Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD17-04465
StatusFinaled
Name VISSER BUILDING CO
Site Address 503 S ASH ST
Project NameAsh Street Townhomes West Bldg
Customer NumberBLD17-04464 & BLD18-00248
ePlanReview 
Description
(ASH STREET TOWNHOMES - WEST BUILDING) There are three building permits under this Eplan (BLD17-04464, BLD17-04465 and BLD18-00248). // 06/21/19 PLAN MOD TO REVISE WINDOW SCHEDULE TO PROVIDE ONLY CODE REQUIRED EEROS. JAR // Permit to build the West Building, a 19,230 sq ft multi-family R2 apartment building. This project consists of two 3-story, multi-family residential buildings and one single-story detached carport, and related site work. The two multi-family buildings are of Type VB construction and fully sprinklered with an NFPA 13 system for building area increase. Separate fire sprinkler and fire alarm permits are required as regulated by Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  4/14/2020 DONE
DetailsJason Blais
Received LEED Certification documentation - LEED Gold for Homes.
BLD-Aging Inspection7/18/20197/18/20197/26/2019 DONE
DetailsDave Hannah
BLD-Final7/17/20197/18/20197/18/2019PPASS
DetailsDave Hannah
Wes Phone #: ###-####
BLD-Final7/16/20197/18/20197/18/2019PPASS
DetailsDave Hannah
Wes Phone #: ###-####
Permanent Occupancy  7/18/2019 DONE
BLD-Aging Inspection7/17/20197/17/20197/17/2019 PEND
DetailsDave Hannah
CHANGE STATUS TO (ISS)  7/16/2019 DONE
Zoning Approval7/3/20197/3/20197/3/2019 PASS
DetailsJosh Wilson
OVERRIDE  6/24/2019  
Permit Ready to Issue  6/24/2019 DONE
PLAN MOD
Plan assigned to (JAR)6/6/20196/6/20196/21/2019 DONE
DetailsJulie Romig
06/17 - Plan Mod Ash St Townhomes EERO Windows
Routing - PLAN CHECK6/11/2019 6/21/2019 PASS
DetailsJulie Romig
Plan Mod 2 - Windows
Routing - Design Review6/21/2019 6/21/2019 PASS
DetailsJosh Wilson
Plan Mod 2 - Windows
PubWorks Occupancy Approval6/7/20196/7/20196/7/2019 DONE
DetailsTiffany Lowery
Plan Modification Accepted  6/6/2019 DONE
Page 3 of plan mod app has list of changes
Temporary Occupancy6/3/20199/1/20196/3/2019 DONE
DetailsBrittany Hill
CHANGE STATUS TO (ISS)  5/31/2019 DONE
Revoke temp. for questions see angie or jason blais
BLD-Final5/29/20195/30/20195/30/2019APART
DetailsDave Hannah
Call Wes Phone ####-#### ok for tco
FIRE-Final Inspection5/20/20195/21/20195/21/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire exitnguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete.

Wes Phone #: ###-####
BLD-Final5/20/20195/20/20195/21/2019PCANC
DetailsDave Hannah
Wes Phone #: ###-####
Zoning Approval5/21/20195/21/20195/21/2019 PASS
DetailsJosh Wilson
ok for temp CO. Need adjustments to mechanical screening prior to final occupancy.
