BLD-Final | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Final | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PART |
Tony Young
|
|
|
Bruce ###-####,, needs guard rail at stair landing to meet max opening 4", all else ok pending trades
|
BLD-Final | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PEND |
Tony Young
|
|
|
Bruce ###-####,, needs to close up stair around window,, then ok pending others,, need to verify with Project Manager Ron Hill prior to passing completely
|
FIRE-Final Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. 2015 IFC was approved per official request to Ron Johnson with Boise Fire to be used for the access control system due to the changes made in the code cycle between 2012 IFC and 2015 IFC, code segment 1010.1.9.8 is allowed from the 2015 IFC instead of the requirements of the 2012 IFC section 1008.1.9.8.
Final life fire safety inspection is complete.
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PART |
Jim Page
|
|
|
Life fire safety inspection for phase 2 TCO complete.
|
BLD-Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, temp occupancy ok in aggreed area,, gym, mezzanine
|
FIRE-Final Inspection | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | NR |
Jim Page
|
|
|
Fire alarm inspection failed, all other life fire safety items are in place and active for phase 2 TCO.
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, fire alarm system not ready for inspection.
late morning // Bruce Phone #: ###-####
|
BLD-Final | 4/18/2019 | 4/19/2019 | 4/19/2019 | P | NR |
Jim Storey
|
|
|
Bruce Phone #: ###-####
|
BLD-Final | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,,, TCO OK phase 1 west area
|
FIRE-Final Inspection | 2/21/2019 | 2/22/2019 | 2/22/2019 | A | PART |
Jim Page
|
|
|
TCO Phase 1 life fire safety inspection complete.
Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Tony Young
|
|
|
Bruce Phone #: ###-####
|
FIRE-Final Inspection | 1/25/2019 | 1/28/2019 | 1/28/2019 | A | CANC |
Jim Page
|
|
|
Cancelled per conversation with GC, inspection will be rescheduled for a later date.
Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, entry ok
|
FIRE-Conference | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | DONE |
Jim Page
|
|
|
Conference complete.
Coordinated for 930AM with Bruce
|
BLD-Conference | 1/3/2019 | 1/8/2019 | 1/8/2019 | A | PART |
Tony Young
|
|
|
Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####,, ?s about a final
|
FIRE-Conference | 1/3/2019 | 1/8/2019 | 1/8/2019 | A | DONE |
Jim Page
|
|
|
Temp C of O request- See Ron Hill to schedule plan Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | PART |
Jim Sly
|
|
|
Bruce Phone #: ###-#### Select ceilings........OK.
|
BLD-Ceiling Grid Inspection | 12/26/2018 | 12/26/2018 | 12/27/2018 | P | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### second floor ok to flood
|
BLD-Ceiling Grid Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, ok to set exterior tiles to get cabinets in
|
BLD-Framing/Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####,, gym wall fire blocking,, ok to cover
|
BLD-Framing/Rough-in | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, gym walls ok,, fireblocking almost done,, ok to cover when ready
|
BLD-Framing/Rough-in | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, 2nd floor ok,, fire blocking also ok
|
BLD-Framing/Rough-in | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | DEFR |
Tony Young
|
|
|
Bruce Phone #: ###-####,, out of time
|
BLD-Framing/Rough-in | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, walls on west side ok
|
BLD-Framing/Rough-in | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, frame walk through,, ok pending trades,, need fire blocking at certain areas,, ok to start sheet rocking areas..
|
BLD-Framing/Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | CANC |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 7/26/2018 | 7/30/2018 | 7/30/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, above ceiling
|
BLD-Framing/Rough-in | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, floor areas,, need to add squash blocks under some of bleacher beams,, ok after trades are passed
|
BLD-Conference | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, all exposed insulating foam needs to be covered by an approved material for fire/smoke control
|
BLD-Conference | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, fire blocking ?s on ridgid insulation areas,, same as wood 2012 IBC 718.2.2?
|
BLD-Footing | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PEND |
Tony Young
|
|
|
Bruce Phone #: ###-####
|
BLD-Footing | 10/12/2017 | 10/12/2017 | 10/13/2017 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####.. pending special inspection
|