Name CM COMPANY
Site Address 519 N 9TH ST
Project NameBoise High School - Gym
Customer Number 
ePlanReviewYes
Description
**Project Management-Ron Hill** (EXPEDITE REVIEW) (BOISE HIGH SCHOOL – GYM REMODEL AND PERFORMING ARTS CLASSROOM ADDITION) (DRH17-00000) The fire sprinkler system is used for building area increase and for fire area. The entire single story West classroom portion of this building will be demolished. Within the Gym portion of this building on the 1st story the elevated wood framed stage, two structural columns, the locker rooms and the mezzanine floors above, the exterior windows, exterior doors, and the wood bleachers will be demolished. The East mezzanine will be maintained.

To construct a new 28,186 square foot classroom addition on the West side of the existing Gym building (9,189 square feet basement, 9,778 square feet 1st story, and 9,219 square feet 2nd story). For the new portion of this building, work is to include concrete footings; concrete foundations; basement concrete slab on grade; concrete and steel pan deck floors supported by steel columns, beams, and joists; masonry exterior walls; masonry exterior veneer; steel roof system with insulation installed on top of the roof deck; single ply roofing membrane; steel awnings; three coat exterior plaster; exterior concrete landings, stairs, and ramps with handrails and guards for this addition and for the building to the North; new concrete sidewalks; an elevator and 1-hr elevator shaft; interior walls; 4 toilet rooms accessible to the disabled; an assisted-use toilet room accessible to the disabled; interior stairways; doors; windows; and finishes.

To remodel an existing 31,341 square foot Gym building (12,048 square feet basement, 16,741 square feet 1st story, and 2,552 square feet 1st story mezzanine). For the Gym, work is to include structural modifications to the roof structure (i.e. new trusses, new truss braces, diaphragm cords, perimeter diaphragm nailing, parapet braces, etc. to replace removed columns and beams); interior steel columns and beams at exterior walls to resist out-of-plane lateral loads; floor structures at sunken floors; steel headers and jams at new masonry and concrete wall openings; wall furring; insulation installed on top of the roof deck; new single ply roofing membrane; new landings and bollards at exterior doors that swing into the alley; exterior brick infills at window openings in the alley wall; exterior brick repairs; handrails at the existing East exterior stairways; new interior stairways; a new 1-hr stairway enclosure; an elevator and elevator shaft; new exterior doors and aluminum windows; extending wood flooring for the playing court; bleachers; two toilet rooms accessible to the disabled on the 1st story; basement locker rooms with accessible showers, toilets, urinals, and lockers; interior walls; millwork; and finishes.

Special Inspection is required for soils, concrete, masonry, steel (including welding and bolting), and anchors post installed in hardened concrete and brick. The design for the tiered platform within the Micro Theater is a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system with an emergency voice/alarm communication system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/25/201911/26/201911/26/2019APASS
DetailsTony Young
Phone #: ###-####
BLD-Final8/6/20198/7/20198/7/2019APART
DetailsTony Young
Bruce ###-####,, needs guard rail at stair landing to meet max opening 4", all else ok pending trades
BLD-Final8/5/20198/6/20198/6/2019APEND
DetailsTony Young
Bruce ###-####,, needs to close up stair around window,, then ok pending others,, need to verify with Project Manager Ron Hill prior to passing completely
FIRE-Final Inspection6/19/20196/19/20196/19/2019PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. 2015 IFC was approved per official request to Ron Johnson with Boise Fire to be used for the access control system due to the changes made in the code cycle between 2012 IFC and 2015 IFC, code segment 1010.1.9.8 is allowed from the 2015 IFC instead of the requirements of the 2012 IFC section 1008.1.9.8.

Final life fire safety inspection is complete.

Bruce Phone #: ###-####
FIRE-Final Inspection4/24/20194/24/20194/24/2019PPART
DetailsJim Page
Life fire safety inspection for phase 2 TCO complete.
BLD-Final4/23/20194/24/20194/24/2019APART
DetailsTony Young
Bruce Phone #: ###-####,, temp occupancy ok in aggreed area,, gym, mezzanine
FIRE-Final Inspection4/23/20194/23/20194/23/2019PNR
DetailsJim Page
Fire alarm inspection failed, all other life fire safety items are in place and active for phase 2 TCO.

