Permit Information
Permit NumberFIR18-00891
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 535 S 15TH ST
Project Name15th & River St Condos Bldg #2
Customer Number 
ePlanReviewYes
Description
[15th & River St Condos Bldg #2 - Udg Only] - Quick Permit
Install a dedicated 4" x 53'± C-900 underground piping into the new condo bldg. The full fire protection plan will be submitted at a later date.
3/28/2019: Plan Mod for relocation of underground from that on original plans. **MAS**
[BLD17-03010]
Permit for the construction of a 3-story 5-unit concrete and wood framed apartment building with work to include general site work and construction of the new building per the approved plans. Special inspections required per attached Form 310. This building is fully fire sprinklered with an NFPA 13-R system. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/17/20203/18/20203/18/2020PPASS
DetailsJim Page
Final underground supply inspection is complete.

Robert Chambers is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro7/29/20197/30/20197/30/2019ADONE
DetailsJim Page
Hydrostatic test witnessed, no pressure loss observed.

Reashard Howard is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro7/26/20197/29/20197/29/2019AFAIL
DetailsJim Page
Underground lost 6 psi during hydro

Reashard Howard is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro7/23/20197/26/20197/26/2019PCANC
DetailsJim Page
Could not complete hydrostatic test due to time constraints, hydro will need to be rescheduled.

Robert Chambers is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush7/23/20197/26/20197/26/2019PDONE
DetailsJim Page
Underground main line flush complete.

Robert Chambers is the contact. Stacey with Suez is aware of this flush, and will be there. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro7/17/20197/18/20197/18/2019PCANC
DetailsJim Page
Robert Chambers is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Supply line flush7/17/20197/18/20197/18/2019PCANC
DetailsJim Page
Robert Chambers is the contact. Stacey with Suez is aware of this inspection and will be there to perform the flush. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in4/5/20194/5/20194/5/2019PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

Bryan Collins is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
Plan Modification Accepted  3/28/2019 DONE
per cam hess
Plan assigned to (Stumbaugh)3/28/2019 3/28/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check3/28/2019 3/28/2019 PASS
DetailsMark Stumbaugh
Plan Modification Accepted  3/28/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  3/28/2019 DONE
DetailsMark Stumbaugh
No Fee
Permit Ready to Issue  3/28/2019 DONE
plan mod
CHANGE STATUS TO (ISS)  3/28/2019 DONE
plan mod no fees
INSP-Sprinkler Rough-in2/19/20192/19/20192/19/2019PFAIL
DetailsJim Page
Install does not match city approved drawings, piping is currently located under a future stairwell install.

The contact is Brian Collins. Thank you for your work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/11/20192/12/20192/12/2019AFAIL
DetailsJim Page
Could not locate city approved drawings, piping is still covered, could not verify cover depth.

Cam Hess is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/6/20192/6/20192/6/2019PFAIL
DetailsJim Page
Underground piping was covered before inspection was performed, all cover material needs to be removed from changes of direction as well as spot checked on longer runs of piping to verify proper depth of cover for what was installed. City approved drawings for undergorund supply need to be available at time of inspection.

Cam Hess is the contact. Thanks for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
Issue and Print Permit  11/28/2018 DONE
Intake Approval  11/27/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)11/27/2018 11/27/2018 DONE
DetailsTim Frost
Sprinkler Plan Check11/27/2018 11/27/2018 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/27/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/27/2018 DONE
DetailsTim Frost
Permit Ready to Issue  11/27/2018 DONE
all requirements met
Application received  11/21/2018 DONE
Application submitted via PDS Online on Nov 21 2018 11:51AM