BLD-Final | 1/9/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Markus Schlegel. OK for perm occ. Fire truck access at 20ft. 8 inches. ok.
|
FIRE-Final Inspection | 1/9/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Gate has been modified and fire dept. access has been approved per documentation provided to Boise Fire.
Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Final | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | NR |
Mike Jordan
|
|
|
Requesting a building final for C of O. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
FIRE-Final Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 | A | FAIL |
Jim Page
|
|
|
Fire truck access on southeast side of school is less than 20 feet wide, entrance needs to be 20 feet or larger to be code compliant. New fire hydrant on southeast side is still bagged, need bag removed and hydrant needs ro be put into service.
Requesting a Fire Life Safety re inspection and Fire Final. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | P | CANC |
Brandon Shaw
|
|
|
PLM18-02745 open... Fire/Life not approved... Temporary C of O is OK'd...
|
FIRE-Final Inspection | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need two exit signs repaired, one emergency light, need both ends of the fie dept access corrected/approved (gate is not 20' clear, pavement is not 20', and permanant bollards at the south end)
###-#### Inspection requested via web by Markus Schlegel
|
BLD-Ceiling Grid Inspection | 12/5/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting an inspection on ceiling grid in the hallway 101 ; 102 ; vestibules 100 ; 111. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Ceiling Grid Inspection | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting an inspection for ceiling grid in room 107. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel. PE office ok.
|
BLD-Ceiling Grid Inspection | 11/28/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting a ceiling grid inspection in classrooms 103 ; 110. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting a hard lid framing inspection in the boys ; girls rest room. FPME trades overhead rough in inspection complete. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | NR |
Mike Jordan
|
|
|
Requesting a ceiling framing inspection in the boys ; girls restroom 112 ; 113. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Needs MEP ri inspections first.
|
BLD-Other | 11/6/2018 | 11/8/2018 | 11/8/2018 | A | PART |
Mike Jordan
|
|
|
Requesting a shear wall inspection on the west and north walls of the gym. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Work in progress, ok to cover after special inspection has signed off.
|
BLD-Other | 10/29/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting a shear wall inspection on the south and east walls of the gym. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Foundation | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting a foundation inspection for the trash enclosure. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Footing | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting an inspection on the trash enclosure footing in the late morning between 11am ; 12pm. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting a framing inspection on rooms north of the gym. Rooms 105, 107, 108, 109 ; 115. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Energy code compliance | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting and insulation inspection on the south, east upper west ; upper north gym walls. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Energy code compliance | 10/17/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Jim Sly
|
|
|
Requesting an inspection insulation on classrooms 103, 110 ; storage 104 Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 10/17/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Jim Sly
|
|
|
Requesting a framing inspection in the boys and girls restrooms 112 ; 113, storage 114, hallway 102 Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting a framing inspection on the perimeter gym walls. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 10/17/2018 | 10/22/2018 | 10/18/2018 | A | CANC |
Mike Jordan
|
|
|
Requesting an inspection on gym exterior perimeter walls. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel Inspection cancelled from web by: Markus Schlegel
|
BLD-Other | 10/12/2018 | 10/15/2018 | 10/15/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting a roof deck inspection for the gym. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting a framing inspection on classroom 103 ; 110 and storage 104. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Interior steel stud framed walls ok for gym, classrooms and storage room.
|
BLD-Other | 10/4/2018 | 10/5/2018 | 10/5/2018 | P | DEFR |
Mike Jordan
|
|
|
Requesting a fire proofing inspection of 5 columns of grid line C. Phone #: ###-#### Inspection requested via web by Markus Schlegel. OK per 3rd party.
|
BLD-Other | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | CANC |
Brandon Shaw
|
|
|
Requestiong a fire proofing inspection on 5 steel columns on gridline C. Thank you, Phone #: ###-#### >> Inspection requested via web by Markus Schlegel Inspection cancelled from web by: Markus Schlegel
|
BLD-Framing/Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting a shear wall inspection on remaining walls on north and west side of gym at lower level and upper level mechanical well. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Framing/Rough-in | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting and inspection on the Exterior framing in the mechanical well framing ; decking.Gym east side exterior shear wall. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Interior steel stud framed shear walls and ceiling frming. Parapets and two layers of 1/2" type C sheetrock for olumn wraps ok.
|
BLD-Framing/Rough-in | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Jim Storey
|
|
|
Jeff Phone #: ###-#### west roof deck ok
|
BLD-Other | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | NR |
Mike Jordan
|
|
|
roof decking - Jeff Phone #: ###-####
|
BLD-Wall Bracing | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Mike Jordan
|
|
|
roof decking - Jeff Phone #: ###-####. West exterior wall is know ok to cover.
|
BLD-Framing/Rough-in | 9/7/2018 | 9/10/2018 | 9/10/2018 | P | CANC |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
BLD-Wall Bracing | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. South exterior wall only ok.
|
BLD-Framing/Rough-in | 8/29/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Mike Jordan
|
|
|
Exterior ; partial interior wall framing. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Exterior steel stud framed walls only ok for exterior sheathing.
|
BLD-Footing | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting an inspection for footings with rebar and anchor bolts on Grid C north of major building foundation. Concrete is schedule for 10am. MTI will be onsite to inspect and test as well. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Concrete | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Mike Jordan
|
|
|
Requesting a slab on grade reinforcing inspection for this afternoon. Concrete placement will be tomorrow 8/9 at 4:30am. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Interior slab on grade and interior thickend footings.
|
BLD-Footing | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Mike Jordan
|
|
|
Requesting an 8am inspection of (4) piers on grid 3 with rebar and anchor bolts. Concrete placement is at 8am Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD-Other | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | CANC |
Mike Jordan
|
|
|
Requesting a conference and subsequent inspection on the storm water system and plumbing underground for the inspector assigned to this project. Work will begin 7/17 and will be near complete 7/20. Please advise. A voice mail message was left with Brian Murphy on 7/13. Thank you. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel
|
BLD-Foundation | 7/13/2018 | 7/16/2018 | 7/16/2018 | P | PART |
Mike Jordan
|
|
|
Requesting a 12-12:30pm foundation inspection with concrete at 1pm. Phone #: ###-#### Inspection requested via web by Markus Schlegel. Perimeter stemwalls, special inspector on site. Placement in progress when on site.
|
BLD-Foundation | 7/10/2018 | 7/11/2018 | 7/11/2018 | P | CANC |
Mike Jordan
|
|
|
rebar.. pour at 1 // Andy Phone #: ###-####
|
BLD-Footing | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Mike Jordan
|
|
|
rebar.. pour at 1 // Andy Phone #: ###-####. Perimeter footings anf gym interior footing.
|
BLD-Framing/Rough-in | 9/28/2018 | 9/28/2018 | | P | |
Mike Jordan
|
|
|
Requesting an interior framing inspection. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel
|