Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberESC14-00296
StatusFinaled
Name MIKE KOCI
Site Address 101 S CAPITOL BLVD
Project NameCity Center Plaza - utilities
Customer Number 
ePlanReviewNo
Description
Utilities relocation project in prepartion for City Center Plaza. Existing pavement and utilities to be excavated and relocated. Will need to protect MS4 drop inlets and use BMPs for construction access and stockpiling activities as detailed in the approved ESC plan, sheet C.4.0. Geotechnical report states tht groundwater can potentially be at 20 feet or more. No dewatering discussed, if necessary will need to submit dewatering plan. Site preparation inspection will be required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/12/201612/12/201612/13/2016 PASS
DetailsAndy J. Long
All temporary BMPs (drop inlet filter bags) installed for project have now been removed, including on 8th and Main Street. No other corrections requested.

ESC permit conditions satisfied.
DOC - Permit Finaled12/13/201612/13/201612/13/2016PPASS
DetailsAndy J. Long
General Inspection11/25/201611/25/201611/25/2016 PEND
DetailsAndy J. Long
need to remove DI bag on Main Street
General Inspection11/10/201611/10/201611/10/2016 CANC
DetailsAndy J. Long
General Inspection10/26/201610/26/201610/27/2016 PEND
DetailsAndy J. Long
CCP now open with some work remaining. Need to sweep/clean Capitol sidewalk bricks and remove DI bag on Main Street.
General Inspection10/11/201610/11/201610/11/2016 CANC
DetailsAndy J. Long
General Inspection9/26/20169/26/20169/26/2016PPASS
DetailsAndy J. Long
General Inspection9/23/20169/23/20169/26/2016 CANC
DetailsAndy J. Long
General Inspection9/7/20169/8/20169/8/2016PPASS
DetailsAndy J. Long
General Inspection9/7/20169/7/20169/7/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection8/23/20168/23/20168/23/2016 PASS
DetailsEvan Jenkins
Sidewalk open and Bullalo Wildwings are beginning to move in. No ESC issues observed at this time.
General Inspection8/8/20168/8/20168/8/2016PPASS
DetailsAndy J. Long
Project near completion. Main Street has been opened and loose sediment and construction material was cleaned. Multiple projects in the Grove area, surrounding storm drain inlets have filter bag protection.
General Inspection8/5/20168/5/20168/8/2016 CANC
DetailsAndy J. Long
rescheduled for 8/8
General Inspection7/21/20167/21/20167/22/2016 PASS
DetailsAndy J. Long
WIP. Site perimeter is in good condition. No dust blowing around, cementitious materials and dust have been swept on Capitol. No corrections issued
General Inspection7/6/20167/6/20167/8/2016 CANC
DetailsAndy J. Long
General Inspection6/20/20166/21/20166/21/2016APART
DetailsAndy J. Long
DIs around site are installed with sediment filter bags. Those inspected on Main Street are in good condition.

Wind gusts are kicking up wind in Grove area and on Main Street. Most surface have been swept, did not see any stockpile issues.

Dirtiest area is on Capitol Blvd. Correction request to sweep gutter on Capitol and aprons and clean up concrete staging area.
General Inspection6/17/20166/17/20166/20/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection6/2/20166/2/20166/3/2016 PASS
DetailsAndy J. Long
Surrounding streets and sidewalks free of significant loose dirt and material from construction. Inlet filter bags installed. Doing better job sweeping up entrance area on Capitol. No new corrections.
General Inspection5/18/20165/18/20165/19/2016 PART
DetailsAndy J. Long
Site perimeter is free of significant trackout or loose sediment/uncontained material. Surrounding storm drains have sediment protection

Verbal correction request:
- sweep up and dispose of concrete dust and chunks at entrance along Capitol Blvd. Including sidewalks to prevent it from traking on boots and depositing on other materials.
General Inspection5/3/20165/3/20165/3/2016 PASS
DetailsEvan Jenkins
General Inspection4/18/20164/18/20164/18/2016 PASS
DetailsAndy J. Long
Perimeter of site has been swept recently, limited amount of sediment and sand on surrounding streets/gutters. All receiving DIs have inlet protection. No trackout, spills or discharges observed.
General Inspection4/1/20164/1/20164/1/2016 PASS
DetailsAndy J. Long
Vertical and subsurface construction in progress. No sediment trackout from site, some sand collected in areas around perimeter need cleaning. MS4 inlets have sediment filter bags. RP Mike available for corrections when needed. Approved.
Complaint Inspection3/17/20163/17/20163/17/2016PPASS
DetailsEvan Jenkins
Check for white foam particle in surrounding inlets. Complaint called in.

RP stated some wind blew stuff around Monday and it was all cleaned up.