Bruce Phone #: ###-####
FIRE-Final Inspection4/18/20194/19/20194/19/2019ACANC
DetailsJim Page
Inspection request cancelled per conversation with point of contact, fire alarm system not ready for inspection.

late morning // Bruce Phone #: ###-####
BLD-Final4/18/20194/19/20194/19/2019PNR
DetailsJim Storey
Bruce Phone #: ###-####
BLD-Final2/21/20192/22/20192/22/2019APART
DetailsTony Young
Bruce Phone #: ###-####,,, TCO OK phase 1 west area
FIRE-Final Inspection2/21/20192/22/20192/22/2019APART
DetailsJim Page
TCO Phase 1 life fire safety inspection complete.

Bruce Phone #: ###-####
BLD-Ceiling Grid Inspection1/29/20191/29/20191/29/2019PPASS
DetailsTony Young
Bruce Phone #: ###-####
FIRE-Final Inspection1/25/20191/28/20191/28/2019ACANC
DetailsJim Page
Cancelled per conversation with GC, inspection will be rescheduled for a later date.

Bruce Phone #: ###-####
BLD-Ceiling Grid Inspection1/15/20191/16/20191/16/2019APART
DetailsTony Young
Bruce Phone #: ###-####,, entry ok
FIRE-Conference1/8/20191/9/20191/9/2019ADONE
DetailsJim Page
Conference complete.

Coordinated for 930AM with Bruce
BLD-Conference1/3/20191/8/20191/8/2019APART
DetailsTony Young
Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####,, ?s about a final
FIRE-Conference1/3/20191/8/20191/8/2019ADONE
DetailsJim Page
Temp C of O request- See Ron Hill to schedule plan Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####
BLD-Ceiling Grid Inspection1/4/20191/7/20191/7/2019APART
DetailsJim Sly
Bruce Phone #: ###-####
Select ceilings........OK.
BLD-Ceiling Grid Inspection12/26/201812/26/201812/27/2018PPART
DetailsDave Hannah
Bruce Phone #: ###-#### second floor ok to flood
BLD-Ceiling Grid Inspection12/10/201812/10/201812/10/2018PPART
DetailsTony Young
Bruce Phone #: ###-####,, ok to set exterior tiles to get cabinets in
BLD-Framing/Rough-in11/6/201811/7/201811/7/2018APASS
DetailsTony Young
Phone #: ###-####,, gym wall fire blocking,, ok to cover
BLD-Framing/Rough-in10/30/201810/31/201810/31/2018APART
DetailsTony Young
Bruce Phone #: ###-####,, gym walls ok,, fireblocking almost done,, ok to cover when ready
BLD-Framing/Rough-in9/18/20189/19/20189/19/2018APART
DetailsTony Young
Bruce Phone #: ###-####,, 2nd floor ok,, fire blocking also ok
BLD-Framing/Rough-in9/18/20189/18/20189/18/2018PDEFR
DetailsTony Young
Bruce Phone #: ###-####,, out of time
BLD-Framing/Rough-in9/4/20189/4/20189/4/2018PPART
DetailsTony Young
Bruce Phone #: ###-####,, walls on west side ok
BLD-Framing/Rough-in8/14/20188/15/20188/15/2018APART
DetailsTony Young
Bruce Phone #: ###-####,, frame walk through,, ok pending trades,, need fire blocking at certain areas,, ok to start sheet rocking areas..
BLD-Framing/Rough-in8/13/20188/13/20188/13/2018PCANC
DetailsDave Hannah
Bruce Phone #: ###-####
BLD-Framing/Rough-in7/26/20187/30/20187/30/2018APART
DetailsTony Young
Bruce Phone #: ###-####,, above ceiling
BLD-Framing/Rough-in3/22/20183/22/20183/22/2018PPART
DetailsTony Young
Scott Phone #: ###-####,, floor areas,, need to add squash blocks under some of bleacher beams,, ok after trades are passed
BLD-Conference2/7/20182/7/20182/7/2018PPART
DetailsTony Young
Bruce Phone #: ###-####,, all exposed insulating foam needs to be covered by an approved material for fire/smoke control
BLD-Conference1/5/20181/8/20181/8/2018APART
DetailsTony Young
Bruce Phone #: ###-####,, fire blocking ?s on ridgid insulation areas,, same as wood 2012 IBC 718.2.2?
BLD-Footing10/12/201710/13/201710/13/2017APEND
DetailsTony Young
Bruce Phone #: ###-####
BLD-Footing10/12/201710/12/201710/13/2017PPART
DetailsTony Young
Bruce Phone #: ###-####.. pending special inspection