Permit Information
Permit NumberBLD17-03345
StatusFinaled
Name ANDERSEN CONSTRUCTION COMPANY IDAHO
Site Address 880 W RIVER ST
Project NameThe Afton Phase II - Dwellings
Customer NumberGRD17-00061
ePlanReviewYes
Description
(THE AFTON – FOUR STORIES OF DWELLING UNITS ABOVE THE GARAGE PODIUM OF PHASE II – WEST BUILDING) (DRH17-00213) (8-28-19 PLAN MODIFICATION TO REMOVE FINISHING UNIT 506 FROM THIS PERMIT. UNIT 506 WILL BE FINISHED UNDER A FUTURE SEPARATE PERMIT THAT WILL ALSO ESTABLISH A CERTIFICATE OF OCCUPANCY.) (3-5-19 PLAN MODIFICATION TO FILL CONCEALED COMBUSTIBLE SPACES WITH BLOWN-IN FIBERGLASS INSULATION ON THE 2ND, 3RD, AND 4TH STORIES IN LIEU OF COVERING THE COMBUSTIBLE WALL AND FLOOR MATERIALS WITH GYPSUM BOARD OR INSTALLING FIRE SPRINKLER HEADS WITHIN THE SPACES. THE 1-HR FIRE-RESISTANCE-RATED FLOOR-CEILING OR ROOF-CEILING ASSEMBLY ABOVE THE CONCEALED COMBUSTIBLE SPACE IS STILL REQUIRED. TO CREATE A SINGLE-USER TOILET ROOM ON THE 3RD STORY WITH ACCESS FROM A COMMON AREA. THE TOILET ROOM IS REQUIRED TO BE FULLY ACCESSIBLE TO THE DISABLED AS DEFINED BY COMMERCIAL STANDARDS.) (10-26-18 PLAN MODIFICATION TO ENLARGE THE MASTER BATHROOM AND TO ENLARGE THE GUEST BEDROOM IN UNIT 406. TO REVISE UNIT 512 TO MATCH UNITS 212, 312, AND 412. THE NUMBER AND TYPE OF PLUMBING FIXTURES WILL BE CHANGED. BOTH REVISED UNITS ARE REQUIRED TO COMPLY AS TYPE B DWELLING UNITS.) The fire sprinkler system (NFPA 13 below and above the podium) is used for story, height, and building area increase. The concrete podium was constructed under permit BLD17-03344. Uses are expected to include parking, storage, and perhaps office, retail sales, or assembly on the 1st story; two story residential condominiums on the 2nd story; and 1 story residential condominiums on the 2nd, 3rd, 4th, and 5th stories. To construct a 4 story, 66,878 square foot condominium dwelling unit building (71,400 including areas open to the sky) above a 22,327 square foot concrete podium shell that was constructed under another permit (18,553 square foot 2nd story, 17,875 square foot 3rd story, 15,225 square foot 4th story, and 15,225 square foot 5th story). Structural work is to include wood stud bearing and shear walls; structural sheathing for shear walls and floor diaphragms; shear wall hold downs; engineered wood floor joists, rim joists, beams, and columns; solid sawn wood headers, joists, and columns; engineered wood trusses and girder trusses; steel columns; and roof top screen walls for mechanical. Special Inspection is required for wood diaphragms, wind resistance, seismic resistance, etc. The design of wood trusses is a deferred submittal item. Other work includes 1-hr dwelling unit separation walls; 1-hr dwelling unit separation floors; 2-hr stairway enclosures, 2-hr fire barrier wall to function as a horizontal exit; 1-hr corridors; 2-hr trash chute with a vestibule at each story; insulation; exterior wall finishes; roof coverings; exterior windows; guardrails; awnings; concrete pavers and pedestals over a single ply roof membrane at decks; millwork; and finishes. Penetrations of the 3-hr podium for plumbing pipes, roof drains, hold downs for shear walls, etc. are required to be made without cutting any reinforcement, including post tensioned tendons. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The permit for the entire building shall not be finaled and a Certificate of Occupancy shall not be issued until the condo plat that removes the interior property line is completed. This permit is intended to establish a Certificate of Occupancy for the entire building except for the commercial shell space on the 1st story. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 10/17/20193/9/2020 DONE
This permit finaled on the web by Ami Ostrow
BLD-Final10/4/201910/7/201910/7/2019PPASS
DetailsDave Hannah
Call Jesse please. Thank you! Phone #: ###-#### Inspection requested via web by Ami Ostrow
Permanent Occupancy  10/7/2019 DONE
BLD-Final10/3/201910/4/201910/4/2019PCANC
DetailsDave Hannah
Call Jesse please! Phone #: ###-#### >> Inspection requested via web by Ami Ostrow Inspection cancelled from web by: Ami Ostrow
FIRE-Final Inspection10/3/201910/3/201910/3/2019PPASS
DetailsJim Page
Previously noted items have been corrected, fire sprinkler ispection is complete, fire aalrm inspection is complete, heat trace ispection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete.

Call jesse please Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Conference10/2/201910/2/201910/2/2019PPASS
DetailsDave Hannah
Please call Jesse Phone #: ###-#### Inspection requested via web by Ami Ostrow
FIRE-Final Inspection10/2/201910/2/201910/2/2019PFAIL
DetailsJim Page
Provide signage for doors 105-4 and S1-1 reading Roof Top Access as well as Fire sprinkler Floor Control access as discussed. Provide signage on S2-1 stating no roof top access per building fire code review comments, notes 8 and 15.

Please call Jesse for fire / life / safety. Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Conference9/26/20199/27/20199/27/2019PCANC
DetailsTony Young
Jason Phone #: ###-####
BLD-Conference9/25/20199/26/20199/26/2019PDEFR
DetailsTony Young
Jason Phone #: ###-####,,, wanted to show 425 fixes?
BLD-Final9/23/20199/24/20199/24/2019PPART
DetailsDave Hannah
Jason Phone #: ###-#### ok for tco
FIRE-Final Inspection9/23/20199/24/20199/24/2019APART
DetailsJim Page
Partial final inspwection for life fire safety is complete, item left for life fire safety is signage placed in north stairwell, install signage for fire sprinkler floor control access at discussed doors. Fire sprinkler inspection is complete, fire alarm inspection is complete. 45 day TCO authorized per conversation with Ron Johnson for life fire safety.

Jason Phone #: ###-####
Temporary Occupancy9/24/201911/8/20199/24/2019 DONE
DetailsTiffany Carson-Herker
PubWorks Occupancy Approval9/24/20199/24/20199/24/2019 DONE
DetailsTiffany Lowery
BLD-Final9/19/20199/20/20199/20/2019ACANC
DetailsTell Riley
jason Phone #: ###-####//walked through units prior to TCO//will be calling for finals next week//
FIRE-Conference9/19/20199/19/20199/19/2019APART
DetailsJim Page
Items noticed on conference walkthrough, provide fire alarm notification in trash rooms, every level. Provide notification in level 4 elevator lobby.
FIRE-Final Inspection9/17/20199/19/20199/19/2019ACANC
DetailsJim Page
Request was for a conference on areas completed, this request is cancelled.

Jason Phone #: ###-####
FIRE-Final Inspection9/12/20199/16/20199/17/2019ACANC
DetailsTroy Cobbley
Cancel per Jason Phone #: ###-####
Zoning Approval9/17/20199/17/20199/17/2019 PASS
DetailsKatelyn Menuge
BLD-Framing/Rough-in9/13/20199/16/20199/16/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Final9/12/20199/16/20199/16/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
FIRE-Final Inspection9/10/20199/12/20199/12/2019PCANC
DetailsJim Page
Rescheduled per conversation with point of contact, this request is cancelled.

