BLD-Final | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Mike Jordan
|
|
|
ADA hardware has been provided for the barn door. OK for perm occ.
|
BLD-Final | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Sferle. OK for temp occ. Still needs to provide ADA hardware for barn door.
|
BLD-Final | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Sferle. Remove exit sign from from exterior door from kitchen. Provide ADA hardware on barn door. Provide the smoke and flame spread data for interior ceiling finish. Correction notice issued.
|
FIRE-Final Inspection | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected. Fire sprinkler inspection is complete, fire alarm inspection is complete, hood suppression system inspection are complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.
Please call before. Thank you David. Phone #: ###-#### Inspection requested via web by David Sferle
|
FIRE-Final Inspection | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need the last FIR permit scheduled and finaled, need K class extinguishers as discussed.
Phone #: ###-#### Inspection requested via web by David Sferle
|
FIRE-Final Inspection | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need the small documents, need address installed, need the rear exit discharge light repaired
Phone #: ###-#### Inspection requested via web by David Sferle
|
FIRE-Conference | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | DONE |
Troy Cobbley
|
|
|
We discussed general life safety requirements. Small documents are not on site.
Phone #: ###-#### Inspection requested via web by David Sferle
|
BLD-Conference | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Sferle
|
BLD-Ceiling Grid Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Mike Jordan
|
|
|
Kitchen area needs inspected. Thank you Phone #: ###-#### Inspection requested via web by David Sferle
|
FIRE-Conference | 12/27/2018 | 12/27/2018 | 12/27/2018 | P | DONE |
Troy Cobbley
|
|
|
Don and I discussed combustible concealed spaces formed by the exhaust duct housings and possible solutions.
|
BLD-Wall cover | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker. Need smoke and flame spread values for ceiling finish.
|
BLD-Framing/Rough-in | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker
|
BLD-Wall cover | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker. Interior wood framed and steel stud framed walls. Still needs electrical rough in inspections, fiam all top plate penetrations on combustible construction and fill wood columns with insulation. Will reschedule another inspection once electrical rough in inspection has occired.
|
FIRE-Conference | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | DONE |
Troy Cobbley
|
|
|
Conference was for direction on suppression requirements for 46 "woks" that are being installed. Fire suppression systems will be required as per IMC type 1 hood requirements and the manufactures/UL requirements.
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | PASS |
Mike Jordan
|
|
|
Interior wood shear wall nailing inspection. Phone #: ###-#### Inspection requested via web by Don Walker
|