Permit Information
Permit NumberBLD17-03345
StatusFinaled
Name ANDERSEN CONSTRUCTION COMPANY IDAHO
Site Address 880 W RIVER ST
Project NameThe Afton Phase II - Dwellings
Customer NumberGRD17-00061
ePlanReviewYes
Description
(THE AFTON – FOUR STORIES OF DWELLING UNITS ABOVE THE GARAGE PODIUM OF PHASE II – WEST BUILDING) (DRH17-00213) (8-28-19 PLAN MODIFICATION TO REMOVE FINISHING UNIT 506 FROM THIS PERMIT. UNIT 506 WILL BE FINISHED UNDER A FUTURE SEPARATE PERMIT THAT WILL ALSO ESTABLISH A CERTIFICATE OF OCCUPANCY.) (3-5-19 PLAN MODIFICATION TO FILL CONCEALED COMBUSTIBLE SPACES WITH BLOWN-IN FIBERGLASS INSULATION ON THE 2ND, 3RD, AND 4TH STORIES IN LIEU OF COVERING THE COMBUSTIBLE WALL AND FLOOR MATERIALS WITH GYPSUM BOARD OR INSTALLING FIRE SPRINKLER HEADS WITHIN THE SPACES. THE 1-HR FIRE-RESISTANCE-RATED FLOOR-CEILING OR ROOF-CEILING ASSEMBLY ABOVE THE CONCEALED COMBUSTIBLE SPACE IS STILL REQUIRED. TO CREATE A SINGLE-USER TOILET ROOM ON THE 3RD STORY WITH ACCESS FROM A COMMON AREA. THE TOILET ROOM IS REQUIRED TO BE FULLY ACCESSIBLE TO THE DISABLED AS DEFINED BY COMMERCIAL STANDARDS.) (10-26-18 PLAN MODIFICATION TO ENLARGE THE MASTER BATHROOM AND TO ENLARGE THE GUEST BEDROOM IN UNIT 406. TO REVISE UNIT 512 TO MATCH UNITS 212, 312, AND 412. THE NUMBER AND TYPE OF PLUMBING FIXTURES WILL BE CHANGED. BOTH REVISED UNITS ARE REQUIRED TO COMPLY AS TYPE B DWELLING UNITS.) The fire sprinkler system (NFPA 13 below and above the podium) is used for story, height, and building area increase. The concrete podium was constructed under permit BLD17-03344. Uses are expected to include parking, storage, and perhaps office, retail sales, or assembly on the 1st story; two story residential condominiums on the 2nd story; and 1 story residential condominiums on the 2nd, 3rd, 4th, and 5th stories. To construct a 4 story, 66,878 square foot condominium dwelling unit building (71,400 including areas open to the sky) above a 22,327 square foot concrete podium shell that was constructed under another permit (18,553 square foot 2nd story, 17,875 square foot 3rd story, 15,225 square foot 4th story, and 15,225 square foot 5th story). Structural work is to include wood stud bearing and shear walls; structural sheathing for shear walls and floor diaphragms; shear wall hold downs; engineered wood floor joists, rim joists, beams, and columns; solid sawn wood headers, joists, and columns; engineered wood trusses and girder trusses; steel columns; and roof top screen walls for mechanical. Special Inspection is required for wood diaphragms, wind resistance, seismic resistance, etc. The design of wood trusses is a deferred submittal item. Other work includes 1-hr dwelling unit separation walls; 1-hr dwelling unit separation floors; 2-hr stairway enclosures, 2-hr fire barrier wall to function as a horizontal exit; 1-hr corridors; 2-hr trash chute with a vestibule at each story; insulation; exterior wall finishes; roof coverings; exterior windows; guardrails; awnings; concrete pavers and pedestals over a single ply roof membrane at decks; millwork; and finishes. Penetrations of the 3-hr podium for plumbing pipes, roof drains, hold downs for shear walls, etc. are required to be made without cutting any reinforcement, including post tensioned tendons. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The permit for the entire building shall not be finaled and a Certificate of Occupancy shall not be issued until the condo plat that removes the interior property line is completed. This permit is intended to establish a Certificate of Occupancy for the entire building except for the commercial shell space on the 1st story. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/4/201910/7/201910/7/2019PPASS
DetailsDave Hannah
Call Jesse please. Thank you! Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Final10/3/201910/4/201910/4/2019PCANC
DetailsDave Hannah
Call Jesse please! Phone #: ###-#### >> Inspection requested via web by Ami Ostrow Inspection cancelled from web by: Ami Ostrow
FIRE-Final Inspection10/3/201910/3/201910/3/2019PPASS
DetailsJim Page
Previously noted items have been corrected, fire sprinkler ispection is complete, fire aalrm inspection is complete, heat trace ispection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete.

