Information based on query as of Sunday, April 28, 2024.
Permit Information
Permit NumberFIR19-00012
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 465 W GOWEN RD
Project NameBSD Ops & Maint. T.I.
Customer Number 
ePlanReviewYes
Description
The School district is adding a equipment shelter which State Fire will protect by connecting to the existing dry system in the main building and grade it back so that it drains to the existing building.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/11/20193/13/20193/13/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Final Inspection2/26/20192/27/20192/27/2019PFAIL
DetailsJim Page
Dry system did not meet time requirements for valve trip test.

Trip test Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Final Inspection2/14/20192/15/20192/15/2019PFAIL
DetailsJim Page
Dry pipe valve needs to be serviced, clapper did not open with inspectors test flow.

Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Sprinkler Rough-in/Hydro2/13/20192/14/20192/14/2019PDONE
DetailsJim Page
Hydrostatic test for newly installed overhead fire sprinkler piping witnessed, no pressure loss observed.

Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Sprinkler Rough-in/Hydro2/11/20192/12/20192/12/2019ACANC
DetailsJim Page
Temperature did not get above 40 degrees, hydro cancelled per conversarion with point of contact, inspection request will be rescheduled to coincide with allowable weather for hydrostatic test.

Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Final Inspection2/4/20192/5/20192/5/2019ACANC
DetailsJim Page
Still need to complete hydrostatic test for newly installed overhead sprinkler piping. (weather permitting) needs to be 40 degrees or above. This request is cancelled.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro2/4/20192/5/20192/5/2019ADONE
DetailsJim Page
24 hr test complete, no pressure loss observed.

24hr air test and hydro Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro2/4/20192/4/20192/4/2019PPART
DetailsJim Page
24 hour air test started at 1PM with 41 psi on new piping.

24hr air test Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Final Inspection2/1/20192/4/20192/4/2019AFAIL
DetailsTroy Cobbley
Rough-in passed for the most part. There were no small documents, will need 200lb hydro, 24 hr air, trip test....ect. prior to a final.

please give half hour notice Phone #: ###-#### Inspection requested via web by jeremiah robison
Plan resubmittals received  1/17/2019 DONE
DetailsMark Stumbaugh
Intake Approval  1/17/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/17/2019 1/17/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check1/17/2019 1/17/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/17/2019 PASS
DetailsMark Stumbaugh
Permit Ready to Issue  1/17/2019 DONE
met
Issue and Print Permit  1/17/2019 DONE
Sprinkler Plan Check1/11/2019 1/16/2019 FAIL
DetailsMark Stumbaugh
Correction needed
PLANS/APPL TAKEN TO FRONT DESK  1/16/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  1/11/2019 PASS
DetailsMark Stumbaugh
Plan resubmittals received  1/11/2019 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/11/2019 1/11/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check1/8/2019 1/9/2019 FAIL
DetailsMark Stumbaugh
See review comments
PLANS/APPL TAKEN TO FRONT DESK  1/9/2019 FAIL
DetailsMark Stumbaugh
Application received  1/8/2019 DONE
Application submitted via PDS Online on Jan 8 2019 9:30AM
Intake Approval  1/8/2019 FAIL
DetailsMark Stumbaugh
No Stamp Area on Plans
Intake Approval  1/8/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)1/8/2019 1/8/2019 DONE
DetailsMark Stumbaugh