Information based on query as of Friday, May 10, 2024.
Permit Information
Permit NumberBLD17-04465
StatusFinaled
Name VISSER BUILDING CO
Site Address 503 S ASH ST
Project NameAsh Street Townhomes West Bldg
Customer NumberBLD17-04464 & BLD18-00248
ePlanReview 
Description
(ASH STREET TOWNHOMES - WEST BUILDING) There are three building permits under this Eplan (BLD17-04464, BLD17-04465 and BLD18-00248). // 06/21/19 PLAN MOD TO REVISE WINDOW SCHEDULE TO PROVIDE ONLY CODE REQUIRED EEROS. JAR // Permit to build the West Building, a 19,230 sq ft multi-family R2 apartment building. This project consists of two 3-story, multi-family residential buildings and one single-story detached carport, and related site work. The two multi-family buildings are of Type VB construction and fully sprinklered with an NFPA 13 system for building area increase. Separate fire sprinkler and fire alarm permits are required as regulated by Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/18/20197/18/20197/26/2019 DONE
DetailsDave Hannah
BLD-Final7/17/20197/18/20197/18/2019PPASS
DetailsDave Hannah
Wes Phone #: ###-####
BLD-Final7/16/20197/18/20197/18/2019PPASS
DetailsDave Hannah
Wes Phone #: ###-####
BLD-Aging Inspection7/17/20197/17/20197/17/2019 PEND
DetailsDave Hannah
BLD-Final5/29/20195/30/20195/30/2019APART
DetailsDave Hannah
Call Wes Phone ####-#### ok for tco
FIRE-Final Inspection5/20/20195/21/20195/21/2019APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire exitnguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete.

Wes Phone #: ###-####
BLD-Final5/20/20195/20/20195/21/2019PCANC
DetailsDave Hannah
Wes Phone #: ###-####
BLD-Wall cover1/14/20191/14/20191/15/2019PPASS
DetailsDave Hannah
Wall Cover Inspection in Units #123, 223, 323 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing1/14/20191/14/20191/15/2019PPASS
DetailsDave Hannah
Interior Shear Inspection on Units #123, #223, #323 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance1/14/20191/14/20191/14/2019PCANC
DetailsDave Hannah
Insulation Inspection in Units #123, #223, #323 Phone #: ###-#### >> Inspection requested via web by Hunter Gomez Inspection cancelled from web by: Hunter Gomez
BLD-Energy code compliance12/31/201812/31/20181/2/2019PPASS
DetailsDave Hannah
Insulation inspection in Units #121, 123, 223, 333 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/31/201812/31/20181/2/2019PPASS
DetailsDave Hannah
Wall Cover inspection of unit #121 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in12/26/201812/27/201812/27/2018APASS
DetailsDave Hannah
Framing/Rough in Inspection in Units #121, #123, #223, ; #333. Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Other12/20/201812/21/201812/21/2018APEND
DetailsDave Hannah
Special inspection of Fire resistant paint in areas behind exterior metal staircase assembly Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/20/201812/20/201812/20/2018APASS
DetailsDave Hannah
Final Wall cover inspection in Units #101 ; #201 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in12/20/201812/20/201812/20/2018APASS
DetailsDave Hannah
Units #101 ; #201 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance12/20/201812/20/201812/20/2018APASS
DetailsDave Hannah
Units #101 ; #201 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
Permission to cover inspection on Units # 115, #117, ; #119
BLD-Energy code compliance12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
Interior Insulation inspection on Units # 115, #117, ; #119
BLD-Wall Bracing12/11/201812/11/201812/11/2018PPASS
DetailsBrandon Shaw
Interior Shear inspection on Units # 115, #117, ; #119
BLD-Energy code compliance12/7/201812/7/201812/7/2018PPASS
DetailsDave Hannah
Insulation inspection on units #111 ; #113 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover12/7/201812/7/201812/7/2018PPASS
DetailsDave Hannah
Final Wall Cover inspection on units #111 ; #113 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing12/7/201812/7/201812/7/2018PPASS
DetailsDave Hannah
Interior sheer inspection on units #111 ; #113 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in11/30/201812/3/201812/3/2018APASS
DetailsDave Hannah
Secondary roof truss framing inspection after initial walk through at time of first inspection, and verbal confirmation to proceed with spray foam on Friday (11/30), of roof trusses from Gridline 11 to 3. Early Am if possible. Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing11/29/201811/29/201811/29/2018APASS
