Permit Information
Permit NumberBLD19-00726
StatusFinaled
Name CM COMPANY
Site Address 8506 W OVERLAND RD
Project NameBluebird Car Wash
Customer NumberGRD19-00028
ePlanReviewYes
Description
(BLUEBIRD CAR WASH) //11-12-2019 PLAN MODIFICATION #3 TO REVISE THE ONE-LINE ELECTRICAL DIAGRAM. Jg// **9-19-2019 Plan modification #2 to revise sewer service from street manhole to property** // 7-29-2019 PLAN MODIFICATION TO ADD POINT OF SALE ISLAND CANOPIES, RELOCATRING MATT WASHERS, REMOVING VEHICLE ACCESS ROAD AND ELECTRICAL WORK MODIFICATIONS. JG// Permit to construct a new 7,936 sq., ft. car wash building and related site improvements. Scope of work includes: construction of concrete footing foundation, slab on grade concrete floor, construction of CMU exterior walls, truss roof construction, TPO roof assembly, interior non-bearing walls to create an equipment room, a break area, an office, a waiting room, an accessible restroom and a car wash tunnel, new electrical, new mechanical, new plumbing, site work, and interior finishes to be in compliance with Ch. 8 of the current IBC. Note: Special Inspections Required, see form 310. Note 2: Grading permit plans (GRD19-0028) for reference in small documents. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/14/20208/11/2020 DONE
mailed 8-14-2020 with first follow up
First Follow up  8/11/2020 DONE
Third Notice 5/12/20207/9/2020 DONE
mailed 7-9-2020
Third Notice 4/8/20205/7/2020 DONE
mailed 5-8-2020
Second Notice 3/15/20204/3/2020 DONE
mailed 4-6-2020
First Notice 2/10/20203/5/2020 DONE
mailed 3-6-20
BLD-Final1/30/20201/31/20201/31/2020APASS
DetailsMike Jordan
Tom Phone #: ###-####. All issues resolved. Ok for perm occ.
Permanent Occupancy  1/31/2020 DONE
Zoning Approval1/29/20201/29/20201/29/2020 PASS
DetailsKatelyn Menuge
BLD-Final1/23/20201/23/20201/23/2020PPART
DetailsMike Jordan
Tom Phone #: ###-####. Ok for temp occ.
Temporary Occupancy1/23/20204/22/20201/23/2020 DONE
DetailsGemma Flores
PubWorks Occupancy Approval1/23/20201/23/20201/23/2020 DONE
DetailsTiffany Lowery
Print Occupancy Form  1/23/2020 DONE
BLD-Final1/21/20201/22/20201/22/2020PPEND
DetailsMike Jordan
Tom Phone #: ###-####. Needs to provide panic hardware on egress doors from mech/elec room. Outstanding plumbing permit as well.
FIRE-Final Inspection1/21/20201/22/20201/22/2020APASS
DetailsTroy Cobbley
Life safety passed. Building inspector is going to follow up on door hardware.

Tom Phone #: ###-####
BLD-Conference1/21/20201/22/20201/22/2020ADONE
DetailsMike Jordan
Tom Phone #: ###-####. Noted issues with approved city plans on site, they do not appear to be the most current set with addtional redlines on sheets A1.0 and A6.0. Noted door hardware issues from mech room area for egress. Egress doors to have panic hardware. Doors from the mech. room to the wash tunnel need to have the sticker placed stating these doors to remain unlocked while building is occupied.
Zoning Approval Temp1/15/20201/15/20201/15/2020 PASS
DetailsKatelyn Menuge
Temporary Approval - BND20-00016
BLD-Ceiling Grid Inspection12/23/201912/23/201912/23/2019PPASS
DetailsMike Jordan
TOM Phone #: ###-####
Plan assigned to (JG)11/4/201911/4/201911/12/2019 PASS
DetailsJavier Guzman
Plan Mod Bluebird Car Wash ePlan
Routing - PLAN CHECK11/12/2019 11/12/2019 PASS
DetailsJavier Guzman
Permit Ready to Issue  11/12/2019 DONE
PLAN MOD Do not reissue
CHANGE STATUS TO (ISS)  11/12/2019 DONE
Plan Modification Accepted  11/4/2019 DONE
revise one line diagra for electrical equipment
BLD-Framing/Rough-in10/23/201910/23/201910/23/2019PPASS
DetailsJim Storey
Tom Phone #: ###-#### ok to cover exteroior wall framing.
