BLD-Final | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Mike Jordan
|
|
|
shell and core permit Bld17-01449 is finaled, modifiations are done // Bruce Rolfe Phone #: ###-####. Ok for perm occ. No card to sign.
|
BLD-Final | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | CANC |
Mike Jordan
|
|
|
Derek Phone #: ###-####. Will reschedule.
|
FIRE-Final Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Jim Page
|
|
|
Exit discharge light is installed at main entry, final life fire safety inspection complete.
Derek Phone #: ###-####
|
BLD-Aging Inspection | 4/18/2018 | 4/18/2018 | 4/18/2018 | | PEND |
Mike Jordan
|
|
|
|
BLD-Final | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PART |
Jim Sly
|
|
|
Bruce Phone #: ###-#### OK for Temp Occ. OK for Perm Occ .When Architect submits drawing to the city which includes new double door installed in CMU wall East end. Installation appears to be typical of other new doorways installed in CMU wall per Architect/Engineer, Fire signs off for Perm Occ. and Building Exterior store front is completed.
|
FIRE-Final Inspection | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the exit discharge light is installed at the main exit.
Bruce Phone #: ###-####
|
BLD-Final | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | NR |
Mike Jordan
|
|
|
Late afternoon - Bruce Phone #: ###-####
|
FIRE-Final Inspection | 2/15/2018 | 2/15/2018 | 2/15/2018 | P | CANC |
Troy Cobbley
|
|
|
Plans are still in review
Late afternoon - Bruce Phone #: ###-####
|
FIRE-Final Inspection | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | CANC |
Troy Cobbley
|
|
|
Hugo Phone #: ###-####
|
FIRE-Final Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher on the mezzanine, provide a exit discharge light at the main exit, provide double door with panic hardware at the rear exit as per the T.I. plans
Hugo Phone #: ###-####
|
BLD-Other | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | FAIL |
Mike Jordan
|
|
|
CMU // Hugo Phone #: ###-####. New openings in interior CMU walls not done per approved plans and engineering. engineer of record to accept in place work and provide letter or provide approved fix or have in place work removed and installed per the approved drawings. Correction notice issued.
|