DetailsDave Hannah
Interior Shear inspection Units #203, 105, 107, 109. Late AM if possible Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover11/29/201811/29/201811/29/2018APASS
DetailsDave Hannah
Wall cover inspection Units #203, 105, 107, 109. Late AM if possible Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance11/29/201811/29/201811/29/2018APASS
DetailsDave Hannah
Shear wall insulation inspection prior to OSB sheer in units #111, 113,115,117,119 Late AM if possible Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall cover11/27/201811/27/201811/27/2018PCANC
DetailsDave Hannah
Inspection for permission to cover and interior shear inspection on units #105, #107, #109 ; #203 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in11/20/201811/20/201811/20/2018PPASS
DetailsDave Hannah
Framing inspection on Units #101, #201, #111, #113, #115, #117, ; #119 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance11/20/201811/20/201811/20/2018PPASS
DetailsDave Hannah
Insulation inspection in Units #203, #105, #107, #109 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in11/14/201811/15/201811/15/2018APART
DetailsDave Hannah
Framing inspection on West Building Units #105,#107,#109, #203 Phone #: ###-#### Inspection requested via web by Hunter Gomez ok to insulate 4 units
BLD-Wall Bracing11/7/201811/7/201811/7/2018PPASS
DetailsDave Hannah
Final Exterior Shear Inspection, North end of building Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Framing/Rough-in11/2/201811/2/201811/2/2018APART
DetailsDave Hannah
Inspection of the west building 2nd and 3rd floor system throughout Phone #: ###-#### Inspection requested via web by Hunter Gomez floor trusses ok
BLD-Framing/Rough-in10/31/201811/1/201811/1/2018APASS
DetailsDave Hannah
Inspection of roof truss framing from southside moving north to gridline 11 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing10/26/201810/26/201810/26/2018PPASS
DetailsDave Hannah
Roof straps on the northside of west building. Contact Matt of R;L framing to inspect, ###-#### Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing10/24/201810/24/201810/24/2018PPASS
DetailsDave Hannah
Exterior shear inspection on south and east walls Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing10/22/201810/23/201810/23/2018AFAIL
DetailsMike Jordan
Exterior Shear inspection on south and east walls
Phone #: ###-#### Inspection requested via web by Hunter Gomez. east wall, 2nd floor, needs fasteners at 3 inches o.c..
BLD-Wall Bracing10/12/201810/12/201810/12/2018PPART
DetailsBrandon Shaw
West side of building exterior shear
BLD-Wall Bracing9/28/20189/28/20189/28/2018APART
DetailsDave Hannah
Partial interior shear inspection; areas behind bathtubs

Contact: Hunter Gomez Phone #: ###-#### Inspection requested via web by Hunter Gomez ok to cover
BLD-Wall Bracing9/14/20189/14/20189/14/2018APART
DetailsDave Hannah
Exterior Shear inspection of 2nd ; 3rd floor walls soon to be concealed behind masonry pilasters between gridlines 10 and 6 Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing8/17/20188/20/20188/20/2018APART
DetailsDave Hannah
Exterior Shear inspection on 1/2 of 3rd floor exterior walls prior to CMU pilasters being constructed. Will also be inspected by MTI. Early AM if possible/necessary Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Wall Bracing8/6/20188/6/20188/6/2018PPART
DetailsDave Hannah
Exterior Shear inspection for small areas soon to be covered by Masonry PIlasters Phone #: ###-#### Inspection requested via web by Hunter Gomez sw3 walls behind cmu columns ok
BLD-Conference7/10/20187/11/20187/11/2018ADONE
DetailsDave Hannah
Conference on framing inquires and fire barrier situations now that framing has begun in earnest. Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Foundation6/12/20186/12/20186/12/2018PPASS
DetailsDave Hannah
Slab prep and thickened footing rebar Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Energy code compliance6/1/20186/1/20186/1/2018PPASS
DetailsDave Hannah
Foundation Insulation Phone #: ###-#### Inspection requested via web by Hunter Gomez
BLD-Foundation5/29/20185/30/20185/30/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing5/22/20185/22/20185/23/2018PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Ben Sears west side mti will also be on site to do spec inspection
BLD-Conference5/22/20185/22/20185/23/2018PDONE
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Hunter Gomez