Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD17-04653
StatusFinaled
Name RRC CONTRACTORS
Site Address 980 N MILWAUKEE ST
Project NameMagnificent Garden Restaurant
Customer Number 
ePlanReviewYes
Description
(MAGNIFICENT GARDEN – RESTAURANT) (8-2-18 PLAN MODIFICATION TO ADD DETAILS FOR GREASE DUCTS AND GAS LINES TO THE DRAWINGS.) (7-2-18 PLAN MODIFICATION TO PERFORM EXTERIOR CHANGES INCLUDING PAINTING THE EXISTING EXTERIOR STUCCO, PAINTING THE EXISTING WOOD TRIM AND FASCIA, ADDING PAINTED WOOD TRIM, AND ADDING SHOJI SCREENS TO EXISTING WINDOWS PER DRH18-00134. IN ADDITION, A GREASE DUCT WILL BE ROUTED THROUGH AN EXTERIOR WALL INSTEAD OF THROUGH THE ROOF. THE VERTICAL DUCTWORK UP THE SOUTH EXTERIOR WALL WAS APPROVED UNDER CZC18-00062.) The fire sprinkler system is used for fire area. Demolition work includes removing the existing restrooms, some interior shear walls, and interior finishes. To remodel an existing 7,504 square foot restaurant building for a new restaurant tenant. New shear walls will be constructed. Work relating to the shear walls includes concrete footings, wood stud, structural sheathing, drag strut, and hold downs. Special Inspection is required for anchors post-installed in hardened concrete. A new ground supported make-up air unit with new ducting on the roof will provide make-up air for the cooking exhaust systems. Work includes interior nonbearing walls, 2 multi-user toilet rooms accessible to the disabled, a raised sleeper floor system at the restrooms, interior doors, a bar, a reflecting pool water feature, a planter, and finishes. Each table will have its own table top grill system with a downdraft grease hood and duct system. A total of 7 systems are proposed for the dining area (50 hoods total). Each system shall be provided with a fire suppression system. Exhaust fans will be provided on the roof. Horizontal and vertical grease ducts will have a two layer 1-hr fire-resistance-rated duct wrap system installed on the outside of the ducts. Existing grease hoods in the kitchen and their make-up air units will remain and will be reused. Existing roof top HVAC units for space conditioning will remain and be reused. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/10/20197/10/20197/10/2019PPASS
DetailsMike Jordan
ADA hardware has been provided for the barn door. OK for perm occ.
BLD-Final7/10/20197/10/20197/10/2019PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Sferle. OK for temp occ. Still needs to provide ADA hardware for barn door.
BLD-Final7/2/20197/3/20197/3/2019AFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Sferle. Remove exit sign from from exterior door from kitchen. Provide ADA hardware on barn door. Provide the smoke and flame spread data for interior ceiling finish. Correction notice issued.
FIRE-Final Inspection6/26/20196/26/20196/26/2019PPASS
DetailsJim Page
Previously noted items have been corrected. Fire sprinkler inspection is complete, fire alarm inspection is complete, hood suppression system inspection are complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.

Please call before. Thank you David. Phone #: ###-#### Inspection requested via web by David Sferle
FIRE-Final Inspection6/14/20196/14/20196/14/2019PFAIL
DetailsTroy Cobbley
Need the last FIR permit scheduled and finaled, need K class extinguishers as discussed.

Phone #: ###-#### Inspection requested via web by David Sferle
FIRE-Final Inspection6/12/20196/13/20196/13/2019AFAIL
DetailsTroy Cobbley
Need the small documents, need address installed, need the rear exit discharge light repaired

Phone #: ###-#### Inspection requested via web by David Sferle
FIRE-Conference5/28/20195/28/20195/29/2019PDONE
DetailsTroy Cobbley
We discussed general life safety requirements. Small documents are not on site.

Phone #: ###-#### Inspection requested via web by David Sferle
BLD-Conference5/28/20195/28/20195/28/2019PDONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Sferle
BLD-Ceiling Grid Inspection4/15/20194/15/20194/15/2019PPASS
DetailsMike Jordan
Kitchen area needs inspected. Thank you Phone #: ###-#### Inspection requested via web by David Sferle
FIRE-Conference12/27/201812/27/201812/27/2018PDONE
DetailsTroy Cobbley
Don and I discussed combustible concealed spaces formed by the exhaust duct housings and possible solutions.
BLD-Wall cover10/31/201810/31/201810/31/2018PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker. Need smoke and flame spread values for ceiling finish.
BLD-Framing/Rough-in10/31/201810/31/201810/31/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker
BLD-Wall cover8/28/20188/28/20188/28/2018PPART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker. Interior wood framed and steel stud framed walls. Still needs electrical rough in inspections, fiam all top plate penetrations on combustible construction and fill wood columns with insulation. Will reschedule another inspection once electrical rough in inspection has occired.
FIRE-Conference7/12/20187/13/20187/13/2018PDONE
DetailsTroy Cobbley
Conference was for direction on suppression requirements for 46 "woks" that are being installed. Fire suppression systems will be required as per IMC type 1 hood requirements and the manufactures/UL requirements.


Dave Phone #: ###-####
BLD-Framing/Rough-in7/3/20187/3/20187/3/2018PPASS
DetailsMike Jordan
Interior wood shear wall nailing inspection. Phone #: ###-#### Inspection requested via web by Don Walker