General Inspection | 12/12/2016 | 12/12/2016 | 12/13/2016 | | PASS |
Andy J. Long
|
|
|
All temporary BMPs (drop inlet filter bags) installed for project have now been removed, including on 8th and Main Street. No other corrections requested.
ESC permit conditions satisfied.
|
DOC - Permit Finaled | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/25/2016 | 11/25/2016 | 11/25/2016 | | PEND |
Andy J. Long
|
|
|
need to remove DI bag on Main Street
|
General Inspection | 11/10/2016 | 11/10/2016 | 11/10/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/26/2016 | 10/26/2016 | 10/27/2016 | | PEND |
Andy J. Long
|
|
|
CCP now open with some work remaining. Need to sweep/clean Capitol sidewalk bricks and remove DI bag on Main Street.
|
General Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/23/2016 | 9/23/2016 | 9/26/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/7/2016 | 9/8/2016 | 9/8/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 8/23/2016 | 8/23/2016 | 8/23/2016 | | PASS |
Evan Jenkins
|
|
|
Sidewalk open and Bullalo Wildwings are beginning to move in. No ESC issues observed at this time.
|
General Inspection | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | PASS |
Andy J. Long
|
|
|
Project near completion. Main Street has been opened and loose sediment and construction material was cleaned. Multiple projects in the Grove area, surrounding storm drain inlets have filter bag protection.
|
General Inspection | 8/5/2016 | 8/5/2016 | 8/8/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for 8/8
|
General Inspection | 7/21/2016 | 7/21/2016 | 7/22/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Site perimeter is in good condition. No dust blowing around, cementitious materials and dust have been swept on Capitol. No corrections issued
|
General Inspection | 7/6/2016 | 7/6/2016 | 7/8/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PART |
Andy J. Long
|
|
|
DIs around site are installed with sediment filter bags. Those inspected on Main Street are in good condition.
Wind gusts are kicking up wind in Grove area and on Main Street. Most surface have been swept, did not see any stockpile issues.
Dirtiest area is on Capitol Blvd. Correction request to sweep gutter on Capitol and aprons and clean up concrete staging area.
|
General Inspection | 6/17/2016 | 6/17/2016 | 6/20/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 6/2/2016 | 6/2/2016 | 6/3/2016 | | PASS |
Andy J. Long
|
|
|
Surrounding streets and sidewalks free of significant loose dirt and material from construction. Inlet filter bags installed. Doing better job sweeping up entrance area on Capitol. No new corrections.
|
General Inspection | 5/18/2016 | 5/18/2016 | 5/19/2016 | | PART |
Andy J. Long
|
|
|
Site perimeter is free of significant trackout or loose sediment/uncontained material. Surrounding storm drains have sediment protection
Verbal correction request: - sweep up and dispose of concrete dust and chunks at entrance along Capitol Blvd. Including sidewalks to prevent it from traking on boots and depositing on other materials.
|
General Inspection | 5/3/2016 | 5/3/2016 | 5/3/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/18/2016 | 4/18/2016 | 4/18/2016 | | PASS |
Andy J. Long
|
|
|
Perimeter of site has been swept recently, limited amount of sediment and sand on surrounding streets/gutters. All receiving DIs have inlet protection. No trackout, spills or discharges observed.
|
General Inspection | 4/1/2016 | 4/1/2016 | 4/1/2016 | | PASS |
Andy J. Long
|
|
|
Vertical and subsurface construction in progress. No sediment trackout from site, some sand collected in areas around perimeter need cleaning. MS4 inlets have sediment filter bags. RP Mike available for corrections when needed. Approved.
|
Complaint Inspection | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Evan Jenkins
|
|
|
Check for white foam particle in surrounding inlets. Complaint called in.
RP stated some wind blew stuff around Monday and it was all cleaned up.
