Final | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Chambers Ok final. This is NOT a green building, verified with onsite lead electrician
|
Final | 5/13/2020 | 5/14/2020 | 5/14/2020 | P | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### >> Inspection requested via web by Andy Chambers Inspection cancelled from web by: Andy Chambers
|
Final | 5/12/2020 | 5/13/2020 | 5/13/2020 | P | PART |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Chambers Ok partial final for gym and cafeteria
|
Final | 5/6/2020 | 5/7/2020 | 5/7/2020 | P | PART |
Mark Moncarr
|
|
|
Partial Final Phone #: ###-#### Inspection requested via web by Andy Chambers Partial for area 2B and kitchen.
|
Final | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | PART |
Mark Moncarr
|
|
|
Partial final Phone #: ###-#### Inspection requested via web by Andy Chambers Partial final for area 1B.
|
Final | 4/6/2020 | 4/7/2020 | 4/7/2020 | P | PART |
Mark Moncarr
|
|
|
Partial final Phone #: ###-#### Inspection requested via web by Andy Chambers 2A classrooms.
|
Electrical Rough-In | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | PASS |
Mark Moncarr
|
|
|
jay Phone #: ###-#### Ok cover ceilings in music room, storage, and library.
|
Final | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Mark Moncarr
|
|
|
partial final - Andy Phone #: ###-#### Area A classrooms and 2 bathrooms.
|
Electrical Rough-In | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Mark Moncarr
|
|
|
andy Phone #: ###-#### Ok cover 2nd floor ceiling by elevator.
|
Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover ceiling in kitchen
|
Electrical Rough-In | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PASS |
Mark Moncarr
|
|
|
andy Phone #: ###-#### Ok cover 1st floor corridor celings
|
Electrical Rough-In | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover remainder of office ceilings in admin, conference room, and exterior soffit N side off kitchen.
|
Electrical Rough-In | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover office ceilings in admin area
|
Electrical Rough-In | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover hardlid in vestibule 1st floor W entrance.
|
Electrical Rough-In | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover 1st floor hardlid up high by N stairwell.
|
Electrical Rough-In | 2/19/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover storage rooms hardlids 1st floor, 2 classroom ceilings, and 2 classroom ceilings 2nd floor.
|
Electrical Rough-In | 2/13/2020 | 2/14/2020 | 2/14/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover hardlid outside 2nd floor N bathrooms, classroom 2nd floor and center of cafeteria ceiling.
|
Electrical Rough-In | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover library hardlid and adjacent 2 areas in hallway outside library, 1 classroom up and 1 classrooms down for ceilings.
|
Electrical Rough-In | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover ceilings 4 classrooms 2nd floor, flex room, and vestibule N side.
|
Electrical Rough-In | 1/29/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover hardlids 2 baths main level, and hardlid outside baths
|
Rough-In Permanent Service | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### No service. Ok cover main floor corridor hardlids S side, 2nd floor classroom ceiling and kitchen walls.
|
Electrical Rough-In | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover 2 classroom ceilings main floor, library walls, music room and storage.
|
Electrical Rough-In | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover ceiling Rm 115. ESI asked to tile borders. Ok to cover borders above windows in classrooms if NO work being done in those areas.
|
Permanent Service | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### p/s u/g n ok
|
Electrical Rough-In | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover 1st floor ceiling flex room, and 2nd floor ceilings hall and 2 bathrooms
|
Electrical Rough-In | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover classroom 2nd flr, SW corner.
|
Electrical Rough-In | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover Flex ceiling off entry, and 2 bathrooms.
|
Electrical Rough-In | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | PASS |
Mark Moncarr
|
|
|
andy Phone #: ###-#### Ok cover 2nd floor classroom, pantry, office and bathrooms.
|
Electrical Rough-In | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover 2 classrooms and bathrooms main level, and classroom 2nd floor.
|
Electrical Rough-In | 11/29/2019 | 12/2/2019 | 12/2/2019 | A | PASS |
Mark Moncarr
|
|
|
underground // Andy Phone #: ###-#### Ok cover grd work from IDP trans to building on NE corner.
|
Electrical Rough-In | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover admin offices on S side of building.
|
Electrical Rough-In | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover main level classroom walls S side, 2nd floor classroom walls E side.
|
Electrical Rough-In | 10/7/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Mark Moncarr
|
|
|
Andy Chambers Phone #: ###-#### Ok cover 3 classrooms N side, 2 bathrooms, fire riser, elec room.
|
Final | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Mark Moncarr
|
|
|
Andy ###-#### Ok cover conduit for storage, elec and risers rooms on N side of building
|
Electrical Rough-In | 9/10/2019 | 9/11/2019 | 9/11/2019 | P | CANC |
Mark Moncarr
|
|
|
Andy Phone #: ###-####
|
Electrical Rough-In | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Mark Moncarr
|
|
|
Andy-underground Phone #: ###-#### Ok cover conduit in gym with 2 floor boxes.
|
Electrical Rough-In | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Mark Moncarr
|
|
|
Andy-Underground Phone #: ###-#### Ok cover grd work Area C for kitchen.
|
Electrical Rough-In | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Mark Moncarr
|
|
|
underground // Andy Phone #: ###-#### Ok cover conduit for Area C electrical room. Talked to onsite electrical foreman Andy. Asked him to relay info to ESI foreman onsite to not cover anything before an electrical inspection has been performed. 1 set of conduits have already been buried 90%. For future inspections, if anything is covered, 100% of material will be removed to perform a thorough inspection.
|
Electrical Rough-In | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Rock A. Hudson
|
|
|
Andy-underground Phone #: ###-#### All conduits in this area covered priot to inspeciton. BCC 4-05-23- It shall be unlawful for any person to cover up or in any way conceal any electrical wiring, cables, conduits, or other equipment until the same has been inspected and approved by an electrical inspector. Area (B) has minimal conduit runs and is to be under concrete, all future installation shall be inspected prior to cover. Area (B) underground rough in ok cover.
|
Electrical Rough-In | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Mark Moncarr
|
|
|
Andy Phone #: ###-#### Ok cover. Used irreversible to extend ufer.
|
Electrical Rough-In | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Mark Moncarr
|
|
|
Underground Inspection, Jeff Flechsing is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover conduits on N side of school.
|