Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberBLD18-01191
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 12311 W BRADDOCK DR
Project NameSpalding Elementary Gymnasium
Customer Number 
ePlanReviewYes
Description
(SPALDING ELEMENTARY – GYMNASIUM) // 10-2-18 PLAN MOD TO USE SPRAYED APPLIED FIREPROOFING MATERIAL FOR 1-HOUR RATING AT COLUMNS PER G1.01. SPECIAL INSPECTION REQUIRED. JAR // **Permit to construct a new 9,078 square foot addition with gymnasium, 2 classrooms and associated support areas including restrooms, office, storage, and mechanical rooms on the existing Spalding Elementary School campus. Work also includes general site work. Special inspections required per attached Form 310. All work per the approved plans and notations. This building is fully fire sprinklered for area increase and is fully alarmed. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/9/20191/11/20191/11/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Markus Schlegel. OK for perm occ. Fire truck access at 20ft. 8 inches. ok.
FIRE-Final Inspection1/9/20191/11/20191/11/2019PPASS
DetailsTroy Cobbley
Life safety passed. Gate has been modified and fire dept. access has been approved per documentation provided to Boise Fire.

Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Final1/4/20191/7/20191/7/2019ANR
DetailsMike Jordan
Requesting a building final for C of O. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
FIRE-Final Inspection1/4/20191/7/20191/7/2019AFAIL
DetailsJim Page
Fire truck access on southeast side of school is less than 20 feet wide, entrance needs to be 20 feet or larger to be code compliant. New fire hydrant on southeast side is still bagged, need bag removed and hydrant needs ro be put into service.

Requesting a Fire Life Safety re inspection and Fire Final. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Final12/27/201812/28/201812/28/2018PCANC
DetailsBrandon Shaw
PLM18-02745 open...
Fire/Life not approved...
Temporary C of O is OK'd...
FIRE-Final Inspection12/27/201812/28/201812/28/2018AFAIL
DetailsTroy Cobbley
Need two exit signs repaired, one emergency light, need both ends of the fie dept access corrected/approved (gate is not 20' clear, pavement is not 20', and permanant bollards at the south end)