This issue occured on tuesday. Contractor went around the area with a shop vac and cleaned styrofoam in surrounding area. No current issues at time of inspections.
|
General Inspection | 3/17/2016 | 3/17/2016 | 3/17/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/2/2016 | 3/2/2016 | 3/2/2016 | | PASS |
Evan Jenkins
|
|
|
Vertical Construction Continues: No hauling offsite and no ESC issues observed
|
General Inspection | 2/16/2016 | 2/16/2016 | 2/18/2016 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/15/2016 | 1/15/2016 | 1/15/2016 | | PASS |
Evan Jenkins
|
|
|
Sediment has been swept up on capitol. Vertical construction continues. No ESC issues at this time
|
General Inspection | 12/31/2015 | 12/31/2015 | 12/31/2015 | | PART |
Evan Jenkins
|
|
|
Minor trackout onto Capital Blvd. Currently contractor sweeping with hand broom
|
General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 | | PASS |
Evan Jenkins
|
|
|
vertical construction only occuring. no esc issues
|
General Inspection | 12/1/2015 | 12/1/2015 | 12/1/2015 | | PASS |
Evan Jenkins
|
|
|
Vertical Construction Continues: No Hauling offsite, or other discharges occuring.
|
General Inspection | 11/16/2015 | 11/16/2015 | 11/16/2015 | | PASS |
Andy J. Long
|
|
|
Site entrances and perimeter are stabilized. Vertical construction in progress. No trackout to streets, no discharges observed. No corrections at this time.
|
General Inspection | 10/30/2015 | 10/30/2015 | 10/30/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/15/2015 | 10/15/2015 | 10/15/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Vertically only at this point. no issues observed at this time
|
General Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | PASS |
Evan Jenkins
|
|
|
Vertical Construction still occuring. No trackout or discharges observed.
|
General Inspection | 9/15/2015 | 9/15/2015 | 9/16/2015 | | PASS |
Evan Jenkins
|
|
|
No hauling occuring: Only verticle construction occurring at this time
|
General Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no ESC issues have been observed. Verticle Construction Continues
|
General Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/30/2015 | 7/30/2015 | 7/30/2015 | | PASS |
Evan Jenkins
|
|
|
Verical WIP: no Trackout or violations observed at this time
|
General Inspection | 7/15/2015 | 7/15/2015 | 7/15/2015 | | PASS |
Evan Jenkins
|
|
|
WIP
|
General Inspection | 6/30/2015 | 6/30/2015 | 6/30/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Verticle Construction currently occuring. no offsite hauling. no ESC issues at this time
|
General Inspection | 6/15/2015 | 6/15/2015 | 6/15/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/29/2015 | 5/29/2015 | 5/29/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Mainly Verticle Construction occuring at this time. On the southern side of the project, there is a small about to dirt pushing, but No ESC issues/violations
|
General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: A HighSky Crane has been constructed to continue with vertical construction. No ESC issues at this time
|
General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 | | PASS |
Evan Jenkins
|
|
|
Vertical Construction is well underway. No ground disturbances taking effect. Main St. road closure has been re-opened a week ago. No ESC issues/violations observed during inspection.
|
General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 | | PART |
Evan Jenkins
|
|
|
Same as prior inspection. Drop Inlet protection on the intersection of Capital/Main need maintained. No other ESC issues at this time
|
General Inspection | 3/30/2015 | 3/30/2015 | 3/30/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: verticle construction underway. No ESC issues at this time
|
General Inspection | 3/13/2015 | 3/13/2015 | 3/13/2015 | | PASS |
Evan Jenkins
|
|
|
Construction of the basement parking, and side building currently occuring. No hauling offsite at this time. No ESC issues at time of inspection
|
General Inspection | 2/26/2015 | 2/26/2015 | 2/26/2015 | | PASS |
Evan Jenkins
|
|
|
Interior work only. no trackout or hauling. no esc issues at this time
|
General Inspection | 2/11/2015 | 2/11/2015 | 2/11/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Crewmen working to keep down trackout. No dewatering commenced or reported. No corrections at this time.
|
General Inspection | 1/27/2015 | 1/27/2015 | 1/27/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no trackout of sediment leaving site. No ESC Issues
|
General Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: only work occuring onsite. No hauling occuring. Streets are clean, BMP's in place No ESC issues at this time
|
General Inspection | 12/26/2014 | 12/26/2014 | 12/29/2014 | | PASS |
Evan Jenkins
|
|
|
No Hauling occuring during time of inspection. Only interior work occuring. Streets are clean, but Drop Inlet (matador mat) needs to be replaced on SE corver on Capital/Main Intersection. No other issues oberved
|
General Inspection | 12/11/2014 | 12/11/2014 | 12/11/2014 | | PASS |
Evan Jenkins
|
|
|
Street Sweeping still occuring due to excessive trackout. ESI's Mike Koci has Curtis Clean sweep, sweeping twice daily, and also have a employee on duty throughout the day hand sweeping and shoveling mud off the ROW
|
Tracking Control | 11/25/2014 | 11/26/2014 | 11/26/2014 | A | PART |
Andy J. Long
|
|
|
Sweeper service was at site at 4 PM yesterday and cleaned up much of the trackout caused by yesterday's activity. Site is digging deeping and offhauling dirt, so there is heavy vehicle traffic.