Jason- inspection for Levels #2 and #3 Phone #: ###-####
BLD-Conference9/11/20199/11/20199/11/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in9/3/20199/3/20199/4/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
Permit Ready to Issue  8/29/2019 DONE
PLAN MOD - fees due, do not reissue
(F) Reprint permit  8/29/2019 DONE
Print Occupancy Form  8/29/2019 DONE
CHANGE STATUS TO (ISS)  8/29/2019 DONE
Plan assigned to (CJW)8/27/20198/27/20198/28/2019 PASS
DetailsCarl Westfall
plan mod
Plan Modification Accepted  8/28/2019 PASS
Did plan intake review and sent to the permits desk
Routing - PLAN CHECK8/28/2019 8/28/2019 PASS
DetailsCarl Westfall
Plan Reviewer's activity  8/28/2019 PASS
The 3rd plan mod was approved
BLD-Framing/Rough-in8/26/20198/27/20198/27/2019APASS
DetailsDave Hannah
jASON Phone #: ###-####
Plan Modification Accepted  8/27/2019 DONE
unit 506 is being removed from this permit as it is lagging in completion due to owner finish upgrades. all of the lift safety items will be installed and signed off prior to the entire building receiving certificate of occupancy
BLD-Framing/Rough-in8/19/20198/19/20198/20/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in8/15/20198/15/20198/15/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-#### iner shaft wall mec shaft ok to cover floors 2-5
BLD-Framing/Rough-in8/9/20198/9/20198/9/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Other8/7/20198/7/20198/8/2019PPASS
DetailsDave Hannah
Jason-sofit Phone #: ###-#### 5th floor
BLD-Framing/Rough-in8/6/20198/6/20198/7/2019PFAIL
DetailsDave Hannah
Jason Phone #: ###-#### needs to add second layer of sheetrock trash shut wall
BLD-Framing/Rough-in8/5/20198/5/20198/6/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in7/25/20197/25/20197/25/2019PPASS
DetailsDave Hannah
Jason-trash shoot rooms Phone #: ###-####
BLD-Framing/Rough-in7/15/20197/15/20197/15/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in7/10/20197/11/20197/11/2019AFAIL
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in7/10/20197/10/20197/10/2019PPEND
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/25/20196/25/20196/25/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/13/20196/13/20196/17/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/6/20196/7/20196/7/2019APART
DetailsDave Hannah
JASON Phone #: ###-#### 4th floor corrador drops ok to cover
BLD-Energy code compliance6/4/20196/5/20196/5/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/3/20196/3/20196/4/2019PPART
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance5/29/20195/30/20195/30/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/15/20195/15/20195/21/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/20/20195/20/20195/21/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/16/20195/16/20195/16/2019APASS
DetailsDave Hannah
Jason Phone #: ###-#### 3rd floor corr ok to cover
BLD-Framing/Rough-in5/14/20195/15/20195/15/2019APART
DetailsDave Hannah
Jason Phone #: ###-#### 3rd fl corr drops ok and stair tower to roof ok to cover4
BLD-Framing/Rough-in5/10/20195/10/20195/10/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/7/20195/8/20195/8/2019PCANC
DetailsDave Hannah
jason Phone #: ###-####
BLD-Energy code compliance4/29/20194/30/20194/30/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/24/20194/24/20194/24/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/17/20194/18/20194/18/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/15/20194/15/20194/16/2019PPART
DetailsDave Hannah
Jason Phone #: ###-#### drop ceilings 4th floor first 5 units ok
BLD-Energy code compliance4/12/20194/12/20194/12/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/10/20194/11/20194/11/2019APART
