Permit Information
Permit NumberBLD19-03790
StatusIssued
Name ENGINEERED STRUCTURES INC
Site Address 8665 W EMERALD ST Unit: 140
Project NameIntermountain Claims
Customer Number 
ePlanReviewYes
Description
(INTERMOUNTAIN CLAIMS - SUITE #140) Permit to combine two existing vacant business spaces (suite #140 @ 8,550 sqft + suite #300 @ 2,515 sqft.) to create one tenant space (suite #140 11,065 sqft.). Work to include: Demo select interior walls, construct interior walls, doors, electrical work, mechanical work, and finishes. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/17/201910/21/201910/21/2019APASS
DetailsMike Jordan
Terry Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection10/18/201910/21/201910/21/2019APASS
DetailsTroy Cobbley
Life safety passed.

Terri Phone #: ###-####
FIRE-Final Inspection10/17/201910/18/201910/18/2019PCANC
DetailsTroy Cobbley
Need the project related fire sprinkler permit finaled prior to a fire life safety inspection. Terry Phone #: ###-####
FIRE-Conference10/16/201910/16/201910/16/2019PDONE
DetailsTroy Cobbley
We went over life safety requirements. I noted sprinkler modifications are needed and it appear additional emergency lights may be needed. No approved plans were on site.
FIRE-Supply Line Hydro10/15/201910/16/201910/16/2019ACANC
DetailsTroy Cobbley
Wrong inspection type called in. Should have been conference.
Terry Phone #: ###-####
BLD-Framing/Rough-in10/14/201910/14/201910/14/2019PPASS
DetailsMike Jordan
Dusty Phone #: ###-####. Interior steel stud framed walls for two new offices only ok.
Print Occupancy Form  10/14/2019 DONE
Issue PAID IN FULL permit  10/14/2019 DONE
Permit Ready to Issue  10/11/2019 DONE
ALL MET- Need
GC Form
Revised Cert of Value
Route to Impact Fee Review10/9/201910/12/201910/10/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (M_H)9/27/2019 10/10/2019 DONE
DetailsMichael Hanson
1st review completed - 10/10 #518 L2 ePlan - Intermountain Claims
Routing - PLAN CHECK10/10/2019 10/10/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  10/10/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK9/27/2019 10/9/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for corrections required.
1st review completed  10/9/2019 FAIL
DetailsMichael Hanson
Routing - Addressing9/27/2019 10/1/2019 PASS
DetailsDoug Chausow
Suite 140
Routing - PUBLIC WORKS9/27/2019 9/27/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Intake Approval  9/26/2019 PASS
DetailsJavier Guzman
Application received  9/24/2019 DONE
Application submitted via PDS Online on Sep 24 2019 3:19PM