Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberBLD18-03121
StatusFinaled
Name BILTMORE COMPANY
Site Address 11783 W KING ST
Project NameFairview Apartments - Bldg 2
Customer Number 
ePlanReviewYes
Description
(FAIRVIEW APARTMENTS) (BLDG 2) (DRH17-00532) (GRD18-00035) Permit for the construction of Building 2, a 27,059 sq ft, 3-story, 24-unit apartment building. This building is one of six buildings within a multi-family development, which includes (3) three-story, 24-unit multi-family buildings and (3) two-story, 8-unit buildings for a total of 96 units on the site. Work to include general site work and the construction of the new building per the approved plans. Special Inspections required per attached Form 310. All buildings are to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/201910/16/201910/16/2019PPASS
DetailsTell Riley
PAT Phone #: ###-####//all trades finals complete//signatures required complete//final complete//
BLD-Final10/14/201910/15/201910/15/2019PCANC
DetailsTell Riley
Pat Phone #: ###-####
BLD-Footing10/8/201910/9/201910/9/2019ACANC
DetailsTell Riley
Matt Phone #: ###-####
BLD-Final10/8/201910/8/201910/8/2019PPASS
DetailsTell Riley
Matt Phone #: ###-####//last six units complete//temp occupancy approved for entire building//final can be complete once all signatures are complete//
FIRE-Final Inspection10/7/201910/8/201910/8/2019APASS
DetailsTroy Cobbley
life safety passed

Matt Phone #: ###-####
BLD-Final10/2/201910/2/201910/2/2019PCANC
DetailsTell Riley
Matt Phone #: ###-####//cancel per Matt//
FIRE-Final Inspection10/2/201910/2/201910/2/2019PFAIL
DetailsTroy Cobbley
Apartment 201 needs the ceiling patched in several locations and the smoke alarm re-mounted. Apartment 301 sprinkler pendant is missing canopy.

Matt Phone #: ###-####
BLD-Final9/30/201910/1/201910/1/2019PPART
DetailsTell Riley
Matt Phone #: ###-####//103,104,203,204,303,304/// finals complete on these units//
FIRE-Final Inspection9/30/201910/1/201910/1/2019APART
DetailsTroy Cobbley
Life safety complete for apartments 103, 104, 203, 204, 303 and 304. Matt Phone #: ###-####
BLD-Final9/25/20199/26/20199/26/2019PCANC
DetailsTell Riley
Matt Phone #: ###-#### cancel per matt
FIRE-Final Inspection9/25/20199/26/20199/26/2019ACANC
DetailsTroy Cobbley
Matt Phone #: ###-#### cancel per matt
BLD-Final9/23/20199/24/20199/24/2019APART
DetailsTell Riley
Matt Phone #: ###-####//units 105,106,205,206,305,306 are ok to occupy when door springs have been adjusted//
FIRE-Final Inspection9/23/20199/23/20199/23/2019PCANC
DetailsTroy Cobbley
The rooms needing inspection have been looked at by me last week. Matt Phone #: ###-####
FIRE-Final Inspection9/19/20199/19/20199/19/2019PPART
DetailsTroy Cobbley
Life safety passed for apartments 105, 106, 205, 206, 305, 306. Matt Phone #: ###-####
BLD-Final9/16/20199/17/20199/17/2019APART
DetailsTell Riley
Pat-1st 6 units Phone #: ###-####//north 6 units//final complete pending fire//
FIRE-Final Inspection9/5/20199/5/20199/5/2019PPART
DetailsTroy Cobbley
The six apartments, 1st through 3rd floors at the very north end of this building have the life safety passed. The FDC needs the required clearance as discussed prior to a final inspection. Matt Phone #: ###-####
FIRE-Final Inspection9/3/20199/4/20199/4/2019ACANC
DetailsTroy Cobbley
Life safety will be a pass for the north most apartments when the project related fire alarm and fire sprinkler permits are passed. Matt- mid mornign Phone #: ###-####
