Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC16-01720
StatusFinaled
Name BRUCE STEINWINTER
Site Address 150 N CAPITOL BLVD
Project NameCity Hall Plaza Renovation
Customer Number 
ePlanReviewNo
Description
BMPs include temporary inlet protetion on Idaho, Capitol and Main Street. This shall entail installation prior to construction, inspection and maintenace during construction, and removal upon stabilization of the disturbed areas. Pollution prevention BMPs to be utilized for work and staging areas. Site preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/5/20186/5/20186/5/2018 CANC
DetailsAndy J. Long
Site Final6/5/20186/5/20186/5/2018PPASS
DetailsAndy J. Long
Construction complete. All temporary storm drain bags have been removed. No ESC corrections.
General Inspection4/20/20184/20/20184/20/2018 PASS
DetailsMichael Zawacki
WIP on a few planter boxes. No issues with any runoff, loose dirt, or trash.
Site Final2/21/20183/5/20183/6/2018PNR
DetailsAndy J. Long
1 temporary inlet protection still installed at Capitol and Idaho.

Request to sweep up accumulated dirt trapped by inlet protection. In particular on inlet and Capitol and Main Street.

General Inspection2/21/20182/21/20182/21/2018PPEND
DetailsAndy J. Long
Work complete.


RP to remove temporary sediment filter bags from storm drains on Capitol, Main, and Idaho Street. Sweep up any dirt collected around inlets. RP currently on leave but will address upon return first week of March.

Site final scheduled March 5th.
General Inspection2/6/20182/6/20182/6/2018 PART
DetailsMichael Zawacki
DIs need to be cleaned along Capital Blvd.
General Inspection12/19/201712/19/201712/21/2017 PASS
DetailsAndy J. Long
WIP along sixth street. DI bags still installed on Capitol need to be removed. NO discharges, no trackout
Site Final11/2/201711/3/201711/3/2017ANR
DetailsAndy J. Long
General Inspection10/17/201710/17/201710/23/2017 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection8/30/20178/30/20178/30/2017PPART
DetailsAndy J. Long
DI bags have been changed out and sweeping of sidewalk completed. Still need to find alternative to sandbags for weighing down the fence.
General Inspection8/22/20178/24/20178/30/2017PCANC
DetailsAndy J. Long
General Inspection8/22/20178/22/20178/22/2017PFAIL
DetailsAndy J. Long
no corrective actions completed. 2nd request to onsite CM representative Ryan.

Sweep Main STreet sidewalk, replace damaged/ripped sandbags with alternative fence weight.

Conduct maintenance on the storm drain protection on Main and Capitol.
General Inspection8/17/20178/17/20178/22/2017PFAIL
DetailsAndy J. Long
Verbal correction request issued 8/16 to clean up sidewalk on Main Street (broken sandbags) and to conduct maintenance on the storm drain inlet there.

General Inspection7/11/20177/11/20177/14/2017ACANC
DetailsMelissa Jannusch
General Inspection7/5/20177/6/20177/11/2017PCANC
DetailsAndy J. Long
General Inspection5/16/20175/16/20175/19/2017PPASS
DetailsAndy J. Long
WIP. Storm drains on Capitol and Main street have sediment protection. Permit sign is posted. NO trackout or discharges.
General Inspection4/4/20174/7/20174/7/2017PPASS
DetailsAndy J. Long
check for corrections (sign, DI protection modification)

Curb cuts to storm drains have been fitted with sandbags to prevent water bypassing the filter fabric sediment protection. Approved.
Site Preparation4/4/20174/4/20174/4/2017PPART
DetailsAndy J. Long
On site contact for CM - Brandon ###-####

Construction fencing installed around work area, MS4 inlet protection bags installed.

Correction:
- need to adjust inlet protection to account for water entering curb cut
- post ESC permit sign at site entrance