General Inspection | 3/21/2017 | 3/21/2017 | 3/21/2017 | | CANC |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Andy J. Long
|
|
|
|
Complaint Inspection | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PEND |
Andy J. Long
|
|
|
investigation of complaint in progress. Dual ESC permits with same contractor. Will clost this one, see ESC16-00885
|
General Inspection | 2/24/2017 | 2/24/2017 | 2/27/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/9/2017 | 2/9/2017 | 2/9/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/25/2017 | 1/25/2017 | 1/27/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/10/2017 | 1/10/2017 | 1/11/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/26/2016 | 12/26/2016 | 12/28/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/9/2016 | 12/9/2016 | 12/9/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/24/2016 | 11/24/2016 | 11/25/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/3/2016 | 11/9/2016 | 11/9/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/27/2016 | 11/2/2016 | 11/3/2016 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 10/27/2016 | 10/27/2016 | 10/27/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled to 9/2
|
Site Preparation | 4/27/2016 | 4/28/2016 | 4/28/2016 | A | PASS |
Andy J. Long
|
|
|
Scott-please call prior to meet Phone #: ###-####
Patio renovation and preparation for coverered roof system. Stucco work on exterior.
Silt fence sediment control installed between project area and Logger's Creek. Vegetative buffer has been preserved on the other side of silt fence. Permit sign posted front door.
Reviewed ESC permit conditions with project supervisor. Will provide lined concrete washout. Trash container onsite, requested windblown litter control on creek bank and using water for dust suppresion when concrete cutting.
Approved
|