Print Occupancy Form  5/7/2019 DONE
Print Occupancy Form  2/5/2019 DONE
BLD-Wall cover1/14/20191/14/20191/15/2019PPASS
DetailsDave Hannah
Wall Cover Inspection in Units #123, 223, 323 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing1/14/20191/14/20191/15/2019PPASS
DetailsDave Hannah
Interior Shear Inspection on Units #123, #223, #323 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance1/14/20191/14/20191/14/2019PCANC
DetailsDave Hannah
Insulation Inspection in Units #123, #223, #323 Phone #: ###-#### >> Inspection requested via web by Hunter Gomez Inspection cancelled from web by: Hunter Gomez
BLD-Energy code compliance12/31/201812/31/20181/2/2019PPASS
DetailsDave Hannah
Insulation inspection in Units #121, 123, 223, 333 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/31/201812/31/20181/2/2019PPASS
DetailsDave Hannah
Wall Cover inspection of unit #121 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in12/26/201812/27/201812/27/2018APASS
DetailsDave Hannah
Framing/Rough in Inspection in Units #121, #123, #223, ; #333. Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Other12/20/201812/21/201812/21/2018APEND
DetailsDave Hannah
Special inspection of Fire resistant paint in areas behind exterior metal staircase assembly Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/20/201812/20/201812/20/2018APASS
DetailsDave Hannah
Final Wall cover inspection in Units #101 ; #201 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in12/20/201812/20/201812/20/2018APASS
DetailsDave Hannah
Units #101 ; #201 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance12/20/201812/20/201812/20/2018APASS
DetailsDave Hannah
Units #101 ; #201 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
Permission to cover inspection on Units # 115, #117, ; #119
BLD-Energy code compliance12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
Interior Insulation inspection on Units # 115, #117, ; #119
BLD-Wall Bracing12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
Interior Shear inspection on Units # 115, #117, ; #119
BLD-Energy code compliance12/7/201812/7/201812/7/2018PPASS
DetailsDave Hannah
Insulation inspection on units #111 ; #113 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/7/201812/7/201812/7/2018PPASS
DetailsDave Hannah
Final Wall Cover inspection on units #111 ; #113 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing12/7/201812/7/201812/7/2018PPASS
DetailsDave Hannah
Interior sheer inspection on units #111 ; #113 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in11/30/201812/3/201812/3/2018APASS
DetailsDave Hannah
Secondary roof truss framing inspection after initial walk through at time of first inspection, and verbal confirmation to proceed with spray foam on Friday (11/30), of roof trusses from Gridline 11 to 3. Early Am if possible. Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing11/29/201811/29/201811/29/2018APASS
DetailsDave Hannah
Interior Shear inspection Units #203, 105, 107, 109. Late AM if possible Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover11/29/201811/29/201811/29/2018APASS
DetailsDave Hannah
Wall cover inspection Units #203, 105, 107, 109. Late AM if possible Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance11/29/201811/29/201811/29/2018APASS
DetailsDave Hannah
Shear wall insulation inspection prior to OSB sheer in units #111, 113,115,117,119 Late AM if possible Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover11/27/201811/27/201811/27/2018PCANC
DetailsDave Hannah
Inspection for permission to cover and interior shear inspection on units #105, #107, #109 ; #203 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in11/20/201811/20/201811/20/2018PPASS
DetailsDave Hannah
Framing inspection on Units #101, #201, #111, #113, #115, #117, ; #119 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance11/20/201811/20/201811/20/2018PPASS
DetailsDave Hannah
Insulation inspection in Units #203, #105, #107, #109 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in11/14/201811/15/201811/15/2018APART
DetailsDave Hannah
Framing inspection on West Building Units #105,#107,#109, #203 Phone #: ###-#### Inspection requested via web by Hunter Gomez ok to insulate 4 units
BLD-Wall Bracing11/7/201811/7/201811/7/2018PPASS
DetailsDave Hannah
Final Exterior Shear Inspection, North end of building Phone #: ###-#### Inspection requested via web by Hunter Gomez
Routing - MECHANICAL11/5/2018 11/5/2018 FAIL
DetailsTroy James
BLD-Framing/Rough-in11/2/201811/2/201811/2/2018APART
DetailsDave Hannah
Inspection of the west building 2nd and 3rd floor system throughout Phone #: ###-#### Inspection requested via web by Hunter Gomez floor trusses ok
BLD-Framing/Rough-in10/31/201811/1/201811/1/2018APASS
DetailsDave Hannah
Inspection of roof truss framing from southside moving north to gridline 11 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing10/26/201810/26/201810/26/2018PPASS
DetailsDave Hannah
Roof straps on the northside of west building. Contact Matt of R;L framing to inspect, ###-#### Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing10/24/201810/24/201810/24/2018PPASS
DetailsDave Hannah
Exterior shear inspection on south and east walls Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing10/22/201810/23/201810/23/2018AFAIL
DetailsMike Jordan
Exterior Shear inspection on south and east walls
Phone #: ###-#### Inspection requested via web by Hunter Gomez. east wall, 2nd floor, needs fasteners at 3 inches o.c..
