First Notice | | 6/16/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
BLD-Final | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Dave Hannah
|
|
|
after 10 // Larren Phone #: ###-####
|
Permanent Occupancy | | | 6/6/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected. Sprinkler work is complete, access control interface with fire alarm system complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.
Larren Phone #: ###-####
|
FIRE-Final Inspection | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | CANC |
Mark Scharfen
|
|
|
Laren Phone #: ###-#### cancel per larren
|
FIRE-Final Inspection | 5/7/2019 | 5/8/2019 | 5/7/2019 | A | CANC |
Troy Cobbley
|
|
|
Larren Phone #: ###-####-as per Larin-cance inspection
|
Fees Due Hold | 4/4/2019 | | 5/7/2019 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Final Inspection | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | FAIL |
Jim Page
|
|
|
Access control for north gym door did not release on general fire alarm.
Lauren Phone #: ###-####
|
FIRE-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | FAIL |
Jim Page
|
|
|
Access control did not release on general alram.
Larren Phone #: ###-####
|
FIRE-Final Inspection | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact. Need FIR permits for fire alarm and fire sprinkler work per notes entered on 12FEB 2019.
Laurin Phone #: ###-####
|
BLD-Final | 2/12/2019 | 2/12/2019 | 2/12/2019 | A | NR |
Dave Hannah
|
|
|
needs fire finals
|
BLD-Conference | 2/11/2019 | 2/11/2019 | 2/12/2019 | P | DONE |
Dave Hannah
|
|
|
Laren Phone #: ###-####
|
FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | FAIL |
Jim Page
|
|
|
Access control door leading to space needs to comply with section 1010.1.9.8 of the 2015 IFC. Fire sprinkler head in space located by office is overspaced, fire sprinkler head needs to be added to be code compliant.
Larren Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/13/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/13/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 5/24/2018 | 5/24/2018 | 6/8/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 5/30 L1 K-Cycling at the Gym TI ePlan**
|
Routing - PLAN CHECK | 6/7/2018 | | 6/8/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/8/2018 | | 6/8/2018 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 6/8/2018 | | DONE |
|
|
|
MET
Need
GC Form
Revised Cert of Value
|
Route to Impact Fee Review | 5/31/2018 | 6/3/2018 | 6/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 5/24/2018 | | 5/31/2018 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 5/31/2018 | | FAIL |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/24/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 5/24/2018 | | 5/24/2018 | | PASS |
Doug Chausow
|
|
|
Please verify suite # as this floor plan matches ePlan BLD14-01191 Suite#207
Verified with contact that 210 is correct suite number.
|
Routing - PUBLIC WORKS | 5/24/2018 | | 5/24/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 5/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 8 2018 3:26PM
|