Print Statement | | | 4/13/2020 | | DONE |
|
|
|
1st notice
|
Second Notice | | 2/17/2020 | 2/24/2020 | | DONE |
|
|
|
This permit finaled on the web by Travis Knutson
|
First Notice | | 1/25/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
Permanent Occupancy | | | 1/15/2020 | | DONE |
|
|
|
|
BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Dave Hannah
|
|
|
After 8:15 am // Peter Phone #: ###-####
|
FIRE-Final Inspection | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection for area of work complete.
|
Telephone call | | | 12/24/2019 | | DONE |
|
|
|
emailed Peter McQuillan letting him know that he failed his fire life safety inspection because of the same reason he's failed them in September and in November: Mag locks on egress doors need to release during general fire per international fire code. A separate permit is required for any and all fire alarm system modifications. I asked him how he plans to remedy the situation.
|
BLD-Final | 12/20/2019 | 12/23/2019 | 12/23/2019 | P | CANC |
Dave Hannah
|
|
|
Peter Phone #: ###-####
|
FIRE-Final Inspection | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | FAIL |
Jim Page
|
|
|
Mag lock interface with fire alarm system has not been completed, as stated in past inspections on 13SEPT2019 and 21NOV2019, mag locks on egress doors need to release during general fire per international fire code. A seperate permit is required for any and all fire alarm system modifications.
Peter Phone #: ###-####
|
BLD-Final | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | NR |
Dave Hannah
|
|
|
call for access - final inspection for Permanent Occupancy // Peter Phone #: ###-####
|
Telephone call | | | 12/20/2019 | | DONE |
|
|
|
Called Peter McQuillan and left a VM regarding the TCO on this property. Also emailed him a request for update.
|
Telephone call | | | 12/3/2019 | | DONE |
|
|
|
Peter McQuillan from First Interstate Bank emailed a request for extension until December 20. See DOCS
|
Change Expiration Date Only | | | 12/3/2019 | | DONE |
|
|
|
request for extension approved per Jason Blais - see DOCS
|
Telephone call | | | 12/2/2019 | | DONE |
|
|
|
Peter McQuillan called in response to my email letting him know he had to final this permit. He wanted to confirm how to request and extension and I gave him Jim Page's phone number so that he could speak with him to figure out exactly what needs to be done.
|
Telephone call | | | 11/22/2019 | | DONE |
|
|
|
Travis Knutson emailed Brian Gergler at First Interstate Bank letting them know that their TCO has expired and asking if they have hired someone to complete the access controls for the space. see DOCS
|
FIRE-Final Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | FAIL |
Jim Page
|
|
|
Mag lock interface with fire alarm system has not been completed, as stated in past inspection on 13SEPT2019, mag locks on egress doors need to release during general fire per international fire code.
Travis Phone #: ###-####
|
Telephone call | | | 11/21/2019 | | DONE |
|
|
|
Travis called me back on this to update me on the status. Inspection failed. Per the scope of work, the bank need to tie the mag locks in to the access control system. There is a conflict with the bank and the property owner to get this done. Nobody has been contracted to do this work.
|
Telephone call | | | 11/21/2019 | | DONE |
|
|
|
Emailed Travis to let him know that all he needs now to get his CO is to schedule and pass Fire/Life Safety.
|
BLD-Aging Inspection | 11/13/2019 | 11/13/2019 | 11/14/2019 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 9/17/2019 | 12/16/2019 | 9/17/2019 | | DONE |
Candy A. Nichols
|
|
|
|
Zoning Approval | 9/17/2019 | 9/17/2019 | 9/17/2019 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Travis Knutson
|
FIRE-Final Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PART |
Jim Page
|
|
|
Previously noted items have been corrected, partial final inspection for life fire safety complete. Fire sprinkler inspection is complete, scope of work for fire alarm has been completed but mag locks have been installed and will be programmed by the tenant, per IFC chapter 10, access controled doors in the path of egress must release during general fire alarm, fire extinguisher will be placed in discussed location. 45 day TCO authorized by Ron Johnson with Boise Fire contingent upon mag lock release on fire alarm, a permit will be required for fire alarm modifications. Signature has been provided on sign off card for associated trades.
