Foothills home. BMP installation and Site Preparation Inspection required prior to excavation. BMPs include perimeter wattles, construciton entrance, and inlet protection. Berkely Builders and Wood Bros. responsible to comply with ESC permit conditions.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/22/20186/22/20186/22/2018PPASS
DetailsAndy J. Long
Yard landscaped, rear hillside vegetated, stormwater outlet rip rapped/stabilized. BLD finaled, ESC permit conditions satisfied.

Approved
General Inspection6/11/20186/11/20186/13/2018 PASS
DetailsAndy J. Long
No activity. Slopes on lot are mostly vegetated with grass and weeds.Silt fence installed at bottom of lot is trenched in with no breaks. No sediment runoff or hillside erosion on lot.
General Inspection5/25/20185/25/20185/29/2018 PASS
DetailsMichael Zawacki
General Inspection5/10/20185/10/20185/10/2018 PASS
DetailsMichael Zawacki
Grass on hillside coming in. No issues.
General Inspection4/25/20184/25/20184/25/2018 CANC
DetailsAndy J. Long
General Inspection4/10/20184/10/20184/11/2018 PEND
DetailsAndy J. Long
revegetation still occuring @ back side along Shaw Mtn Road.
General Inspection3/26/20183/26/20183/26/2018 PASS
DetailsMichael Zawacki
Riprap protecting outlet for gutters, no rilling issues. Grass is starting to grow.
General Inspection3/9/20183/9/20183/12/2018 CANC
DetailsAndy J. Long
General Inspection2/22/20182/22/20182/22/2018 CANC
DetailsAndy J. Long
General Inspection2/7/20182/7/20182/7/2018 PASS
DetailsMichael Zawacki
Drain area was improved with riprap.
General Inspection1/23/20181/23/20181/23/2018 PEND
DetailsMichael Zawacki
Some rilling and erosion on hillside along Shaw Mt. Someone also drove on it. Will monitor after rains and ask owner to correct if it gets bad.
General Inspection1/8/20181/8/20181/8/2018 PASS
DetailsMichael Zawacki
Homeowner will monitor until final stabalization completed.
General Inspection12/22/201712/22/201712/22/2017 PASS
DetailsMichael Zawacki
Hillside and yard stabalized. Talked to homeowner and they will keep an eye out for any issues.
General Inspection12/7/201712/7/201712/7/2017 PASS
DetailsMichael Zawacki
Landscapers installing sprinkler system. ADS installed for drainage. Concrete curing under blankets. No loose trash or dirt on site.
General Inspection11/22/201711/22/201711/22/2017 PASS
DetailsMichael Zawacki
Silt fence repaired, trash has been emptied. Hillside along side of house and hill still exposed. Some windblown trash behind silt fence.
General Inspection11/7/201711/7/201711/7/2017 FAIL
DetailsMichael Zawacki
Trash full and spilling to the ground. Half of silt fence torn and down, blown in trash. Exposed hillside is starting to rill. RP was asked to fix this 10-13 and never did.
General Inspection10/16/201710/23/201710/26/2017APEND
DetailsMichael Zawacki
follow up
Silt fence repaired on southern edge, everywhere else is damagead and full of debris.
No wattle on slope.
Site Preparation10/13/201710/16/201710/16/2017APEND
DetailsAndy J. Long
9:30 Am
Mark Berkley Builders ###-####

Permit sign posted, no trackout/discharges; trash container onsite and trash picked up.

Corrections:
- re-install silt fence properly at bottom of lot at Shaw Mountain.
- install slope interupting wattles (two rows) along south side of house.
*check out retaining wall/stair project next door (656 San Felipe)

Will check back in one week (silt fence should be installed )
BMP Violation10/5/201710/10/201710/12/2017PFAIL
DetailsMichael Zawacki
Silt fence needs to be removed/repaired
BMP Violation9/28/20179/28/201710/5/2017PCANC
DetailsAndy J. Long
BMP Violation9/19/20179/22/20179/28/2017ACANC
DetailsAndy J. Long
fix silt fence, conduct clean up at site
BMP Violation9/8/20179/11/20179/19/2017APEND
DetailsAndy J. Long
fix silt fence
General Inspection9/8/20179/8/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/24/20178/24/20178/25/2017 CANC
DetailsAndy J. Long
General Inspection8/9/20178/9/20178/11/2017 CANC
DetailsAndy J. Long
General Inspection7/25/20177/25/20177/25/2017 CANC
DetailsAndy J. Long
General Inspection7/10/20177/10/20177/10/2017 PASS
DetailsMelissa Jannusch
No ESC issues observed.
General Inspection6/23/20176/23/20176/23/2017 CANC
DetailsAndy J. Long
General Inspection6/8/20176/8/20176/8/2017 PASS
DetailsAndy J. Long
Excavation phase complete. Permit posted.
Vegetation below disturbed area has been preserved and a silt fence installed to control runoff to Shaw Mtn. Road.. No trackout or loose trash or materials around site. Approved.
General Inspection5/17/20175/17/20175/17/2017 PASS
DetailsMelissa Jannusch
General Inspection4/21/20174/21/20174/21/2017 PASS
DetailsMelissa Jannusch
No ESC issues observed.