Description
(SIMPLE SUITES – NEW BUILDING) (DRH18-00305) (2-25-20 PLAN MODIFICATION TO RELOCATE THE GAS METER AND PIPING TO THE END OF THE BUILDING, ALTER THE WATER PIPE INSULATION AND HANGERS, AND TO RECONFIGURE THE GYPSUM BOARD MEMBRANE OF THE 1-HR FIRE-RESISTANCE-RATED FLOOR-CEILING ASSEMBLY BETWEEN THE 1ST STORY AND THE 2ND STORY ABOVE THE 1ST STORY SINGLE-USER TOILET ROOMS SO THAT THE REQUIRED EXHAUST DUCT OPENING PROTECTION CAN BE RELOCATED TO THE CEILING OF THE DROPPED CEILING. THE GAS LINE IS NOT ALLOWED TO PASS THROUGH THE 2-HR STAIRWAY ENCLOSURE. A 2-HR SHAFT WILL BE CONSTRUCTED AROUND THE GAS PIPE TO ISOLATE IT FROM THE STAIRWAY ENCLOSURE.) The fire sprinkler system is used for building area increase, for occupancy, and for code trade-offs. To construct a new 4 story wood framed hotel building having a total floor area of about of about 36,640 square feet (9,490 square feet 1st story, 9,050 square feet 2nd story, 9,050 square feet 3rd story, and 9,050 square feet 4th story) with 67 hotel sleeping units with 4 of those units accessible to the disabled (1 with an accessible roll-in type shower and 3 with accessible bathtubs). Work is to include concrete continuous footings, concrete spot footings, concrete spot footings with concrete piers for the steel canopy, concrete stem walls, concrete slab on grade with thickened areas for bearing and shear walls, steel columns with steel baseplates, wood stud bearing walls, wood stud shear walls with hold downs, steel beams, wood beams, floors constructed of TJI joists and wood floor sheathing, 1” gypcrete floor topping, flat wood roof trusses (design is a deferred submittal item) with wood roof sheathing, roof parapet braces, steel joists and a steel deck for the canopy, 2-hr stairway enclosures, 2-hr elevator shaft with a concrete pit, 24” diameter laundry chute within a 2-hr shaft with 90 minute automatic-closing access doors, 2-hr laundry chute termination room, 1-hr laundry chute access rooms with 45 minute doors, 1-hr corridors, exterior fixed windows, exterior doors, interior doors, steel exterior awnings with steel support rods, exterior wall fur-outs, EIFS, fiber cement siding, stacked stone veneer with precast concrete caps, exterior concrete steps with handrails to access the fire riser room and equipment rooms, millwork, and interior finishes. A trash enclosure with 8’- 8” masonry walls and steel gates will also be constructed. Special Inspection is required for soils, for concrete, for steel (including welding and bolting), for post-installed anchors in hardened concrete, for EIFS, and for intumescent fire-resistant coatings. Each hotel sleeping room will be served by its own PTAC unit and exhaust fan with a dedicated exhaust duct. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Class I standpipes are required. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/26/20203/27/20203/27/2020APASS
DetailsJim Storey
josh Phone #: ###-####
FIRE-Final Inspection3/26/20203/27/20203/27/2020APASS
DetailsTroy Cobbley
Life safety passed. Boise Fire is ok with emergency radio.

josh Phone #: ###-####
FIRE-Final Inspection3/26/20203/26/20203/26/2020PFAIL
DetailsTroy Cobbley
Repair east end exit discharge light, tidy up the wiring and install ceiling on both the 3rd and 4th floors, provide verification from the fire dept that the emergency radio coverage is acceptable, provide signage on the fire doors

josh Phone #: ###-####
BLD-Final3/19/20203/20/20203/20/2020APART
DetailsJim Storey
Robbie Phone #: ###-#### temp occ ok
BLD-Ceiling Grid Inspection3/10/20203/11/20203/11/2020APASS
DetailsJim Storey
Robbie Phone #: ###-####
BLD-Ceiling Grid Inspection3/6/20203/9/20203/9/2020APASS
DetailsJim Storey
Robbie Phone #: ###-#### lobby and 2nd floor ok
BLD-Framing/Rough-in2/19/20202/20/20202/20/2020PPASS
DetailsJim Storey
late if possible - Robbie Phone #: ###-#### 1st floor ok
BLD-Framing/Rough-in2/18/20202/19/20202/19/2020APASS
DetailsJim Storey
Robbie Phone #: ###-#### rooms ceillings 1 st floor ok to cover.
BLD-Framing/Rough-in1/2/20201/3/20201/3/2020APART
DetailsJim Storey
Robbie Phone #: ###-#### east 1st floor ceillings abs and ele conduit collors and firestopping/
BLD-Framing/Rough-in12/6/201912/9/201912/9/2019APASS
DetailsJim Storey
Robbie Phone #: ###-#### shaft and elavtor ok
BLD-Framing/Rough-in12/3/201912/4/201912/4/2019ACANC
DetailsJim Storey
elevator shaft // Robbie Phone #: ###-####
BLD-Framing/Rough-in12/3/201912/3/201912/3/2019PCANC
DetailsJim Storey
Robbie Phone #: ###-####
BLD-Framing/Rough-in12/2/201912/3/201912/3/2019ADEFR
DetailsJim Storey
Robbie Phone #: ###-####
BLD-Framing/Rough-in11/14/201911/15/201911/15/2019PPASS
DetailsJim Storey
Josh Phone #: ###-#### 1st floor rms
BLD-Framing/Rough-in11/12/201911/13/201911/13/2019APASS
DetailsJim Storey
Josh Phone #: ###-#### c/n idems all complet ok to cover 3rd all of 4 th/ pending storage rms 1st 2nd and third.