Phone #: ###-#### Inspection requested via web by Travis Knutson
|
BLD-Final | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | CANC |
Dave Hannah
|
|
|
Please call 30min prior to arrival to insure I''m onsite. Phone #: ###-#### Inspection requested via web by Travis Knutson
|
FIRE-Final Inspection | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Jim Page
|
|
|
Plans inside space did not have city approved stamp. Existing exit sign still in place that is not lined up with any door, another exit sign has been added a short disatnce away from existing that is in the correct location, need exisitng exit sign removed. Ceiling tile not in place next to fire sprinkler head. Main entry has access control mag locks, per IFC chapter 10 of IFC, mag locks need to release under general fire alarm when associated with an egress door.
Please call 30min prior to arrival to insure onsite. Phone #: ###-#### Inspection requested via web by Travis Knutson
|
BLD-Ceiling Grid Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Coronado
|
Print Occupancy Form | | | 8/29/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Dave Hannah
|
|
|
Inspection requested via web by Jose Coronado
|
BLD-Framing/Rough-in | 6/6/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by Jose Coronado
|
Issue PAID IN FULL permit | | | 5/24/2019 | | DONE |
|
|
|
emailed travisknutson@perigee-group.com to sign
|
Print Occupancy Form | | | 5/24/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 3/21/2019 | 3/21/2019 | 4/25/2019 | | PASS |
Joe Bruce
|
|
|
(1st Rev Comp) 04/17 (L3) 1st Interstate Bank, ePlan (Bldg)
|
Routing - PLAN CHECK | 4/22/2019 | | 4/25/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/25/2019 | | DONE |
|
|
|
MET TUCKER@BABCOCKDESIGN.COM
NEED GC
NEED Rev Val
|
Plan resubmittals received | | | 4/22/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 4/22/2019 | | 4/22/2019 | | PASS |
Andrea Tuning
|
|
|
Appeal period expired on March 29, 2019.
|
Route to Impact Fee Review | 4/16/2019 | 4/19/2019 | 4/16/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 3/21/2019 | 3/21/2019 | 4/16/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Review 04.16.2019.pdf
|
Routing - PLAN CHECK | 4/16/2019 | | 4/16/2019 | | PASS |
Andrea Tuning
|
|
|
|
1st review completed | | | 4/16/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 4/16/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 3/21/2019 | | 4/16/2019 | | FAIL |
Joe Bruce
|
|
|
Emailed changemarks to applicant.
|
Routing - MECHANICAL | 3/21/2019 | | 3/28/2019 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2019 | | 3/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 3/21/2019 | | 3/21/2019 | | PASS |
Michael Zawacki
|
|
|
Minor TI, no ESC required.
|
Routing - Addressing | 3/21/2019 | | 3/21/2019 | | PASS |
Doug Chausow
|
|
|
Suite 110
|
Routing - Design Review | 3/21/2019 | | 3/21/2019 | | FAIL |
Andrea Tuning
|
|
|
Waiting for appeal period to expire. I will be able to sign off at 5:00 pm on Friday March 29, 2019.
|
Plan Reviewer's activity | | | 3/21/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with applicant regarding this project being routed as a #520, Level 3 application since it is the first time build out of the space. Applicant will send verification of impact fees prior to issuance of permit. **JHB**
|
Intake Approval | | | 3/21/2019 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
pre screen accepted by Brian
|
Intake Approval | | | 3/14/2019 | | FAIL |
Brian McGowan
|
|
|
03/14 -
Please verify or provide the following information for your prescreen to be approved.
1. G001 indicates the 2012 IBC Occupancy Loads. (2015 IBC required)
2. Applicable Codes and Standards need to be updated to current Adopted Boise City Codes.
3. Sheets A113, A611 or P2.0 were not uploaded.
4. Sheet E201 does not show Exit Signs and Emergency Lighting
5. Sheets M000, M001, M501, M502 Did not leave space for the City Stamp.
6. Are there Sheets P2.0, M0.1 and M2.0 as noted in the Submittal Checklist? If so, please upload them.
7. If the door between the Open Office and Conference Room is new, please provide P&Z Approval Letter for an exterior alteration.
|
Intake Approval | | | 3/12/2019 | | FAIL |
Brian McGowan
|
|
|
The proposed drawings for this project failed to upload.
|
Application received | | | 3/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2019 4:25PM
|