BLD-Wall Bracing10/12/201810/12/201810/12/2018PPART
DetailsBrandon Shaw
West side of building exterior shear
BLD-Wall Bracing9/28/20189/28/20189/28/2018APART
DetailsDave Hannah
Partial interior shear inspection; areas behind bathtubs

Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Hunter Gomez ok to cover
BLD-Wall Bracing9/14/20189/14/20189/14/2018APART
DetailsDave Hannah
Exterior Shear inspection of 2nd ; 3rd floor walls soon to be concealed behind masonry pilasters between gridlines 10 and 6 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing8/17/20188/20/20188/20/2018APART
DetailsDave Hannah
Exterior Shear inspection on 1/2 of 3rd floor exterior walls prior to CMU pilasters being constructed. Will also be inspected by MTI. Early AM if possible/necessary Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing8/6/20188/6/20188/6/2018PPART
DetailsDave Hannah
Exterior Shear inspection for small areas soon to be covered by Masonry PIlasters Phone #: ###-#### Inspection requested via web by Hunter Gomez sw3 walls behind cmu columns ok
BLD-Conference7/10/20187/11/20187/11/2018ADONE
DetailsDave Hannah
Conference on framing inquires and fire barrier situations now that framing has begun in earnest. Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Foundation6/12/20186/12/20186/12/2018PPASS
DetailsDave Hannah
Slab prep and thickened footing rebar Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance6/1/20186/1/20186/1/2018PPASS
DetailsDave Hannah
Foundation Insulation Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Foundation5/29/20185/30/20185/30/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing5/22/20185/22/20185/23/2018PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ben Sears west side mti will also be on site to do spec inspection
BLD-Conference5/22/20185/22/20185/23/2018PDONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Hunter Gomez
Issue PAID IN FULL permit  5/4/2018 DONE
Print Occupancy Form  5/4/2018 DONE
Plan assigned to (JAR)1/23/20181/23/20185/3/2018 DONE
DetailsJulie Romig
*1st Rev Comp - 5th Rev - 502 Ash street townhouses West
Routing - PLAN CHECK5/3/2018 5/3/2018 PASS
DetailsJulie Romig
Routing - Design Review5/3/2018 5/3/2018 PASS
DetailsSarah Schafer
Approved per DRH17-00176
Routing PW Drainage5/3/2018 5/3/2018 PASS
DetailsJason C. Taylor
PLANS/APPL TAKEN TO FRONT DESK  5/3/2018 DONE
Permit Ready to Issue  5/3/2018 DONE
All met
Routing - PLAN CHECK4/9/2018 4/13/2018 FAIL
DetailsJulie Romig
4th Review
Routing - Addressing4/9/2018 4/11/2018 PASS
DetailsDoug Chausow
Corrected address: 503 S Ash St
Routing - PUBLIC WORKS4/9/2018 4/10/2018 PASS
DetailsRachael Beierle
Routing PW Solid Waste4/10/2018 4/10/2018 PASS
DetailsEvan Carpenter
Routing - PLANNING3/22/2018 4/9/2018 PASS
DetailsLeon Letson
Routing - Design Review4/9/2018 4/9/2018 FAIL
DetailsSarah Schafer
Awaiting Easements and Agreements
Routing - PLAN CHECK3/22/2018 3/28/2018 FAIL
DetailsJulie Romig
3rd Review - Plan Review report emailed to architect.
Routing - Addressing3/22/2018 3/22/2018 FAIL
DetailsDoug Chausow
Parcels need to be consolidated
Routing - PUBLIC WORKS3/22/2018 3/22/2018 FAIL
DetailsRachael Beierle
Routing PW Sewer Design3/12/2018 3/22/2018 PASS
DetailsMike Sheppard
Routing - Erosion and Sediment1/23/2018 3/22/2018 PASS
DetailsAndy J. Long
SWPPP with narrative and site map approved, RP not yet designated. Site preparation inspection required.