BLD-Energy code compliance7/29/20197/30/20197/30/2019PPASS
DetailsTell Riley
Matt Phone #: ###-####//ok to cover units101,102,201,202,301,302, all units passed//
BLD-Framing/Rough-in7/25/20197/26/20197/26/2019APASS
DetailsTell Riley
Matt Phone #: ###-####//framinng corrections onsite//ok to insulate only// 101,102,201,202,301,303//
BLD-Energy code compliance7/19/20197/22/20197/22/2019APASS
DetailsTell Riley
Matt Phone #: ###-####//corrections made//103,104, 203, 204, 303, 304// ok to cover//
BLD-Energy code compliance7/19/20197/19/20197/19/2019PNR
DetailsTell Riley
Matt Phone #: ###-####//add vapor barrier at bottom on first two floors//fix tenting 3rd floor//fix broken stud first floor//re inspect monday//103/104/203/204/303/304
BLD-Framing/Rough-in7/18/20197/18/20197/18/2019PPART
DetailsTell Riley
Matt Phone #: ###-####//framing corrections made//call for insulation on 103,104,203,204,303,304//
BLD-Framing/Rough-in7/16/20197/16/20197/16/2019PPART
DetailsTell Riley
Bill Phone #: ###-####//see corrections onsite// ok to insulate--keep areas that need changes open//call for 7/17 pm inspection//103,104,203,204, 303, 304
BLD-Framing/Rough-in7/11/20197/12/20197/12/2019APASS
DetailsTell Riley
Matt Phone #: ###-####//corrections made//rough-ins passed//105,106,205,206,305,306//
BLD-Framing/Rough-in7/10/20197/10/20197/10/2019PCANC
DetailsTell Riley
Matt Phone #: ###-####
BLD-Framing/Rough-in7/2/20197/2/20197/2/2019PNR
DetailsTell Riley
Matt Phone #: ###-####//hold downs need to be 18" max per manufacturer//clear up issues with interior wall hold downs//let me know......////
BLD-Energy code compliance6/28/20196/28/20196/28/2019PNR
DetailsTell Riley
Bill Phone #: ###-####//not ready//
BLD-Other6/26/20196/27/20196/27/2019ACANC
DetailsTell Riley
follow up on hold down installation....
BLD-Other6/26/20196/26/20196/26/2019ACANC
DetailsTell Riley
follow up on hold down installation........
BLD-Framing/Rough-in6/26/20196/26/20196/26/2019PPART
DetailsTell Riley
Bill Phone #: ###-####//framing corrections made//waiting for hold down extensions//will schedule follow up mid am 6/27//install trimmers on header second floor//ok to insulate top down//units 5's and 6's
BLD-Framing/Rough-in6/25/20196/25/20196/25/2019PFAIL
DetailsTell Riley
bill Phone #: ###-####//see corrections list onsite with Bill//call for re-inspection//
BLD-Energy code compliance6/19/20196/20/20196/20/2019APASS
DetailsMike Jordan
Bill- please late morning Phone #: ###-####. framing issues corrected.
BLD-Framing/Rough-in6/18/20196/18/20196/18/2019PPART
DetailsTell Riley
bill Phone #: ###-####//install H2.5 on trusses//nail all truss hangers//add nuts to HDU's//caulk penetrations as discussed//ok to insulate only//
BLD-Wall Bracing5/10/20195/10/20195/10/2019PPART
DetailsJim Sly
Bill Phone #: ###-####
Exterior straps and nailing only.....OK..
BLD-Foundation3/4/20193/5/20193/5/2019APASS
DetailsJim Sly
Please go late morn and call Dean Phone #: ###-####
BLD-Foundation3/1/20193/4/20193/5/2019PPASS
DetailsJim Sly
DAne Phone #: ###-####
BLD-Foundation2/28/20193/1/20193/1/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing2/25/20192/26/20192/26/2019PPART
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing2/20/20192/21/20192/22/2019PCANC
DetailsJim Sly
Dane Phone #: ###-####
BLD-Footing2/19/20192/20/20192/20/2019PPASS
DetailsBrandon Shaw
Remove snow and/or ice before pouring...
Frost protection is required...
BLD-Footing2/19/20192/19/20192/19/2019PPART
DetailsJim Sly
Dane Phone #: ###-####