Call jesse please Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Conference10/2/201910/2/201910/2/2019PPASS
DetailsDave Hannah
Please call Jesse Phone #: ###-#### Inspection requested via web by Ami Ostrow
FIRE-Final Inspection10/2/201910/2/201910/2/2019PFAIL
DetailsJim Page
Provide signage for doors 105-4 and S1-1 reading Roof Top Access as well as Fire sprinkler Floor Control access as discussed. Provide signage on S2-1 stating no roof top access per building fire code review comments, notes 8 and 15.

Please call Jesse for fire / life / safety. Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD-Conference9/26/20199/27/20199/27/2019PCANC
DetailsTony Young
Jason Phone #: ###-####
BLD-Conference9/25/20199/26/20199/26/2019PDEFR
DetailsTony Young
Jason Phone #: ###-####,,, wanted to show 425 fixes?
BLD-Final9/23/20199/24/20199/24/2019PPART
DetailsDave Hannah
Jason Phone #: ###-#### ok for tco
FIRE-Final Inspection9/23/20199/24/20199/24/2019APART
DetailsJim Page
Partial final inspwection for life fire safety is complete, item left for life fire safety is signage placed in north stairwell, install signage for fire sprinkler floor control access at discussed doors. Fire sprinkler inspection is complete, fire alarm inspection is complete. 45 day TCO authorized per conversation with Ron Johnson for life fire safety.

Jason Phone #: ###-####
BLD-Final9/19/20199/20/20199/20/2019ACANC
DetailsTell Riley
jason Phone #: ###-####//walked through units prior to TCO//will be calling for finals next week//
FIRE-Conference9/19/20199/19/20199/19/2019APART
DetailsJim Page
Items noticed on conference walkthrough, provide fire alarm notification in trash rooms, every level. Provide notification in level 4 elevator lobby.
FIRE-Final Inspection9/17/20199/19/20199/19/2019ACANC
DetailsJim Page
Request was for a conference on areas completed, this request is cancelled.

Jason Phone #: ###-####
FIRE-Final Inspection9/12/20199/16/20199/17/2019ACANC
DetailsTroy Cobbley
Cancel per Jason Phone #: ###-####
BLD-Framing/Rough-in9/13/20199/16/20199/16/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Final9/12/20199/16/20199/16/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
FIRE-Final Inspection9/10/20199/12/20199/12/2019PCANC
DetailsJim Page
Rescheduled per conversation with point of contact, this request is cancelled.

