Information based on query as of Wednesday, May 8, 2024.
Permit Information
Permit NumberBLD19-02007
StatusFinaled
Name CARL FUNK CONSTRUCTION
Site Address 1439 N PINEVIEW LN
Project NameEncore Townhouses
Customer NumberBLD19-02010
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** (TWO PERMITS FILED UNDER BLD19-02007) Permit for the construction of a new 1513 sq. ft., 2 story (first story 674 sq. ft., second story 839 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, 56 sq. ft. covered patio/porch and a 400 sq. ft. attached garage per the approved plans and any notations. C-1D zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/28/20203/2/20203/2/2020APASS
DetailsMike Jordan
JIm Phone #: ###-####
DOC - Permit Finaled3/2/20203/2/20203/2/2020PPASS
DetailsMike Jordan
BLD-Blower Door Test Results3/2/20203/2/20203/2/2020ADONE
DetailsMike Jordan
4.7
BLD-Final2/24/20202/25/20202/25/2020AFAIL
DetailsMike Jordan
Carl Phone #: ###-####. Complete fire cauliking in garage and provide blower door test results.
BLD-Framing/Rough-in11/6/201911/7/201911/7/2019APASS
DetailsMike Jordan
sheet rock framing // Jim Phone #: ###-####
BLD-Framing/Rough-in10/24/201910/25/201910/25/2019APASS
DetailsMike Jordan
jim Phone #: ###-####
BLD-Energy code compliance10/25/201910/25/201910/25/2019APASS
DetailsMike Jordan
jim Phone #: ###-####
BLD-Wall cover10/24/201910/24/201910/24/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Framing/Rough-in10/24/201910/24/201910/24/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Carl Funk
BLD-Framing/Rough-in10/21/201910/21/201910/21/2019PFAIL
DetailsMike Jordan
Complete lateral bracing on A3 trusses. Complete fireblocking on furdowns. Nail off all simpson hangars and provide fixes for trusses at entry way. Ok to insulate.
BLD-Framing/Rough-in10/18/201910/21/201910/21/2019ACANC
DetailsMike Jordan
JIM Phone #: ###-####. Moved to pm inspection.
BLD-Framing/Rough-in10/15/201910/15/201910/15/2019PFAIL
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Conference9/30/20199/30/20199/30/2019PDONE
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Wall Bracing9/30/20199/30/20199/30/2019PPASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Wall Bracing9/27/20199/27/20199/27/2019AFAIL
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Carl Funk//need to address nailing and blocking at portal frames//sthds in wrong locations//windows added in shear location at front entry//2 hr wall contruction does not match plans//
BLD-Wall Bracing9/17/20199/18/20199/18/2019AFAIL
DetailsMike Jordan
Carl Phone #: ###-####. Needs to provide a full set of approved plans. Notes say there should be a total of eight pages of construction docs. Omly seven are provided. Wall bracing plans are incomplete, missing schedules. Also noted that 2hr. wall is not continous or constructed per plans.
BLD-Foundation8/16/20198/16/20198/16/2019PPASS
DetailsMike Jordan
stem wall // Willie Phone #: ###-####
BLD-Footing8/9/20198/12/20198/12/2019APASS
DetailsMike Jordan
Sergio Phone #: ###-####
BLD-Footing8/8/20198/9/20198/9/2019AFAIL
DetailsMike Jordan
Sergio Phone #: ###-####. Approved plans shows duplex 1hr. wall seoeration, per scope of work, townhouses are being constructed, which require a 2hr. seperation. Plans to be resubmitted.
BLD-Footing8/8/20198/8/20198/8/2019PFAIL
DetailsMike Jordan
surgeo Phone #: ###-####. No city approved plans on site.