PubWorks Occupancy Approval | 12/21/2018 | 12/21/2018 | 12/21/2018 | | DONE |
Tiffany Lowery
|
|
|
|
First Notice | 12/10/2018 | 12/10/2018 | 12/13/2018 | | DONE |
Brandon Shaw
|
|
|
mailed 12-14
|
BLD-Final | 12/7/2018 | 12/10/2018 | 12/10/2018 | A | PASS |
Brandon Shaw
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | A | PART |
Jim Page
|
|
|
TCO authorized by Jim Storey on 07DEC2018, hydrant install will be verified with Paint Booth permit.
|
FIRE-Final Inspection | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | CANC |
Jim Page
|
|
|
Chris Phone #: ###-####
|
BLD-Final | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PART |
Jim Storey
|
|
|
Chris Phone #: ###-#### tco ok pending fire hyd instal on other permited job at paint booth.
|
FIRE-Final Inspection | 11/30/2018 | 12/3/2018 | 12/3/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide new fire hydrant as referenced under the review notes and BLD18-01396, provide a fire extinguisher, min. 4A with current inspection tag as discussed, remove the thumbturn deadbolt. Keyed is ok with indicator and sticker. Lever hardware can be provided as long as it is single action ADA type. Building not to be used until approved.
Chris Phone #: ###-####
|
BLD-Final | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | FAIL |
Jim Storey
|
|
|
Chris Phone #: ###-#### need sign off pw/fire achd// lever door handle required
|
BLD-Framing/Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PART |
Brandon Shaw
|
|
|
Pending replacment of warped/broken 2x's... Pending other trades rough in... OK to cover exterior
|
BLD-Footing | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### si exsempt
|
Issue PAID IN FULL permit | | | 10/3/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/3/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/28/2018 | | |
|
|
|
|
OVERRIDE | | | 9/28/2018 | | |
|
|
|
|
Print Occupancy Form | | | 9/28/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2018 | | DONE |
|
|
|
Spoke with Chris to inform him the permit is ready. That we need the 302, 306 and a letter from ACHD
|
Plan assigned to (M_H) | 8/21/2018 | | 9/28/2018 | | DONE |
Michael Hanson
|
|
|
09/20 #502 L3 Paper. 1st review completed - structural corrections required refer to email. MDH Forwarded structural engineer response to off site structural (AHJ) 09/18/2018. MDH
|
Routing - PLAN CHECK | 8/23/2018 | | 9/28/2018 | | PASS |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 9/28/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2018 | | DONE |
Michael Hanson
|
|
|
|
Override - Condition Holds | | | 9/28/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/28/2018 | | DONE |
|
|
|
Need ACHD - met (receipt attached)
Value and GC Met
*******NEED REVISED CERT OF VALUE FOR COMPLETE VALUE INCLUDING PROFIT & OVERHEAD. IF NO CHANGE FROM INITIAL VALUE NEED COPY OF CONTRACT BID. PLEASE SEE ADELE OR TISHA FOR QUESTIONS********
AS WELL AS GC FORM
|
Routing - FIRE | 9/6/2018 | 9/6/2018 | 9/27/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case and plans
|
Routing Off Site - STRUCTURAL | 9/17/2018 | | 9/26/2018 | | PASS |
Michael Hanson
|
|
|
Response from engineer sent to off site - structural (AHJ) 09/18/2018. MDH
|
Route to Impact Fee Review | 9/17/2018 | 9/20/2018 | 9/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/17/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 8/23/2018 | | 9/6/2018 | | FAIL |
Michael Hanson
|
|
|
See email from AHJ engineering. MDH
|
Routing - Design Review | 9/6/2018 | | 9/6/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLANNING | 9/6/2018 | | 9/6/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Telephone call | | | 8/23/2018 | | DONE |
|
|
|
called courier for pick up for outside engineering review
|
Routing - PUBLIC WORKS | 8/21/2018 | | 8/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/23/2018 | | 8/23/2018 | | PASS |
Andy J. Long
|
|
|
Project has an approved ESC plan. Certified RP designated. Site preparation inspection is required upon commencement of construction.
|
Routing PW Environmental | 8/22/2018 | | 8/23/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Drainage | 8/22/2018 | | 8/22/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 8/21/2018 | | 8/21/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/21/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/21/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/21/2018 | | PASS |
Michael Hanson
|
|
|
|
Application received | | 8/17/2018 | | | |
|
|
|
|