This issue occured on tuesday. Contractor went around the area with a shop vac and cleaned styrofoam in surrounding area. No current issues at time of inspections.
General Inspection3/17/20163/17/20163/17/2016 PASS
DetailsEvan Jenkins
General Inspection3/2/20163/2/20163/2/2016 PASS
DetailsEvan Jenkins
Vertical Construction Continues: No hauling offsite and no ESC issues observed
General Inspection2/16/20162/16/20162/18/2016 PASS
DetailsDave Hannah
General Inspection2/1/20162/1/20162/1/2016 PASS
DetailsEvan Jenkins
General Inspection1/15/20161/15/20161/15/2016 PASS
DetailsEvan Jenkins
Sediment has been swept up on capitol. Vertical construction continues. No ESC issues at this time
General Inspection12/31/201512/31/201512/31/2015 PART
DetailsEvan Jenkins
Minor trackout onto Capital Blvd. Currently contractor sweeping with hand broom
General Inspection12/16/201512/16/201512/16/2015 PASS
DetailsEvan Jenkins
vertical construction only occuring. no esc issues
General Inspection12/1/201512/1/201512/1/2015 PASS
DetailsEvan Jenkins
Vertical Construction Continues: No Hauling offsite, or other discharges occuring.
General Inspection11/16/201511/16/201511/16/2015 PASS
DetailsAndy J. Long
Site entrances and perimeter are stabilized. Vertical construction in progress. No trackout to streets, no discharges observed. No corrections at this time.
General Inspection10/30/201510/30/201510/30/2015 CANC
DetailsAndy J. Long
General Inspection10/15/201510/15/201510/15/2015 PASS
DetailsEvan Jenkins
WIP: Vertically only at this point. no issues observed at this time
General Inspection9/30/20159/30/20159/30/2015 PASS
DetailsEvan Jenkins
Vertical Construction still occuring. No trackout or discharges observed.
General Inspection9/15/20159/15/20159/16/2015 PASS
DetailsEvan Jenkins
No hauling occuring: Only verticle construction occurring at this time
General Inspection8/31/20158/31/20158/31/2015 PASS
DetailsEvan Jenkins
WIP: no ESC issues have been observed. Verticle Construction Continues
General Inspection8/14/20158/14/20158/14/2015 PASS
DetailsEvan Jenkins
General Inspection7/30/20157/30/20157/30/2015 PASS
DetailsEvan Jenkins
Verical WIP: no Trackout or violations observed at this time
General Inspection7/15/20157/15/20157/15/2015 PASS
DetailsEvan Jenkins
WIP
General Inspection6/30/20156/30/20156/30/2015 PASS
DetailsEvan Jenkins
WIP: Verticle Construction currently occuring. no offsite hauling. no ESC issues at this time
General Inspection6/15/20156/15/20156/15/2015 PASS
DetailsEvan Jenkins
General Inspection5/29/20155/29/20155/29/2015 PASS
DetailsEvan Jenkins
WIP: Mainly Verticle Construction occuring at this time. On the southern side of the project, there is a small about to dirt pushing, but No ESC issues/violations
General Inspection5/14/20155/14/20155/14/2015 PASS
DetailsEvan Jenkins
WIP: A HighSky Crane has been constructed to continue with vertical construction. No ESC issues at this time
General Inspection4/29/20154/29/20154/29/2015 PASS
DetailsEvan Jenkins
Vertical Construction is well underway. No ground disturbances taking effect. Main St. road closure has been re-opened a week ago. No ESC issues/violations observed during inspection.
General Inspection4/14/20154/14/20154/14/2015 PART
DetailsEvan Jenkins
Same as prior inspection. Drop Inlet protection on the intersection of Capital/Main need maintained. No other ESC issues at this time
General Inspection3/30/20153/30/20153/30/2015 PASS
DetailsEvan Jenkins
WIP: verticle construction underway. No ESC issues at this time
General Inspection3/13/20153/13/20153/13/2015 PASS
DetailsEvan Jenkins
Construction of the basement parking, and side building currently occuring. No hauling offsite at this time. No ESC issues at time of inspection
General Inspection2/26/20152/26/20152/26/2015 PASS
DetailsEvan Jenkins
Interior work only. no trackout or hauling. no esc issues at this time
General Inspection2/11/20152/11/20152/11/2015 PASS
DetailsAndy J. Long
WIP. Crewmen working to keep down trackout. No dewatering commenced or reported. No corrections at this time.
General Inspection1/27/20151/27/20151/27/2015 PASS
DetailsEvan Jenkins
WIP: no trackout of sediment leaving site.
No ESC Issues
General Inspection1/12/20151/12/20151/12/2015 PASS
DetailsEvan Jenkins
WIP: only work occuring onsite. No hauling occuring. Streets are clean, BMP's in place
No ESC issues at this time
General Inspection12/26/201412/26/201412/29/2014 PASS
DetailsEvan Jenkins
No Hauling occuring during time of inspection. Only interior work occuring. Streets are clean, but Drop Inlet (matador mat) needs to be replaced on SE corver on Capital/Main Intersection. No other issues oberved
General Inspection12/11/201412/11/201412/11/2014 PASS
DetailsEvan Jenkins
Street Sweeping still occuring due to excessive trackout. ESI's Mike Koci has Curtis Clean sweep, sweeping twice daily, and also have a employee on duty throughout the day hand sweeping and shoveling mud off the ROW
Tracking Control11/25/201411/26/201411/26/2014APART
DetailsAndy J. Long
Sweeper service was at site at 4 PM yesterday and cleaned up much of the trackout caused by yesterday's activity. Site is digging deeping and offhauling dirt, so there is heavy vehicle traffic.