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/5/20194/8/20194/8/2019APART
DetailsDave Hannah
Jason Phone #: ###-#### third floor drop ceilings ok
BLD-Framing/Rough-in4/2/20194/3/20194/4/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/1/20194/1/20194/2/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/26/20193/26/20193/27/2019PDONE
DetailsDave Hannah
5th level // Jesse Phone #: ###-####
BLD-Energy code compliance3/22/20193/25/20193/25/2019ADONE
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/20/20193/21/20193/21/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in3/19/20193/20/20193/20/2019APASS
DetailsDave Hannah
Jason Phone #: ###-#### drop ceilings rms 211-215
BLD-Framing/Rough-in3/19/20193/19/20193/20/2019PPART
DetailsDave Hannah
jason Phone #: ###-####5th foor ok to rock first 8ft of walls first 4 rooms
BLD-Energy code compliance3/19/20193/19/20193/19/2019PPART
DetailsDave Hannah
jason Phone #: ###-####
BLD-Framing/Rough-in3/15/20193/15/20193/19/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in3/15/20193/18/20193/19/2019ACANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/15/20193/15/20193/18/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/13/20193/14/20193/14/2019APASS
DetailsDave Hannah
Jesse Phone #: ###-####
BLD-Framing/Rough-in3/7/20193/7/20193/14/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in3/8/20193/8/20193/11/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
CHANGE STATUS TO (ISS)  3/7/2019 DONE
Print Occupancy Form  3/7/2019 DONE
Permit Ready to Issue  3/6/2019 DONE
PLAN MOD
BLD-Other3/5/20193/5/20193/5/2019PPART
DetailsDave Hannah
Jason-fire caulking-plan mod doesn''t have anything to do with this inspection (per Jason) Phone #: ###-#### rim in ceiling of two hr wall sw side 3rd flr
Routing - FIRE2/21/20192/21/20193/5/2019 PASS
DetailsErika Akin
Attached revised comments to case
Plan assigned to (CJW)2/20/20192/20/20193/5/2019 PASS
DetailsCarl Westfall
plan mod for Afton II (routed to staff)
Plan Reviewer's activity  3/5/2019 DONE
Plan mod approved
BLD-Other3/1/20193/4/20193/4/2019APART
DetailsDave Hannah
fire proofing // Jason Phone #: ###-####
BLD-Energy code compliance2/26/20192/27/20192/27/2019APART
DetailsBrandon Shaw
Per walk through, seal all vertical penetrations, 4th floor units...
BLD-Energy code compliance2/25/20192/25/20192/25/2019PPASS
DetailsMike Jordan
Jason-per Jason-doesn''t have anything to do with the plan mod that''s in for review Phone #: ###-####. 3rd floor insulation ok. 2nd floor, 2hr. wall ok per alternate detail at rim board.
Routing PW Sewer Rating2/21/2019 2/22/2019 PASS
DetailsAngela Hardy
New single-user toilet room on 3rd story
Routing - PLAN CHECK2/20/2019 2/21/2019 PASS
DetailsCarl Westfall
2nd plan mod approved
Plan Modification Accepted  2/20/2019 DONE
Instead of installing gypsum board in concelaed spaces within the units it is preferred to install non-combustible insulation, specifcations have been proved for insulation to be installed.
BLD-Energy code compliance2/13/20192/14/20192/15/2019PPART
DetailsDave Hannah
Jason Phone #: ###-#### second floor ok ok to start insulating thrird fl
BLD-Framing/Rough-in2/8/20192/11/20192/12/2019APART
DetailsDave Hannah
2nd floor - Jason Phone #: ###-####
BLD-Framing/Rough-in2/4/20192/5/20192/5/2019APEND
DetailsDave Hannah
Jason Phone #: ###-#### needs to see how they are going to protect corrador wall that shower side
BLD-Energy code compliance1/31/20192/1/20192/1/2019APART
DetailsBrandon Shaw
5 rooms on 2nd floor
BLD-Framing/Rough-in1/28/20191/29/20191/29/2019APART
DetailsDave Hannah
Jason Phone #: ###-#### ok to insulate 5 rooms on 2nd floor
BLD-Framing/Rough-in1/23/20191/23/20191/23/2019PPASS
DetailsMike Jordan
Jason Phone #: ###-####. Hold downs, 2nd. floor.