Routing PW Drainage3/12/2018 3/16/2018 FAIL
DetailsJason C. Taylor
See changemarks on plans. JCT
Routing - PLAN CHECK3/12/2018 3/15/2018 FAIL
DetailsJulie Romig
Plan review report emailed to architect.
Routing - PLANNING3/12/2018 3/14/2018 FAIL
DetailsLeon Letson
Complete Parcel Consolidation
Routing - PLUMBING3/12/2018 3/13/2018 PASS
DetailsBill VanDegrift
these plans are approved as apartments. not townhomes.
Routing PW Geothermal1/24/2018 3/13/2018 PASS
DetailsJon R. Gunnerson
No connection to geothermal heating district. If wanting to connect to geothermal system, contact Public Works Dept.
Routing PW Solid Waste1/24/2018 3/12/2018 PASS
DetailsEvan Carpenter
Routing - Addressing3/12/2018 3/12/2018 FAIL
DetailsDoug Chausow
Parcels still need to be consolidated, prior to approval.
Routing Off Site - STRUCTURAL3/12/2018 3/12/2018 PASS
DetailsJulie Romig
Routing - PUBLIC WORKS3/12/2018 3/12/2018 FAIL
DetailsRachael Beierle
MUST CONSOLIDATE PARCELS IN ORDER TO RATE AND ATTACH PERMITS.
Routing PW Street Lights3/12/2018 3/12/2018 PASS
DetailsTom Marshall
Routing - PLANNING1/23/2018 3/11/2018 FAIL
DetailsLeon Letson
Failed per ePlanReview
Route to Impact Fee Review2/27/20183/2/20183/1/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK1/23/2018 2/27/2018 FAIL
DetailsJulie Romig
1st review completed  2/27/2018 FAIL
DetailsJulie Romig
Routing - Design Review1/23/2018 2/12/2018 FAIL
DetailsSarah Schafer
Failed per BLD17-04464 and ePlanReview
Routing PW Drainage1/24/2018 2/5/2018 FAIL
DetailsBrian Murphy
Failed per BLD17-04464 and ePlanReview
Routing Off Site - STRUCTURAL1/23/2018 1/31/2018 FAIL
DetailsJulie Romig
Routing - FIRE1/23/20181/23/20181/30/2018 PASS
DetailsScott Arellano
Attached comments to case
Routing PW Sewer Design1/24/2018 1/26/2018 FAIL
DetailsMike Sheppard
Failed per BLD17-04464 and ePlanReview
Routing - Addressing1/23/2018 1/26/2018 FAIL
DetailsDoug Chausow
5 parcels need to be consolidated.
Routing PW Street Lights1/24/2018 1/25/2018 FAIL
DetailsTom Marshall
Failed per BLD17-04464 and ePlanReview
Routing - PUBLIC WORKS1/23/2018 1/24/2018 FAIL
DetailsRachael Beierle
FAILED DUE TO ADDRESSING AND LOTS NEED TO BE CONSOLIDATED PRIOR TO RATING.
Routing - MECHANICAL1/23/2018 1/24/2018 FAIL
DetailsTroy James
Routing - PLUMBING1/23/2018 1/24/2018 FAIL
DetailsBill VanDegrift
1) provide a typical plumbing plan (Drain, waste and vent and water) for each unit type. include sizing.
Intake Approval  1/23/2018 PASS
Application received  12/7/2017 DONE
Application submitted via PDS Online on Dec 7 2017 3:19PM
First Notice 7/28/2019   
Routing - Design Review3/12/2018   FAIL
DetailsSarah Schafer
Routing - Design Review3/22/2018   FAIL
DetailsSarah Schafer
Routing PW Drainage3/22/2018   FAIL
DetailsJason C. Taylor
Routing PW Drainage4/9/2018   FAIL
DetailsJason C. Taylor
Routing PW Drainage11/2/2018    
DetailsJason C. Taylor