Current BMPs to reduce trackout and effects on MS4 system are:
1.Sweeping wheels and knocking mud off trucks at the exit point. 2. Manual sweeping of the intersection on Capitol and Main. 3. DI protection (need to verify fiber mats have been installed). 4. Sweeper service should come 2x again today
|
Tracking Control | 11/25/2014 | 11/25/2014 | 11/25/2014 | P | PEND |
Andy J. Long
|
|
|
Onsite meeting with Boise ESC division and ESC representatives to discuss controlling trackout to Main Street.
The construction ramp out of the hole is too steep for placing rock and hole is still being excavated so it is not possible to have a rock entrance at this time.
Corrective actions: 1. Place matador (fiber) mats on top of two drop inlets on south side of Main Street in between Capital and 6th Street. 2. The entrance side of site is going to have pit run placed on it to prevent wheels from collecting mud upon entry. 3. 2 workers sweeping road in front of exit and knocking mud off tires. 4. Street sweeper to be onsite 2x daily during trackout events.
Street is currently in bad condition but ESI is in process of making corrections.
|
General Inspection | 11/25/2014 | 11/25/2014 | 11/25/2014 | | FAIL |
Andy J. Long
|
|
|
Excessive trackout to Main St.
Contractor states that grade of construction access prevents putting rock down (loss of traction for dump trucks). Drop inlets have protection and alternative BMP is street sweeping (reportedly 2x daily).
|
General Inspection | 11/7/2014 | 11/10/2014 | 11/10/2014 | P | PART |
Evan Jenkins
|
|
|
Trackout occuring onto Capital BLVD. Called Mike Koci and left VM describing the issues and an eta. for the installation of a construction entrance once they get to a grade where dump trucks won't get stuck. Have yet to hear back from him. Will check up on status tomorrow. Contractors have been sweeping up after each working day so far. No dewatering yet
|
General Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 10/23/2014 | 10/23/2014 | 10/23/2014 | | PASS |
Evan Jenkins
|
|
|
minimal trackout due to todays rains, but contractor is currently sweeping. no other issues at this time
|
Complaint Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 | P | PART |
Evan Jenkins
|
|
|
Contacted by Robbin Finch PW. He stated he recieved a Complaint for Tracking Control (Trackout) from main st onto Capital. I walked the entire Site and was not concerned. I called Mike Koci and Left a VM disclosing the Complaint, and that a Contruction Entrance/Exit needs to be installed on the Capital Blvd exit to reduce trackout potential. I have yet to hear back from Mike
|
General Inspection | 9/19/2014 | 9/19/2014 | 9/19/2014 | | PART |
Evan Jenkins
|
|
|
trackout occuring. contractor to do a more detailed sweeping job during construction
|
General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PART |
Evan Jenkins
|
|
|
Trackout occuring due to the use of H20 for dust suppression. Talked with Mike Koci, he stated he has a full time employee with a broom and a pan to keep up on the trackout cleanup. Mike also stated after each day, they utilize a automated sweeper to clean the road and curbs. No other esc issues observed.
|
General Inspection | 9/4/2014 | 9/4/2014 | 9/4/2014 | | CANC |
Andy J. Long
|
|
|
inspection performed by Evan
|
General Inspection | 8/20/2014 | 8/20/2014 | 8/20/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/1/2014 | 8/1/2014 | 8/1/2014 | | PASS |
Evan Jenkins
|
|
|
Minor work has begun. Currently only paver removal work is being performed. no ESC issues at time of inspection
|
General Inspection | 7/17/2014 | 7/17/2014 | 7/17/2014 | | NR |
Evan Jenkins
|
|
|
Construction hasn't begun. RP states next week will be the startup. did a walk thru of the project with Mike Koci anyways
|
General Inspection | 6/18/2014 | 6/18/2014 | 6/18/2014 | | CANC |
Evan Jenkins
|
|
|
Called ESI Mike Koci (RP): He stated they won't be ready to break ground till Mid July. Going to perform a walk through to discuss potential issues this Friday at 11am
|
Site Preparation | 5/13/2014 | 5/13/2014 | 5/13/2014 | P | CANC |
Andy J. Long
|
|
|
To be scheduled...no action on this entry. Permit "Ready to Issue"
|