Current BMPs to reduce trackout and effects on MS4 system are:

1.Sweeping wheels and knocking mud off trucks at the exit point.
2. Manual sweeping of the intersection on Capitol and Main.
3. DI protection (need to verify fiber mats have been installed).
4. Sweeper service should come 2x again today
Tracking Control11/25/201411/25/201411/25/2014PPEND
DetailsAndy J. Long
Onsite meeting with Boise ESC division and ESC representatives to discuss controlling trackout to Main Street.

The construction ramp out of the hole is too steep for placing rock and hole is still being excavated so it is not possible to have a rock entrance at this time.

Corrective actions:
1. Place matador (fiber) mats on top of two drop inlets on south side of Main Street in between Capital and 6th Street.
2. The entrance side of site is going to have pit run placed on it to prevent wheels from collecting mud upon entry.
3. 2 workers sweeping road in front of exit and knocking mud off tires.
4. Street sweeper to be onsite 2x daily during trackout events.

Street is currently in bad condition but ESI is in process of making corrections.

General Inspection11/25/201411/25/201411/25/2014 FAIL
DetailsAndy J. Long
Excessive trackout to Main St.

Contractor states that grade of construction access prevents putting rock down (loss of traction for dump trucks). Drop inlets have protection and alternative BMP is street sweeping (reportedly 2x daily).
General Inspection11/7/201411/10/201411/10/2014PPART
DetailsEvan Jenkins
Trackout occuring onto Capital BLVD. Called Mike Koci and left VM describing the issues and an eta. for the installation of a construction entrance once they get to a grade where dump trucks won't get stuck. Have yet to hear back from him. Will check up on status tomorrow. Contractors have been sweeping up after each working day so far. No dewatering yet
General Inspection11/7/201411/7/201411/7/2014 CANC
DetailsAndy J. Long
rescheduled
General Inspection10/23/201410/23/201410/23/2014 PASS
DetailsEvan Jenkins
minimal trackout due to todays rains, but contractor is currently sweeping. no other issues at this time
Complaint Inspection10/6/201410/6/201410/6/2014PPART
DetailsEvan Jenkins
Contacted by Robbin Finch PW. He stated he recieved a Complaint for Tracking Control (Trackout) from main st onto Capital. I walked the entire Site and was not concerned. I called Mike Koci and Left a VM disclosing the Complaint, and that a Contruction Entrance/Exit needs to be installed on the Capital Blvd exit to reduce trackout potential. I have yet to hear back from Mike
General Inspection9/19/20149/19/20149/19/2014 PART
DetailsEvan Jenkins
trackout occuring. contractor to do a more detailed sweeping job during construction
General Inspection9/4/20149/4/20149/4/2014PPART
DetailsEvan Jenkins
Trackout occuring due to the use of H20 for dust suppression. Talked with Mike Koci, he stated he has a full time employee with a broom and a pan to keep up on the trackout cleanup. Mike also stated after each day, they utilize a automated sweeper to clean the road and curbs.
No other esc issues observed.
General Inspection9/4/20149/4/20149/4/2014 CANC
DetailsAndy J. Long
inspection performed by Evan
General Inspection8/20/20148/20/20148/20/2014 PASS
DetailsEvan Jenkins
General Inspection8/1/20148/1/20148/1/2014 PASS
DetailsEvan Jenkins
Minor work has begun. Currently only paver removal work is being performed.
no ESC issues at time of inspection
General Inspection7/17/20147/17/20147/17/2014 NR
DetailsEvan Jenkins
Construction hasn't begun. RP states next week will be the startup. did a walk thru of the project with Mike Koci anyways
General Inspection6/18/20146/18/20146/18/2014 CANC
DetailsEvan Jenkins
Called ESI Mike Koci (RP): He stated they won't be ready to break ground till Mid July. Going to perform a walk through to discuss potential issues this Friday at 11am
Site Preparation5/13/20145/13/20145/13/2014PCANC
DetailsAndy J. Long
To be scheduled...no action on this entry. Permit "Ready to Issue"