Permit Information
Permit NumberFIR18-00654
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 1330 E EXCHANGE ST
Project NameDMS Fire main underground
Customer Number 
ePlanReviewYes
Description
(underground only) FDC will be placed on front of building, PIV will be remote see revised drawings, 6 inch Underground piping for future fire sprinkler system
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/12/20194/15/20194/15/2019PPASS
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in/Hydro4/12/20194/15/20194/15/2019APASS
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Supply line flush4/12/20194/15/20194/12/2019ACANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
INSP-Sprinkler Rough-in/Hydro4/12/20194/12/20194/12/2019PPASS
DetailsTroy Cobbley
The underground hydro test was witnessed with no visible loss on the guage. Per conversation with the general contractor it appears that there will be adequate coverage for the underground supply piping when the asphalt has been installed. See previous entry for coverage concerns.
INSP-Supply line flush2/19/20192/20/20192/20/2019PDONE
DetailsJim Page
Undergournd main line flush complete.

Please call chris ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
Sprinkler Plan Check11/8/2018 11/8/2018 PASS
DetailsAdele J Schaffeld-Griffin
AS builts submitted
Permit Ready to Issue  11/8/2018 DONE
CHANGE STATUS TO (ISS)  11/8/2018 DONE
Plan Modification Accepted  11/6/2018 DONE
started plan mod in e plan-sheets FP1 will be submitted in e plan as well as the checklist-assigned to Adele
INSP-Sprinkler Rough-in/Hydro11/2/201811/5/201811/5/2018PPASS
DetailsTroy Cobbley
The remaining length of underground is ok for cover. Plans need to be resubmitted showing the new underground pipe routing. Also I spoke with the contractor about possible bury depth issues as previously noted.


Please call Clarncce Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in/Hydro10/31/201811/1/201811/1/2018PPART
DetailsJim Page
Partial rough to cover inspection for underground supply complete, area inspected today is the piping from the IBR and to the PIV and the section of piping to the west of the PIV to the change of direction. Area inspected approved for cover, remaining underground to be installed at a later date. A re-submittal will be required for the alterations made to the underground.

please call chris ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in10/4/201810/5/201810/5/2018APART
DetailsTroy Cobbley
Todays inspection was just for the 5' stub out which is passed. However exact dept of cover could not be verified. The top of the 6" pipe is located 4'-10" below the line where the blocks sit on the footing. There are two sewer/drain covers roughly 6' away from the pipe which have been place only 2'-10" above the pipe. If these covers are finish grade the the pipe is much too shallow and will need to be dug up and located at the correct depth. I spoke to the sprinkler designers who brought the plans and discussed my concerns and the implications if the pipe is too shallow. The 5' stub out is ok to cover but if too shallow will need to be corrected. No general contractor was on site to verify the actual final grade elevation.


For initial underground inspection Phone #: ###-#### Inspection requested via web by Jessia Maxwell
Issue and Print Permit  9/13/2018 DONE
Plan assigned to (Adele)8/22/2018 9/13/2018 DONE
DetailsAdele J Schaffeld-Griffin
Staff review8/31/20188/31/20188/31/2018 PASS
DetailsAdele J Schaffeld-Griffin
okay to remove PIV and FDC location approved by Josh W in DR
PLANS/APPL TAKEN TO FRONT DESK  8/31/2018 DONE
Permit Ready to Issue  8/31/2018 DONE
Sprinkler Plan Check9/13/2018 8/31/2018 PASS
DetailsAdele J Schaffeld-Griffin
Staff review8/24/20188/24/20188/24/2018 FAIL
DetailsAdele J Schaffeld-Griffin
The changes to the bike parking and the landscaping need to be approved by design review prior to my issuing this permit. Please contact Josh Wilson in DR at ###-#### if you have questions of the DR process.
1st review completed  8/24/2018 FAIL
DetailsAdele J Schaffeld-Griffin
Intake Approval  8/22/2018 PASS
DetailsAdele J Schaffeld-Griffin
Sprinkler Plan Check8/22/2018 8/22/2018 FAIL
DetailsAdele J Schaffeld-Griffin
Application received  8/18/2018 DONE
Application submitted via PDS Online on Aug 18 2018 9:39AM