Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberFIR18-00698
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 11792 W KING ST
Project NameFairview Apts Bldg #1
Customer NumberUDG ONLY
ePlanReviewYes
Description
***QUICK PERMIT***See Notes on Plan - MAS**[Fairview Apartments Building #1 - UDG Only] - Quick Permit**Plan Mod for address change approved**MAS**
Install a dedicated 4" fire line. A full fire sprinkler submittal will follow at a later date.

[BLD18-03116]
Building 1 (3 Story, 24 Unit): Bldg 1 (3 story 24 Units), for the apartment project at 11716 Fairview. Total of 6 building, 96 Units.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/28/20197/1/20197/1/2019PPASS
DetailsTroy Cobbley
Permit finaled

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection6/27/20196/28/20196/28/2019ACANC
DetailsJim Page
Could not final, fire alarms not ready, this request is cancelled.

Gabe Garduno is the contact. Thank you for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro6/20/20196/21/20196/21/2019APASS
DetailsTroy Cobbley
Underground hydro test witnessed with no visible loss of pressure.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro6/18/20196/19/20196/19/2019AFAIL
DetailsTroy Cobbley
Underground hydro test failed due to visible loss on the guage.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush6/18/20196/19/20196/19/2019APASS
DetailsTroy Cobbley
Supply line re-flush witnessed
INSP-Sprinkler Rough-in6/17/20196/18/20196/18/2019APASS
DetailsTroy Cobbley
The underground supply line had a leak, was repaired and now can be re-covered.

Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro6/12/20196/12/20196/12/2019PDONE
DetailsJim Page
Hydrostatic test for underground supply witnessed, no pressure loss observed.
INSP-Supply line flush6/11/20196/12/20196/12/2019ADONE
DetailsJim Page
Underground main line flush complete.

Gabe Garduno is the contact. Stacey with Suez will be at this building as well as 11783 at 10:00 AM to do this underground flush. This inspection is to be at the same time as above ground hydros for both buildings as well. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/25/20193/26/20193/26/2019ACANC
DetailsTroy Cobbley
Underground supply line piping and the breeze way underground piping is ok for cover.

Bryan Collins is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus//
cancel inspection per Troy Cobbley 3-27-19 j.a
Plan Modification Accepted  3/20/2019 DONE
requested by cam hess
Plan assigned to (Stumbaugh)3/20/2019 3/20/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/20/2019 3/20/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/20/2019 DONE
DetailsMark Stumbaugh
No Fee
Permit Ready to Issue  3/20/2019 DONE
CHANGE STATUS TO (ISS)  3/20/2019 DONE
plan mod
CHANGE STATUS TO (ISS)  3/20/2019 DONE
Issue and Print Permit  3/12/2019 DONE
Plan resubmittals received  2/11/2019 DONE
DetailsMark Stumbaugh
Intake Approval  2/11/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)2/11/2019 2/11/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check2/11/2019 2/11/2019 PASS
DetailsMark Stumbaugh
As Noted on Plan
PLANS/APPL TAKEN TO FRONT DESK  2/11/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  2/11/2019 DONE
met
Miscellaneous action  2/6/2019 DONE
DetailsMark Stumbaugh
Phone call:" requesting more information on how piping is to be ran under the breezeway.
Plan resubmittals received  2/6/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)2/6/2019 2/6/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check2/6/2019 2/6/2019 FAIL
DetailsMark Stumbaugh
More detail on the piping going under the breezeway needed as per our phone conversation
PLANS/APPL TAKEN TO FRONT DESK  2/6/2019 DONE
DetailsMark Stumbaugh
Intake Approval  9/6/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)9/6/2018 9/6/2018 DONE
DetailsTim Frost
Sprinkler Plan Check9/6/2018 9/6/2018 FAIL
DetailsTim Frost
1st review completed  9/6/2018 FAIL
DetailsTim Frost
Application received  9/5/2018 DONE
Application submitted via PDS Online on Sep 5 2018 9:39PM