Jason- inspection for Levels #2 and #3 Phone #: ###-####
BLD-Conference9/11/20199/11/20199/11/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in9/3/20199/3/20199/4/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in8/26/20198/27/20198/27/2019APASS
DetailsDave Hannah
jASON Phone #: ###-####
BLD-Framing/Rough-in8/19/20198/19/20198/20/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in8/15/20198/15/20198/15/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-#### iner shaft wall mec shaft ok to cover floors 2-5
BLD-Framing/Rough-in8/9/20198/9/20198/9/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Other8/7/20198/7/20198/8/2019PPASS
DetailsDave Hannah
Jason-sofit Phone #: ###-#### 5th floor
BLD-Framing/Rough-in8/6/20198/6/20198/7/2019PFAIL
DetailsDave Hannah
Jason Phone #: ###-#### needs to add second layer of sheetrock trash shut wall
BLD-Framing/Rough-in8/5/20198/5/20198/6/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in7/25/20197/25/20197/25/2019PPASS
DetailsDave Hannah
Jason-trash shoot rooms Phone #: ###-####
BLD-Framing/Rough-in7/15/20197/15/20197/15/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in7/10/20197/11/20197/11/2019AFAIL
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in7/10/20197/10/20197/10/2019PPEND
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/25/20196/25/20196/25/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/13/20196/13/20196/17/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/6/20196/7/20196/7/2019APART
DetailsDave Hannah
JASON Phone #: ###-#### 4th floor corrador drops ok to cover
BLD-Energy code compliance6/4/20196/5/20196/5/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in6/3/20196/3/20196/4/2019PPART
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance5/29/20195/30/20195/30/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/15/20195/15/20195/21/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/20/20195/20/20195/21/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/16/20195/16/20195/16/2019APASS
DetailsDave Hannah
Jason Phone #: ###-#### 3rd floor corr ok to cover
BLD-Framing/Rough-in5/14/20195/15/20195/15/2019APART
DetailsDave Hannah
Jason Phone #: ###-#### 3rd fl corr drops ok and stair tower to roof ok to cover4
BLD-Framing/Rough-in5/10/20195/10/20195/10/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in5/7/20195/8/20195/8/2019PCANC
DetailsDave Hannah
jason Phone #: ###-####
BLD-Energy code compliance4/29/20194/30/20194/30/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/24/20194/24/20194/24/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/17/20194/18/20194/18/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/15/20194/15/20194/16/2019PPART
DetailsDave Hannah
Jason Phone #: ###-#### drop ceilings 4th floor first 5 units ok
BLD-Energy code compliance4/12/20194/12/20194/12/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/10/20194/11/20194/11/2019APART
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/5/20194/8/20194/8/2019APART
DetailsDave Hannah
Jason Phone #: ###-#### third floor drop ceilings ok
BLD-Framing/Rough-in4/2/20194/3/20194/4/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in4/1/20194/1/20194/2/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/26/20193/26/20193/27/2019PDONE
DetailsDave Hannah
5th level // Jesse Phone #: ###-####
BLD-Energy code compliance3/22/20193/25/20193/25/2019ADONE
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/20/20193/21/20193/21/2019APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in3/19/20193/20/20193/20/2019APASS
DetailsDave Hannah
Jason Phone #: ###-#### drop ceilings rms 211-215
BLD-Framing/Rough-in3/19/20193/19/20193/20/2019PPART
DetailsDave Hannah
jason Phone #: ###-####5th foor ok to rock first 8ft of walls first 4 rooms
BLD-Energy code compliance3/19/20193/19/20193/19/2019PPART
DetailsDave Hannah
jason Phone #: ###-####
BLD-Framing/Rough-in3/15/20193/15/20193/19/2019PCANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in3/15/20193/18/20193/19/2019ACANC
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/15/20193/15/20193/18/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance3/13/20193/14/20193/14/2019APASS
DetailsDave Hannah
Jesse Phone #: ###-####
BLD-Framing/Rough-in3/7/20193/7/20193/14/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in3/8/20193/8/20193/11/2019PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Other3/5/20193/5/20193/5/2019PPART
DetailsDave Hannah
Jason-fire caulking-plan mod doesn''t have anything to do with this inspection (per Jason) Phone #: ###-#### rim in ceiling of two hr wall sw side 3rd flr
BLD-Other3/1/20193/4/20193/4/2019APART
DetailsDave Hannah
fire proofing // Jason Phone #: ###-####
BLD-Energy code compliance2/26/20192/27/20192/27/2019APART
DetailsBrandon Shaw
Per walk through, seal all vertical penetrations, 4th floor units...
BLD-Energy code compliance2/25/20192/25/20192/25/2019PPASS
DetailsMike Jordan
Jason-per Jason-doesn''t have anything to do with the plan mod that''s in for review Phone #: ###-####. 3rd floor insulation ok. 2nd floor, 2hr. wall ok per alternate detail at rim board.
BLD-Energy code compliance2/13/20192/14/20192/15/2019PPART
DetailsDave Hannah
Jason Phone #: ###-#### second floor ok ok to start insulating thrird fl
BLD-Framing/Rough-in2/8/20192/11/20192/12/2019APART
DetailsDave Hannah
2nd floor - Jason Phone #: ###-####
BLD-Framing/Rough-in2/4/20192/5/20192/5/2019APEND
DetailsDave Hannah
Jason Phone #: ###-#### needs to see how they are going to protect corrador wall that shower side
BLD-Energy code compliance1/31/20192/1/20192/1/2019APART
DetailsBrandon Shaw
5 rooms on 2nd floor
BLD-Framing/Rough-in1/28/20191/29/20191/29/2019APART
DetailsDave Hannah
Jason Phone #: ###-#### ok to insulate 5 rooms on 2nd floor
BLD-Framing/Rough-in1/23/20191/23/20191/23/2019PPASS
DetailsMike Jordan
Jason Phone #: ###-####. Hold downs, 2nd. floor.
BLD-Framing/Rough-in1/14/20191/15/20191/15/2019APART
DetailsDave Hannah
Jason Phone #: 2###-#### dects ok
BLD-Energy code compliance1/2/20191/3/20191/3/2019APASS
DetailsDave Hannah
Jason Phone #: ###-#### corradors ceilings ok
BLD-Framing/Rough-in12/21/201812/21/201812/21/2018PPART
DetailsDave Hannah
jason Phone #: ###-#### ok to rock lids and top2ft of corradors
BLD-Framing/Rough-in12/13/201812/14/201812/14/2018APART
DetailsDave Hannah
Jason Phone #: ###-#### engineering on trusses for extra insulation dead load is ok 1.8 lbs at highist point ok to rock
BLD-Energy code compliance12/10/201812/11/201812/11/2018APART
DetailsBrandon Shaw
Townhomes - 201, 202, & 203
BLD-Energy code compliance12/4/201812/5/201812/5/2018ANR
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance11/28/201811/28/201811/28/2018PPART
DetailsDave Hannah
Jason Phone #: ###-#### air seal ok on
BLD-Framing/Rough-in11/26/201811/27/201811/27/2018APEND
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Energy code compliance11/21/201811/23/201811/23/2018PCANC
DetailsBrandon Shaw
Jason Phone #: ###-####
BLD-Framing/Rough-in11/21/201811/21/201811/21/2018PNR
DetailsMike Jordan
Jason Phone #: ###-####
BLD-Conference11/13/201811/14/201811/14/2018ADONE
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Framing/Rough-in9/13/20189/13/20189/13/2018PPEND
DetailsDave Hannah
Jason Phone #: ###-####