General Inspection | 3/25/2019 | 3/25/2019 | 3/25/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/8/2019 | 3/8/2019 | 3/8/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/21/2019 | 2/21/2019 | 2/26/2019 | | FAIL |
Michael Zawacki
|
|
|
Needs landscaping and stabalization.
|
General Inspection | 2/6/2019 | 2/6/2019 | 2/6/2019 | | FAIL |
Michael Zawacki
|
|
|
Not landscaped. Rills formed and running into neighbors lot.
|
General Inspection | 1/21/2019 | 1/21/2019 | 1/22/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed, needs landscaping. Most building waste hauled away.
|
Site Final | 1/2/2019 | 1/4/2019 | 1/4/2019 | A | NR |
Andy J. Long
|
|
|
|
General Inspection | 1/2/2019 | 1/2/2019 | 1/2/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/18/2018 | 12/18/2018 | 12/18/2018 | | FAIL |
Michael Zawacki
|
|
|
One person parking in mud and tracking into road. Area was prepped for landscaping before snow but not finished. Rills have reformed and some sediment going into yard below. Rock drainage was built and overwhelmed by sediment.
|
General Inspection | 12/3/2018 | 12/3/2018 | 12/4/2018 | | DONE |
Michael Zawacki
|
|
|
Frozen, was being landscaped.
|
General Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 | | PART |
Michael Zawacki
|
|
|
Hillside needs repair when landscaping. Perimeter fence needs repair.
|
General Inspection | 11/1/2018 | 11/1/2018 | 11/2/2018 | | FAIL |
Michael Zawacki
|
|
|
Piles of stucco and paint washout all over site. Blown out BMPs never repaired.
|
General Inspection | 10/17/2018 | 10/17/2018 | 10/17/2018 | | FAIL |
Michael Zawacki
|
|
|
Trash and stucco washout all around site. Rills were never fixed, erosion blew through silt fence into water seepage area.
|
General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 | | PART |
Michael Zawacki
|
|
|
Will need to monitor how lots handle rain.
|
General Inspection | 9/13/2018 | 9/17/2018 | 9/19/2018 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/12/2018 | 9/12/2018 | 9/13/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/28/2018 | 8/28/2018 | 8/28/2018 | | PASS |
Michael Zawacki
|
|
|
Site will need cleaning and repairs.
|
General Inspection | 8/13/2018 | 8/13/2018 | 8/13/2018 | | PART |
Michael Zawacki
|
|
|
Some loose windblown trash along perimeter. Lots of rills coming down grades along home. Will need to be stabalized or landscaped before fall rains.
|
General Inspection | 7/27/2018 | 7/27/2018 | 7/27/2018 | | PASS |
Michael Zawacki
|
|
|
Work on interior.
|
General Inspection | 7/12/2018 | 7/12/2018 | 7/12/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. Will need repair prior to landscaping.
|
General Inspection | 6/27/2018 | 6/27/2018 | 6/27/2018 | | PEND |
Michael Zawacki
|
|
|
Site still needs repairs, no new issues.
|
General Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 | | FAIL |
Michael Zawacki
|
|
|
Rills and BMP failures were never fixed.Lots of trash around site.
|
General Inspection | 5/28/2018 | 5/28/2018 | 5/29/2018 | | PEND |
Michael Zawacki
|
|
|
Lots of rilling. Sent message to Shane Jayo.
|
General Inspection | 5/11/2018 | 5/11/2018 | 5/11/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical. BMPs will soon need repairs. Rill forming between homes.
|
General Inspection | 4/26/2018 | 4/26/2018 | 4/26/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical. Some wattle below home is nearly over topped. Large rill starting to form between homes.
|
General Inspection | 4/11/2018 | 4/11/2018 | 4/11/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. No issues at site.
|
General Inspection | 3/27/2018 | 3/27/2018 | 3/28/2018 | | PASS |
Michael Zawacki
|
|
|
Foundation work in process. No dirt leaving site.
|
General Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | | PASS |
Michael Zawacki
|
|
|
No new work, Stockpiles on neighboring lots are being removed.
|
General Inspection | 2/23/2018 | 2/23/2018 | 2/26/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity, site is shut down because of snow. Drain inlets have been cleared of snow.
|
General Inspection | 2/8/2018 | 2/8/2018 | 2/8/2018 | | PASS |
Michael Zawacki
|
|
|
Foundation poured. Perimeter BMPs in place. Stockpile is on lots next door.
|
General Inspection | 1/24/2018 | 1/24/2018 | 1/24/2018 | | PASS |
Michael Zawacki
|
|
|
No workers on site during inspection. Foundation poured. Backfill is stored on lots next door that developer owns. Pile of trash on site that will need to be removed.
|
General Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | | PASS |
Michael Zawacki
|
|
|
Pump truck on site, is parked on rock entrance. Cement trucks filling are never leaving asphalt, using washout on lot next door. Some workers parked in mud, will probably cause a mess when they leave. Lots of debris at inlet on sand dune and crestline. Will monitor next few days.
|
General Inspection | 12/25/2017 | 12/25/2017 | 12/26/2017 | | PASS |
Michael Zawacki
|
|
|
No workers on site today. Working on foundation. Large pile of backfill stored on lots in sub.
|
General Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | | PASS |
Michael Zawacki
|
|
|
WIP on foundation. Workers installing forms. Perimeter BMPs in place. Excavated dirt is being stored on neighboring vacant lots on site.
|
General Inspection | 11/23/2017 | 11/23/2017 | 11/24/2017 | | PASS |
Michael Zawacki
|
|
|
Excavation and foundation work in progress. Perimeter controls in place, enterance built, no significant trackout. Builder said washout is being hauled out by concrete contractors.
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | | PEND |
Michael Zawacki
|
|
|
Workk area clean. They will install mor fence to keep neighbors happy. They are hauling to Pleasant Hill & Ridgeline resulting in significant tracking. They said they'll clean after they are done hauling on 11/9 or 11/10.
|
General Inspection | 10/24/2017 | 10/24/2017 | 10/24/2017 | | PASS |
Michael Zawacki
|
|
|
No construction activity.
|
General Inspection | 10/9/2017 | 10/9/2017 | 10/10/2017 | | PASS |
Michael Zawacki
|
|
|
No new disturbance on site. Silt fence will need to be repaired prior to new ground disturbance. South west corner along retaining wall at risk for runoff.
|