BLD-Final | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. All issues resolved. Ok for perm occ.
|
BLD-Final | 1/23/2020 | 1/23/2020 | 1/23/2020 | P | PART |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Ok for temp occ.
|
BLD-Final | 1/21/2020 | 1/22/2020 | 1/22/2020 | P | PEND |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Needs to provide panic hardware on egress doors from mech/elec room. Outstanding plumbing permit as well.
|
FIRE-Final Inspection | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Building inspector is going to follow up on door hardware.
Tom Phone #: ###-####
|
BLD-Conference | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | DONE |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Noted issues with approved city plans on site, they do not appear to be the most current set with addtional redlines on sheets A1.0 and A6.0. Noted door hardware issues from mech room area for egress. Egress doors to have panic hardware. Doors from the mech. room to the wash tunnel need to have the sticker placed stating these doors to remain unlocked while building is occupied.
|
BLD-Ceiling Grid Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Mike Jordan
|
|
|
TOM Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### ok to cover exteroior wall framing.
|
BLD-Wall Bracing | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### furred out ext wall south side east end ok to cover restroom and office ok to cover dog houses bocking and rat runs in ok to cover ext
|
BLD-Other | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Mike Jordan
|
|
|
TOM- ROOFING NAILING Phone #: ###-####
|
FIRE-Conference | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | DONE |
Troy Cobbley
|
|
|
We discussed the placement of the building address. Knox key box is not required. Tom Phone #: ###-####
|
BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | DEFR |
Mike Jordan
|
|
|
grout pour at 1:30 // Tom Phone #: ###-####
|
BLD-Other | 9/13/2019 | 9/16/2019 | 9/16/2019 | P | DEFR |
Mike Jordan
|
|
|
pour is at 2pm // grout insp.// Tom Phone #: ###-####. Special inspector on site.
|
BLD-Other | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | DEFR |
Mike Jordan
|
|
|
grout pour at 12- Tom Phone #: ###-####
|
BLD-Other | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | DEFR |
Mike Jordan
|
|
|
Tom-grout pour-pour time 2:00 Phone #: ###-####
|
BLD-Other | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | DEFR |
Mike Jordan
|
|
|
grout at 2pm // Tom Phone #: ###-####
|
BLD-Other | 9/3/2019 | 9/4/2019 | 9/5/2019 | P | DEFR |
Mike Jordan
|
|
|
grout pour at 2 pm // Tom Phone #: ###-####
|
BLD-Other | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Mike Jordan
|
|
|
grout // Tom Phone #: ###-####. Work in progress. Will grout south east portion.
|
BLD-Other | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | DEFR |
Mike Jordan
|
|
|
Tom- massonary wall Phone #: ###-####. Ok to grout pending special inspection approval.
|
BLD-Other | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PART |
Mike Jordan
|
|
|
masonary - Tom Phone #: ###-####.Work in progress Top of foundation to 4ft. elevation. South wall and north interior wall. Ok to grout walls pending special inspection approval.
|
BLD-Foundation | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PART |
Mike Jordan
|
|
|
Thomas Phone #: ###-####. Conveyor trench walls, work in progress. Will have special inspection.
|
BLD-Foundation | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. South exterior stemwall, conveyor pit floor.
|
BLD-Foundation | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Mike Jordan
|
|
|
wall // Tom Phone #: ###-####. Stemwalls on grids a and b.
|
BLD-Footing | 7/10/2019 | 7/11/2019 | 7/11/2019 | P | PASS |
Mike Jordan
|
|
|
Tom- Phone #: ###-####. Exterior perimeter footings adn interior footings.
|