Permit Information
Permit NumberESC17-00149
StatusFinaled
Name AMANDA FLESHMAN
Site Address 1825 N MOCKBEE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
As Per Andy Long ok to use ESC permit for both the GRD permit and BLD17-00149 permits
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/12/20184/12/20184/12/2018 PASS
DetailsAndy J. Long
Home complete, landscaped and occupied. Adajecent lot has been cleaned. Parcel under review for development.
DOC - Permit Finaled4/12/20184/12/20184/12/2018PPASS
DetailsAndy J. Long
Conference3/28/20183/28/20183/28/2018PCANC
DetailsAndy J. Long
Conference3/28/20183/28/20183/28/2018PPEND
DetailsAndy J. Long
Request to stabilize adjacent lot and pull 1st down stream DI bag from site. Notified that ESC permit is still open and needs site final.
Complaint Inspection3/16/20183/19/20183/19/2018PDONE
DetailsAndy J. Long
No issues on this site. Some sediment runoff and minor erosion occuring on open lots on west side of Mockbee. Corrections pending.
General Inspection3/13/20183/13/20183/13/2018 PASS
DetailsMichael Zawacki
General Inspection2/26/20182/26/20182/26/2018 PASS
DetailsMichael Zawacki
Home appears completed and landscaping istalled. No issues.
General Inspection2/9/20182/9/20182/9/2018 PASS
DetailsMichael Zawacki
Yard landscaped and waiting for final stabalization.
General Inspection1/25/20181/25/20181/26/2018 CANC
DetailsAndy J. Long
General Inspection1/10/20181/10/20181/11/2018 PASS
DetailsMichael Zawacki
Exterior work and landscaping complete.
General Inspection12/21/201712/21/201712/21/2017 PASS
DetailsMichael Zawacki
Yard has been landscaped. No issues observed.
General Inspection12/6/201712/6/201712/6/2017 PASS
DetailsMichael Zawacki
Exterior work completed.
General Inspection11/17/201711/17/201711/17/2017 PASS
DetailsAndy J. Long
General Inspection11/2/201711/2/201711/2/2017 PASS
DetailsMichael Zawacki
Home complete. Yard landscape and stabalized.
Site Preparation3/24/20173/27/20173/27/2017APASS
DetailsMelissa Jannusch
Okay to start. Talked with RP about using concrete washout once concrete work begins and implementing daily sweeping while muddy conditions persist.