BLD-Framing/Rough-in1/14/20191/15/20191/15/2019APART
DetailsDave Hannah
Jason Phone #: 2###-#### dects ok
BLD-Energy code compliance1/2/20191/3/20191/3/2019APASS
DetailsDave Hannah
Jason Phone #: ###-#### corradors ceilings ok
BLD-Framing/Rough-in12/21/201812/21/201812/21/2018PPART
DetailsDave Hannah
jason Phone #: ###-#### ok to rock lids and top2ft of corradors
BLD-Framing/Rough-in12/13/201812/14/201812/14/2018APART
DetailsDave Hannah
Jason Phone #: ###-#### engineering on trusses for extra insulation dead load is ok 1.8 lbs at highist point ok to rock
BLD-Energy code compliance12/10/201812/11/201812/11/2018APART
DetailsBrandon Shaw
Townhomes - 201, 202, & 203
BLD-Energy code compliance12/4/201812/5/201812/5/2018ANR
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance11/28/201811/28/201811/28/2018PPART
DetailsDave Hannah
Jason Phone #: ###-#### air seal ok on
BLD-Framing/Rough-in11/26/201811/27/201811/27/2018APEND
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance11/21/201811/23/201811/23/2018PCANC
DetailsBrandon Shaw
Jason Phone #: ###-####
BLD-Framing/Rough-in11/21/201811/21/201811/21/2018PNR
DetailsMike Jordan
Jason Phone #: ###-####
BLD-Conference11/13/201811/14/201811/14/2018ADONE
DetailsDave Hannah
Jason Phone #: ###-####
Permit Ready to Issue  10/29/2018 DONE
PLAN MOD DO NOT REISSUE
CHANGE STATUS TO (ISS)  10/29/2018 DONE
PLAN MOD
Plan assigned to (CJW)10/24/201810/24/201810/26/2018 PASS
DetailsCarl Westfall
Plan Mod - The Afton - routed
Plan Reviewer's activity  10/26/2018 PASS
Plan mod review approved
Plan Reviewer's activity  10/25/2018 DONE
Plan intake review approved
Routing - PLAN CHECK10/25/2018 10/25/2018 PASS
DetailsCarl Westfall
Routing PW Sewer Rating10/25/2018 10/25/2018 PASS
DetailsMorgan Webb
SAME NUMBER OF APARTMENTS.
Plan Modification Accepted  10/24/2018 DONE
PLAN MOD - Unit 406 was revised to have the master bathroom larger, unit 512 was revised to match the other 212, 312, and 412 units
BLD-Framing/Rough-in9/13/20189/13/20189/13/2018PPEND
DetailsDave Hannah
Jason Phone #: ###-####
Print permit w/o conditions  4/18/2018  
Issue PAID IN FULL permit  4/9/2018 DONE
Print Occupancy Form  4/9/2018 DONE
Telephone call  3/20/2018 DONE
Left a message for Tyler informing him that this permit is showing as 2 days past date. recommended that he send in a request for a 180 day extension
Plan assigned to (CJW)12/14/201712/14/20173/6/2018 PASS
DetailsCarl Westfall
(2nd done) (Jan 17 - 25 days) (211 sheets) Afton Phase 2
PLANS/APPL TAKEN TO FRONT DESK  3/6/2018 DONE
Permit Ready to Issue  3/6/2018 DONE
DetailsChristina Prado
NEED
ACHD
GC FORM - met
REVISE CERT - met
Routing - PLAN CHECK3/2/2018 3/5/2018 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL3/5/2018 3/5/2018 PASS
DetailsCarl Westfall
Jared Bauder (CH2M Hill)
Route to Impact Fee Review2/28/20183/3/20183/2/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals received  3/2/2018 DONE
1st review completed  2/28/2018 DONE
Plan resubmittals requested  2/28/2018 DONE
Routing - PLAN CHECK2/12/2018 2/22/2018 FAIL
DetailsCarl Westfall
Emailed the plan review report
Routing Off Site - STRUCTURAL2/12/2018 2/18/2018 FAIL
DetailsCarl Westfall
Jared Bauder (CH2M Hill)
Routing - PLUMBING2/12/2018 2/15/2018 PASS
DetailsDaryl Spivey
See red line notes and install per ISPC.