BLD-Wall Bracing10/21/201910/21/201910/21/2019PPART
DetailsDave Hannah
Tom Phone #: ###-#### furred out ext wall south side east end ok to cover restroom and office ok to cover dog houses bocking and rat runs in ok to cover ext
BLD-Other10/16/201910/16/201910/16/2019PPASS
DetailsMike Jordan
TOM- ROOFING NAILING Phone #: ###-####
OVERRIDE  9/24/2019  
CHANGE STATUS TO (ISS)  9/24/2019 DONE
Permit Ready to Issue  9/24/2019 DONE
plan mod
Plan assigned to (JG)9/19/20199/19/20199/23/2019 PASS
DetailsJavier Guzman
9/26 Plan Mod Bluebird Car Wash ePlan
Routing - PUBLIC WORKS9/20/2019 9/23/2019 PASS
DetailsMorgan Webb
Routing PW Sewer Design9/23/2019 9/23/2019 PASS
DetailsDeAnn Brown
Routing - PLAN CHECK9/20/2019 9/20/2019 PASS
DetailsJavier Guzman
Plan Modification Accepted  9/19/2019 DONE
plan mod #2- Revised the sewer service form the manhole in the street to the subject property
FIRE-Conference9/17/20199/17/20199/17/2019PDONE
DetailsTroy Cobbley
We discussed the placement of the building address. Knox key box is not required. Tom Phone #: ###-####
BLD-Other9/16/20199/17/20199/17/2019ADEFR
DetailsMike Jordan
grout pour at 1:30 // Tom Phone #: ###-####
BLD-Other9/13/20199/16/20199/16/2019PDEFR
DetailsMike Jordan
pour is at 2pm // grout insp.// Tom Phone #: ###-####. Special inspector on site.
BLD-Other9/12/20199/13/20199/13/2019ADEFR
DetailsMike Jordan
grout pour at 12- Tom Phone #: ###-####
BLD-Other9/10/20199/10/20199/10/2019PDEFR
DetailsMike Jordan
Tom-grout pour-pour time 2:00 Phone #: ###-####
BLD-Other9/5/20199/6/20199/6/2019PDEFR
DetailsMike Jordan
grout at 2pm // Tom Phone #: ###-####
BLD-Other9/3/20199/4/20199/5/2019PDEFR
DetailsMike Jordan
grout pour at 2 pm // Tom Phone #: ###-####
BLD-Other8/30/20199/3/20199/3/2019APART
DetailsMike Jordan
grout // Tom Phone #: ###-####. Work in progress. Will grout south east portion.
BLD-Other8/29/20198/30/20198/30/2019ADEFR
DetailsMike Jordan
Tom- massonary wall Phone #: ###-####. Ok to grout pending special inspection approval.
BLD-Other8/23/20198/26/20198/26/2019APART
DetailsMike Jordan
masonary - Tom Phone #: ###-####.Work in progress Top of foundation to 4ft. elevation. South wall and north interior wall. Ok to grout walls pending special inspection approval.
BLD-Foundation7/31/20197/31/20197/31/2019PPART
DetailsMike Jordan
Thomas Phone #: ###-####. Conveyor trench walls, work in progress. Will have special inspection.
CHANGE STATUS TO (ISS)  7/31/2019 DONE
plan mod change to ISS
OVERRIDE  7/29/2019  
Plan assigned to (JG)6/27/20196/27/20197/29/2019 PASS
DetailsJavier Guzman
2nd rev comp, Plan Mod Bluebird Car Wash ePlan
Routing - Design Review7/25/2019 7/29/2019 PASS
DetailsKatelyn Menuge
Routing - PLAN CHECK7/25/2019 7/29/2019 PASS
DetailsJavier Guzman
Permit Ready to Issue  7/29/2019 DONE
PLAN MOD
BLD-Foundation7/23/20197/23/20197/23/2019PPASS
DetailsMike Jordan
Tom Phone #: ###-####. South exterior stemwall, conveyor pit floor.
BLD-Foundation7/18/20197/18/20197/18/2019PPASS
DetailsMike Jordan
wall // Tom Phone #: ###-####. Stemwalls on grids a and b.
Routing Off Site - STRUCTURAL7/10/2019 7/16/2019 PASS
DetailsJavier Guzman
signed of in ePlan by AHJ Engineers Chris Holladay
Routing - FIRE7/10/20197/10/20197/15/2019 PASS
DetailsMark Scharfen
07.15.2019-Reviewed plan mod. Uploaded rev_fire 07.15.2019.pdf.
Routing - PLAN CHECK7/10/2019 7/13/2019 FAIL
DetailsJavier Guzman
BLD-Footing7/10/20197/11/20197/11/2019PPASS
DetailsMike Jordan
Tom- Phone #: ###-####. Exterior perimeter footings adn interior footings.
Routing - Design Review7/10/2019 7/11/2019 FAIL
DetailsKatelyn Menuge
Need accessible path to mat washers.