BLD-Framing/Rough-in11/8/201911/12/201911/12/2019APART
DetailsJim Storey
josh Phone #: ###-#### shaft 4th floor ok to cover rm side// 2nd floor ok all but 3 inch hvac pvc collors required.
BLD-Framing/Rough-in11/6/201911/7/201911/7/2019APASS
DetailsJim Storey
Josh Phone #: ###-####//east 2nd floor/west 3rd floor ok to cover.
BLD-Energy code compliance11/6/201911/7/201911/7/2019APASS
DetailsJim Storey
Josh Phone #: ###-#### east 2nd floor/west 3rd floor ok to cover.
BLD-Energy code compliance11/4/201911/5/201911/5/2019PPASS
DetailsJim Storey
Josh Phone #: ###-#### 3thjird pass
BLD-Framing/Rough-in11/1/201911/4/201911/4/2019APASS
DetailsJim Storey
Josh Phone #: ###-#### east 3dr ok
BLD-Wall cover11/1/201911/4/201911/4/2019APASS
DetailsJim Storey
rc channel // Josh Phone #: ###-#### all of 4th floor and east of shaft on third ok to cover
BLD-Energy code compliance11/1/201911/4/201911/4/2019APASS
DetailsJim Storey
Josh Phone #: ###-#### all of 4th floor and east of shaft on third ok to cover
BLD-Energy code compliance10/30/201910/31/201910/31/2019APASS
DetailsJim Storey
Robbie Phone #: ###-#### east of shaft 4th floor ok
BLD-Energy code compliance10/24/201910/25/201910/25/2019APART
DetailsJim Storey
Robbie Phone #: ###-#### 3rd floor exrerior walls ok to cover to rm short of elavator.
BLD-Framing/Rough-in10/22/201910/23/201910/23/2019APASS
DetailsJim Storey
Robie- 3rd 4th floor east side bulding Phone #: ###-#### mlb support.
BLD-Energy code compliance10/22/201910/23/201910/23/2019APART
DetailsJim Storey
Robie Phone #: ###-#### east end exterior walls and unit walls ok to insulate 4th and 3 rd floors// hold at 2 hr elavator and lundry shaft need to rock and firestop to roof deck/hangers firestoped membrane continuity.
BLD-Wall cover10/17/201910/18/201910/18/2019APART
DetailsJim Storey
Robbie Phone #: ###-#### ok to insulate exterior and coridors// remove ceilling at elavator and lundry shaft/ plm void ceilling drain line/ check for collor spacing/ remove ceilling at water closet east cordor closet.
BLD-Framing/Rough-in10/7/201910/7/201910/7/2019PPASS
DetailsJim Storey
stair well.. r-c channel // Robbie Phone #: ###-#### // stairwells pending fire spk ok to cover// front canopy ok to cover// rc ceilling common area 1st floor ok to cover.
BLD-Framing/Rough-in10/2/201910/3/201910/3/2019PPART
DetailsJim Storey
Robbie Phone #: ###-#### 1st floor common area ok to start ceillings and walls pending reinsp. 2hr shafts elavator and lurndry chase // plm water closet fire stop/ hvac ducts at ceilling/ pending fire stopping applacation listting.
BLD-Conference9/25/20199/26/20199/26/2019PDONE
DetailsMike Jordan
Discuss plumbing penetrations in fire rated walls. if possible could we request a time window to have plumber on site. Phone #: ###-#### Inspection requested via web by Robbie Andrews. OK to insulate 2nd floor at common area only. Provide listings for 3m fire foam for use on pex.
BLD-Energy code compliance8/19/20198/20/20198/20/2019APASS
DetailsMike Jordan
ROBBIE Phone #: ###-####. Insulation at elevator shaft. Ok to start sheet rock on interior side.
BLD-Energy code compliance8/7/20198/8/20198/8/2019APART
DetailsJim Storey
Robby Phone #: ###-#### roof deck exterior foam ok/ spray foam and r 19 glass pending interior/ hat track in corridors all floors ok to rock// pending steel fire protection.
BLD-Other8/1/20198/2/20198/2/2019APASS
DetailsJim Storey
Roof Framing // Robbie Andrews Phone #: ###-#### nailling ok/ truss bracing ok.
BLD-Framing/Rough-in7/29/20197/29/20197/30/2019PPART
DetailsDave Hannah
ext sheeting and elevator shaft // Robbie Phone #: ###-#### ext shear nailing and fl/fl straping ok to cover also ok to rock elev shaft after addind strapes at plate lines were steel tubes go though plates
BLD-Wall cover6/25/20196/26/20196/26/2019APART
DetailsJim Storey
Rob Phone #: ###-#### west 1st floor 2 hr wall ok to place aganst sheer wall.gyp screws ok
BLD-Concrete5/15/20195/16/20195/16/2019APASS
DetailsJim Storey
rebar- Josh Phone #: ###-#### vapor barrior and rebar ok/pending si report
BLD-Foundation4/10/20194/11/20194/11/2019APASS
DetailsJim Storey
rebar and stem wall- Josh Phone #: ###-####
BLD-Footing4/3/20194/4/20194/4/2019PPART
DetailsJim Storey
Josh Phone #: ###-#### wip rebar ok/ si pending si contract needed/ grin g/ 1 thur 12/a