Routing PW Solid Waste2/12/2018 2/15/2018 PASS
DetailsEvan Carpenter
Routing - Design Review2/12/2018 2/13/2018 PASS
DetailsAndrea Tuning
Plan resubmittals received  2/12/2018 DONE
Plan resubmittals requested  2/6/2018 DONE
Routing - PLAN CHECK12/14/2017 2/6/2018 FAIL
DetailsCarl Westfall
This project has not been reviewed yet for nonstructural IBC provisions. It was routed back to the applicant so that revised drawings could be uploaded so the 2nd structural review could be done. The IBC non-structural review will be done as as part of the 2nd review.
Routing - PLUMBING1/4/2018 1/4/2018 PASS
DetailsBill VanDegrift
sewer attached to grading
Routing Off Site - STRUCTURAL12/14/2017 1/2/2018 FAIL
DetailsCarl Westfall
Jared Bauder (CH2M Hill)
Routing - FIRE12/14/201712/14/201712/22/2017 PASS
DetailsScott Arellano
Attached comments to case
Routing PW Solid Waste12/14/2017 12/19/2017 FAIL
DetailsEvan Carpenter
There will need to be a staging area near 9th street where the dumpsters can be placed prior to servicing by the City’s contractor. Refer to the solid waste design standards linked below.

Additionally, I will need a signed statement from the building owner, stating that building staff will be responsible for moving containers to the street loading zone for collection and that the City’s solid waste contractor will not enter the building to retrieve or return the containers from the solid waste room.
Routing - MECHANICAL12/14/2017 12/19/2017 PASS
DetailsTroy James
Routing PW Sewer Design12/14/2017 12/18/2017 PASS
DetailsMike Sheppard
Routing PW Sewer Design12/18/2017 12/18/2017 PASS
DetailsMike Sheppard
Routing PW Geothermal12/14/2017 12/15/2017 PASS
DetailsJon R. Gunnerson
No connection to geothermal heating district. If a connection to the system is desired, contact Public Works ###-####
Routing PW Drainage12/14/2017 12/14/2017 PASS
DetailsBrian Murphy
GRADING PLA N ALL READY APPROVED
Intake Approval  12/14/2017 PASS
Routing - Design Review12/14/2017 12/14/2017 FAIL
DetailsAndrea Tuning
Requires a Design Review Modification application.
Routing - PLUMBING12/14/2017 12/14/2017 FAIL
DetailsBill VanDegrift
Provide civil utility plan for review.
Routing - PLANNING12/14/2017 12/14/2017 PASS
DetailsSusan Riggs
Routing - Addressing12/14/2017 12/14/2017 PASS
DetailsDoug Chausow
Building address: 880 W River St
Routing - PUBLIC WORKS12/14/2017 12/14/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment12/14/2017 12/14/2017 PASS
DetailsAndy J. Long
VOID. SWPPP/ESC plan submitted with GRD17-00061. See ESC17-01346 to cover all phases of Afton Phase II.
Plan Reviewer's activity  12/2/2017 PASS
Plan intake review approved
Intake Approval  10/4/2017 FAIL
(10-4-17) Please see the circled item in the plan intake checklist (i.e. the one without an OK). Please resolve this item as directed.
Intake Approval  9/21/2017 FAIL
(9-21-17) Please see the circled items in the plan intake checklist. Please resolve each item as directed.
Application received  9/19/2017 DONE
Application submitted via PDS Online on Sep 19 2017 9:12AM