Routing - PUBLIC WORKS7/10/2019 7/10/2019 PASS
DetailsAngela Hardy
Routing PW Drainage7/10/2019 7/10/2019 PASS
DetailsBrian Murphy
Plan Reviewer's activity  7/2/2019 DONE
DetailsJavier Guzman
Prescreen failed 7/2/19 due to the following

Provide and upload the following:
• Revise cover sheet index for new added plan sheets
• Engineering Calculations for the new POS canopy islands that are stamped, signed and dated by an Idaho licensed engineer
Plan Modification Accepted  6/27/2019 DONE
plan mod-there will be added valuations-changes to include canopies at the point of sale islands, upgarding ele serv to meet equip. needs, eleting emergency vehicle access road-sheets being modified are C1.0, C4.0, SP1.0, SP1.1, A7.3, S1.0, E1.0, E2.0, E4.0, E5.0, E6.0 & E7.0-assigned to JG
Issue PAID IN FULL permit  6/13/2019 DONE
(F) Reprint permit  6/13/2019 DONE
Print Occupancy Form  6/13/2019 DONE
OVERRIDE  6/12/2019  
Plan assigned to (JG)3/19/20193/21/20196/12/2019 PASS
DetailsJavier Guzman
2nd rev comp, 04/23 (6wks) - 502 Bluebird Carwash
PLANS/APPL TAKEN TO FRONT DESK  6/12/2019 DONE
Permit Ready to Issue  6/12/2019 DONE
all met-
Need GC
Need Rev Val
Routing - PLAN CHECK6/7/2019 6/12/2019 PASS
DetailsJavier Guzman
Routing - FIRE6/7/20196/7/20196/11/2019 PASS
DetailsMark Scharfen
06.11.2019-Completed fire review. HMIS updated-uploaded rev_fire 06.11.2019.pdf. Passed review.
Routing - PLANNING6/7/2019 6/11/2019 PASS
DetailsNicolette Womack
Routing PW Street Lights6/7/2019 6/7/2019 PASS
DetailsTom Marshall
Routing - Design Review6/7/2019 6/7/2019 PASS
DetailsAndrea Tuning
Routing - FIRE5/20/20195/20/20196/3/2019 FAIL
DetailsMark Scharfen
06.03.2019-completed fire review. uploaded rev_fire 06.03.2019.pdf and emailed architecht.
Routing - PLAN CHECK5/20/2019 5/31/2019 PASS
DetailsJavier Guzman
Routing - Design Review5/20/2019 5/22/2019 PASS
DetailsAndrea Tuning
Routing PW Street Lights5/20/2019 5/21/2019 FAIL
DetailsTom Marshall
Sheet E1.0 missing.
Routing PW Sewer Design5/20/2019 5/20/2019 PASS
DetailsDeAnn Brown
Proof of private sewer easement agreement will be required prior to issuance of sewer tap permit.
Route to Impact Fee Review4/27/20194/30/20194/29/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
1st review completed  4/27/2019 FAIL
DetailsJavier Guzman
Routing - FIRE3/19/20193/21/20194/26/2019 FAIL
DetailsMark Scharfen
IFC review complete. IFC 1st review 04.26.2019.pdf uploaded and emailed to architecht.
Routing - PLAN CHECK3/21/2019 4/24/2019 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL3/21/2019 4/20/2019 PASS
DetailsJavier Guzman
signed of in ePlan by AHJ Engineers Chris Holladay

Routing PW Drainage3/21/2019 4/2/2019 PASS
DetailsBrian Murphy
Routing PW Sewer Design3/21/2019 3/28/2019 FAIL
DetailsDeAnn Brown
See changemarks on sheet C2.0
Routing - MECHANICAL3/21/2019 3/28/2019 PASS
DetailsTroy James
Routing PW Street Lights3/21/2019 3/26/2019 FAIL
DetailsTom Marshall
Need to add street light on the NEC of Bird & Overland.
Routing PW Environmental3/21/2019 3/25/2019 PASS
DetailsTerry Alber
All bulk chemicals shall have secondary containment, or drains in equipment room shall have plugs.
Routing PW Solid Waste3/21/2019 3/21/2019 PASS
DetailsEvan Carpenter
Routing - PLUMBING3/21/2019 3/21/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING3/21/2019 3/21/2019 PASS
DetailsNicolette Womack
Routing - Addressing3/21/2019 3/21/2019 PASS
DetailsDoug Chausow
Updated parcel number
Routing - PUBLIC WORKS3/21/2019 3/21/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment3/21/2019 3/21/2019 PASS
DetailsMichael Zawacki
Valid RP required before issuance of permit.
Site prep inspection mandatory.
Routing - Design Review3/21/2019 3/21/2019 FAIL
DetailsAndrea Tuning
Eliminate the existing property line located in the middle of the parcel or complete a property line adjustment.
Remove vacuum producer and mat washers from the planter islands and install a large Class II tree.
Remove the pole lighting, pole signage and pay stations from within teh required setback near the east property line.
Remove pole light from setback on Bird Street.
Remove vacuum producer and mat washers from the planter islands and install a large Class II tree.
Remove the Columnar Norway Maple trees from the interior planter islands and install large canopy Class II tree.
Remove the Easy Street Maple trees and replace them with a large canopy Class II tree.
Intake Approval  3/19/2019 PASS
DetailsMichael Hanson
Prescreen approved/fees paid 3/19/19.
Application received  3/7/2019 DONE
Application submitted via PDS Online on Mar 7 2019 2:48PM
Third Notice 8/16/2020