Plan assigned to (Lee) | 5/8/2020 | | 5/11/2020 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 5/11/2020 | | PASS |
|
|
|
|
1st review completed | | | 5/11/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 5/11/2020 | | 5/11/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 5/11/2020 | | DONE |
|
|
|
As built correction - No Fee.
|
Permit Ready to Issue | | | 5/11/2020 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 5/11/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/11/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/8/2020 | | DONE |
|
|
|
as built requested by Stephanie Cobbley per eplanreview email
|
INSP-Final Inspection | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PART |
Jim Page
|
|
|
No noted items for level 1 walkthrough.
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
INSP-Final Inspection | 12/27/2019 | 12/30/2019 | 12/30/2019 | P | PART |
Jim Page
|
|
|
Walkthrough completed for remaining level 2 and basment level. Walkthrough not performed on level 1, base of A/V devices were masked for painting, could not see candella setting.
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
Plan assigned to (Lee) | 12/24/2019 | | 12/27/2019 | | DONE |
Lee G Meredith
|
|
|
as builts
|
1st review completed | | | 12/27/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 12/27/2019 | | 12/27/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/27/2019 | | DONE |
|
|
|
As built - No fee.
|
CHANGE STATUS TO (ISS) | | | 12/27/2019 | | DONE |
|
|
|
as built
|
Plan resubmittals received | | | 12/24/2019 | | DONE |
|
|
|
Stephanie request eplan to be re opened for as builts.
|
INSP-Final Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PART |
Jim Page
|
|
|
Northside of level 2 walkthrough complete, approved plans are notated for areas of correction.
|
INSP-Final Inspection | 12/10/2019 | 12/12/2019 | 12/12/2019 | P | FAIL |
Jim Page
|
|
|
Level 3 floor plan does not match what was provided to the fire alarm designer, corrections need to be made for proper coverage..
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
INSP-Final Inspection | 12/4/2019 | 12/6/2019 | 12/6/2019 | A | PART |
Jim Page
|
|
|
Walk through complete for levels 4, 5 and 6, notated city approved plans with red ink for corrections.
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
INSP-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 | P | PART |
Jim Page
|
|
|
Walk through complete for levels 7 and 8, notated city approved plans with red ink for corrections.
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
INSP-Final Inspection | 11/25/2019 | 11/27/2019 | 11/27/2019 | A | PART |
Jim Page
|
|
|
Walk through complete for penthouse and level 9, notated city approved plans with red ink for corrections, level 9 has a room that is a telephone room, not a telecom room, provide notification in telephone room. Conference room on level 9 is in a different location tahn the drawings, A/V device is overspaced due to wall location. Will verify correction on a future inspection.
Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
|
Permit Ready to Issue | | | 10/15/2019 | | DONE |
|
|
|
Plan mod DO NOT ISSUE
|
CHANGE STATUS TO (ISS) | | | 10/15/2019 | | DONE |
|
|
|
plan mod fee paid change to ISS
|
1st review completed | | | 10/14/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 10/14/2019 | | 10/14/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/14/2019 | | DONE |
|
|
|
Plan mod approved.
3 hours review time @ $65 per hour = $195.00
112 new alarm devices @ $4.60 ea. = $515.20
Total = $710.20
|
Intake Approval | | | 10/11/2019 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 10/10/2019 | | DONE |
|
|
|
plan mod request per Stephanie Cobbley email(see doc)
|
Plan assigned to (Lee) | 10/10/2019 | | 10/10/2019 | | DONE |
Judith Amador
|
|
|
plan mod
|
Issue and Print Permit | | | 12/13/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 12/7/2018 | | 12/11/2018 | | PASS |
Lee G Meredith
|
|
|
Review passed as noted.
|
PLANS TAKEN FRONT DESK ALARM | | | 12/11/2018 | | DONE |
|
|
|
Plans passed review as noted on drawings and review comments.
|
Permit Ready to Issue | | | 12/11/2018 | | DONE |
|
|
|
met
|
Miscellaneous action | | | 12/10/2018 | | DONE |
|
|
|
Emailed Kenny to ask if existing fire smoke dampers had in duct detection - not shown on current design. We agreed that nonitored in duct smoke detection that is rated for zero air flow is required at each fire smoke damper unless open area coverage is installed in an approved manner. Existing sample tube detection at these locations is not allowed to be reused. As built drawings showing in duct detection is required prior to acceptance testing.
|
1st review completed | | | 12/10/2018 | | FAIL |
|
|
|
Failed prescreen review. One drawing rotated 180 degrees. All drawings were missing adequate space for approval stamps. Returned to Kenny for corrections.
|
Plan resubmittals received | | | 12/7/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/6/2018 | | DONE |
|
|
|
Kenny emailed me after the resubmittal and requested I delete drawings CHQ RA-4 third flr, CHQ FA-6 seventh flr and CHQ FA-18 Calcs 4.
|
Application received | | | 11/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 5 2018 2:05PM
|