhomes - 201, 202, & 203
|
BLD-Energy code compliance | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | NR |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### air seal ok on
|
BLD-Framing/Rough-in | 11/26/2018 | 11/27/2018 | 11/27/2018 | A | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 11/21/2018 | 11/23/2018 | 11/23/2018 | P | CANC |
Brandon Shaw
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | NR |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Conference | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | DONE |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Permit Ready to Issue | | | 10/29/2018 | | DONE |
|
|
|
PLAN MOD DO NOT REISSUE
|
CHANGE STATUS TO (ISS) | | | 10/29/2018 | | DONE |
|
|
|
PLAN MOD
|
Plan assigned to (CJW) | 10/24/2018 | 10/24/2018 | 10/26/2018 | | PASS |
Carl Westfall
|
|
|
Plan Mod - The Afton - routed
|
Plan Reviewer's activity | | | 10/26/2018 | | PASS |
|
|
|
Plan mod review approved
|
Plan Reviewer's activity | | | 10/25/2018 | | DONE |
|
|
|
Plan intake review approved
|
Routing - PLAN CHECK | 10/25/2018 | | 10/25/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing PW Sewer Rating | 10/25/2018 | | 10/25/2018 | | PASS |
Morgan Webb
|
|
|
SAME NUMBER OF APARTMENTS.
|
Plan Modification Accepted | | | 10/24/2018 | | DONE |
|
|
|
PLAN MOD - Unit 406 was revised to have the master bathroom larger, unit 512 was revised to match the other 212, 312, and 412 units
|
BLD-Framing/Rough-in | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
Print permit w/o conditions | | | 4/18/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/9/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/9/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2018 | | DONE |
|
|
|
Left a message for Tyler informing him that this permit is showing as 2 days past date. recommended that he send in a request for a 180 day extension
|
Plan assigned to (CJW) | 12/14/2017 | 12/14/2017 | 3/6/2018 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Jan 17 - 25 days) (211 sheets) Afton Phase 2
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2018 | | DONE |
Christina Prado
|
|
|
NEED
ACHD
GC FORM - met
REVISE CERT - met
|
Routing - PLAN CHECK | 3/2/2018 | | 3/5/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 3/5/2018 | | 3/5/2018 | | PASS |
Carl Westfall
|
|
|
Jared Bauder (CH2M Hill)
|
Route to Impact Fee Review | 2/28/2018 | 3/3/2018 | 3/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals received | | | 3/2/2018 | | DONE |
|
|
|
|
1st review completed | | | 2/28/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/28/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/12/2018 | | 2/22/2018 | | FAIL |
Carl Westfall
|
|
|
Emailed the plan review report
|
Routing Off Site - STRUCTURAL | 2/12/2018 | | 2/18/2018 | | FAIL |
Carl Westfall
|
|
|
Jared Bauder (CH2M Hill)
|
Routing - PLUMBING | 2/12/2018 | | 2/15/2018 | | PASS |
Daryl Spivey
|
|
|
See red line notes and install per ISPC.
|
Routing PW Solid Waste | 2/12/2018 | | 2/15/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Design Review | 2/12/2018 | | 2/13/2018 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 2/12/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/6/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/14/2017 | | 2/6/2018 | | FAIL |
Carl Westfall
|
|
|
This project has not been reviewed yet for nonstructural IBC provisions. It was routed back to the applicant so that revised drawings could be uploaded so the 2nd structural review could be done. The IBC non-structural review will be done as as part of the 2nd review.
|
Routing - PLUMBING | 1/4/2018 | | 1/4/2018 | | PASS |
Bill VanDegrift
|
|
|
sewer attached to grading
|
Routing Off Site - STRUCTURAL | 12/14/2017 | | 1/2/2018 | | FAIL |
Carl Westfall
|
|
|
Jared Bauder (CH2M Hill)
|
Routing - FIRE | 12/14/2017 | 12/14/2017 | 12/22/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing PW Solid Waste | 12/14/2017 | | 12/19/2017 | | FAIL |
Evan Carpenter
|
|
|
There will need to be a staging area near 9th street where the dumpsters can be placed prior to servicing by the City’s contractor. Refer to the solid waste design standards linked below.
Additionally, I will need a signed statement from the building owner, stating that building staff will be responsible for moving containers to the street loading zone for collection and that the City’s solid waste contractor will not enter the building to retrieve or return the containers from the solid waste room.
|
Routing - MECHANICAL | 12/14/2017 | | 12/19/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 12/14/2017 | | 12/18/2017 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Sewer Design | 12/18/2017 | | 12/18/2017 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Geothermal | 12/14/2017 | | 12/15/2017 | | PASS |
Jon R. Gunnerson
|
|
|
No connection to geothermal heating district. If a connection to the system is desired, contact Public Works ###-####
|
Routing PW Drainage | 12/14/2017 | | 12/14/2017 | | PASS |
Brian Murphy
|
|
|
GRADING PLA N ALL READY APPROVED
|
Intake Approval | | | 12/14/2017 | | PASS |
|
|
|
|
Routing - Design Review | 12/14/2017 | | 12/14/2017 | | FAIL |
Andrea Tuning
|
|
|
Requires a Design Review Modification application.
|
Routing - PLUMBING | 12/14/2017 | | 12/14/2017 | | FAIL |
Bill VanDegrift
|
|
|
Provide civil utility plan for review.
|
Routing - PLANNING | 12/14/2017 | | 12/14/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 12/14/2017 | | 12/14/2017 | | PASS |
Doug Chausow
|
|
|
Building address: 880 W River St
|
Routing - PUBLIC WORKS | 12/14/2017 | | 12/14/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 12/14/2017 | | 12/14/2017 | | PASS |
Andy J. Long
|
|
|
VOID. SWPPP/ESC plan submitted with GRD17-00061. See ESC17-01346 to cover all phases of Afton Phase II.
|
Plan Reviewer's activity | | | 12/2/2017 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 10/4/2017 | | FAIL |
|
|
|
(10-4-17) Please see the circled item in the plan intake checklist (i.e. the one without an OK). Please resolve this item as directed.
|
Intake Approval | | | 9/21/2017 | | FAIL |
|
|
|
(9-21-17) Please see the circled items in the plan intake checklist. Please resolve each item as directed.
|
Application received | | | 9/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 19 2017 9:12AM
|