###-#### Inspection requested via web by Markus Schlegel
BLD-Ceiling Grid Inspection12/5/201812/7/201812/7/2018APASS
DetailsMike Jordan
Requesting an inspection on ceiling grid in the hallway 101 ; 102 ; vestibules 100 ; 111. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Ceiling Grid Inspection12/5/201812/5/201812/5/2018PPASS
DetailsMike Jordan
Requesting an inspection for ceiling grid in room 107. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel. PE office ok.
BLD-Ceiling Grid Inspection11/28/201811/29/201811/29/2018PPASS
DetailsMike Jordan
Requesting a ceiling grid inspection in classrooms 103 ; 110. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in11/13/201811/13/201811/13/2018PPASS
DetailsMike Jordan
Requesting a hard lid framing inspection in the boys ; girls rest room. FPME trades overhead rough in inspection complete. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in11/8/201811/9/201811/9/2018ANR
DetailsMike Jordan
Requesting a ceiling framing inspection in the boys ; girls restroom 112 ; 113. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Needs MEP ri inspections first.
BLD-Other11/6/201811/8/201811/8/2018APART
DetailsMike Jordan
Requesting a shear wall inspection on the west and north walls of the gym.
Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Work in progress, ok to cover after special inspection has signed off.
BLD-Other10/29/201810/31/201810/31/2018APASS
DetailsMike Jordan
Requesting a shear wall inspection on the south and east walls of the gym. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Foundation10/29/201810/30/201810/30/2018APASS
DetailsMike Jordan
Requesting a foundation inspection for the trash enclosure. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Footing10/25/201810/26/201810/26/2018APASS
DetailsMike Jordan
Requesting an inspection on the trash enclosure footing in the late morning between 11am ; 12pm. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in10/24/201810/25/201810/25/2018APASS
DetailsMike Jordan
Requesting a framing inspection on rooms north of the gym. Rooms 105, 107, 108, 109 ; 115. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Energy code compliance10/22/201810/23/201810/23/2018APASS
DetailsMike Jordan
Requesting and insulation inspection on the south, east upper west ; upper north gym walls. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Energy code compliance10/17/201810/19/201810/19/2018APASS
DetailsJim Sly
Requesting an inspection insulation on classrooms 103, 110 ; storage 104 Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in10/17/201810/19/201810/19/2018APASS
DetailsJim Sly
Requesting a framing inspection in the boys and girls restrooms 112 ; 113, storage 114, hallway 102 Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in10/18/201810/18/201810/18/2018PPASS
DetailsMike Jordan
Requesting a framing inspection on the perimeter gym walls. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in10/17/201810/22/201810/18/2018ACANC
DetailsMike Jordan
Requesting an inspection on gym exterior perimeter walls. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel Inspection cancelled from web by: Markus Schlegel
BLD-Other10/12/201810/15/201810/15/2018APASS
DetailsMike Jordan
Requesting a roof deck inspection for the gym. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in10/11/201810/11/201810/11/2018PPASS
DetailsMike Jordan
Requesting a framing inspection on classroom 103 ; 110 and storage 104. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Interior steel stud framed walls ok for gym, classrooms and storage room.
BLD-Other10/4/201810/5/201810/5/2018PDEFR
DetailsMike Jordan
Requesting a fire proofing inspection of 5 columns of grid line C. Phone #: ###-#### Inspection requested via web by Markus Schlegel. OK per 3rd party.
BLD-Other10/3/201810/4/201810/4/2018ACANC
DetailsBrandon Shaw
Requestiong a fire proofing inspection on 5 steel columns on gridline C.
Thank you, Phone #: ###-#### >> Inspection requested via web by Markus Schlegel Inspection cancelled from web by: Markus Schlegel
BLD-Framing/Rough-in9/25/20189/26/20189/26/2018PPASS
DetailsMike Jordan
Requesting a shear wall inspection on remaining walls on north and west side of gym at lower level and upper level mechanical well. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Framing/Rough-in9/20/20189/21/20189/21/2018PPASS
DetailsMike Jordan
Requesting and inspection on the Exterior framing in the mechanical well framing ; decking.Gym east side exterior shear wall. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Interior steel stud framed shear walls and ceiling frming. Parapets and two layers of 1/2" type C sheetrock for olumn wraps ok.
BLD-Framing/Rough-in9/11/20189/12/20189/12/2018APASS
DetailsJim Storey
Jeff Phone #: ###-#### west roof deck ok
BLD-Other9/10/20189/11/20189/11/2018PNR
DetailsMike Jordan
roof decking - Jeff Phone #: ###-####
BLD-Wall Bracing9/11/20189/11/20189/11/2018PPASS
DetailsMike Jordan
roof decking - Jeff Phone #: ###-####. West exterior wall is know ok to cover.
BLD-Framing/Rough-in9/7/20189/10/20189/10/2018PCANC
DetailsMike Jordan
Jeff Phone #: ###-####
BLD-Wall Bracing9/10/20189/10/20189/10/2018PPASS
DetailsMike Jordan
Jeff Phone #: ###-####. South exterior wall only ok.
BLD-Framing/Rough-in8/29/20188/31/20188/31/2018APASS
DetailsMike Jordan
Exterior ; partial interior wall framing. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Exterior steel stud framed walls only ok for exterior sheathing.
BLD-Footing8/14/20188/15/20188/15/2018APASS
DetailsMike Jordan
Requesting an inspection for footings with rebar and anchor bolts on Grid C north of major building foundation. Concrete is schedule for 10am. MTI will be onsite to inspect and test as well. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Concrete8/8/20188/8/20188/8/2018PPASS
DetailsMike Jordan
Requesting a slab on grade reinforcing inspection for this afternoon. Concrete placement will be tomorrow 8/9 at 4:30am. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Interior slab on grade and interior thickend footings.
BLD-Footing7/18/20187/19/20187/19/2018APASS
DetailsMike Jordan
Requesting an 8am inspection of (4) piers on grid 3 with rebar and anchor bolts. Concrete placement is at 8am Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD-Other7/16/20187/17/20187/17/2018ACANC
DetailsMike Jordan
Requesting a conference and subsequent inspection on the storm water system and plumbing underground for the inspector assigned to this project. Work will begin 7/17 and will be near complete 7/20. Please advise.
A voice mail message was left with Brian Murphy on 7/13.
Thank you. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel
BLD-Foundation7/13/20187/16/20187/16/2018PPART
DetailsMike Jordan
Requesting a 12-12:30pm foundation inspection with concrete at 1pm. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Perimeter stemwalls, special inspector on site. Placement in progress when on site.
BLD-Foundation7/10/20187/11/20187/11/2018PCANC
DetailsMike Jordan
rebar.. pour at 1 // Andy Phone #: ###-####
BLD-Footing7/11/20187/11/20187/11/2018PPASS
DetailsMike Jordan
rebar.. pour at 1 // Andy Phone #: ###-####. Perimeter footings anf gym interior footing.
BLD-Framing/Rough-in9/28/20189/28/2018 P 
DetailsMike Jordan
Requesting an interior framing inspection. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel