Permit Information
Permit NumberESC17-00416
StatusFinaled
Name JUSTIN JAYO
Site Address 455 W SAND DUNE LN
Project Name 
Customer Number 
ePlanReviewNo
Description
ESC site map and narrative prepared for site. BMPs include perimeter wattles to be installed to control sediment in runoff, follow natural contours and trench and stake in properly. Use designated Somerset washout pit. Maintain existing DI bags on Sand Dune. Site preparation inspection REQUIRED>
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/26/20193/26/20193/26/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled3/26/20193/26/20193/26/2019PPASS
DetailsMichael Zawacki
General Inspection3/11/20193/11/20193/11/2019 PART
DetailsMichael Zawacki
Needs landscaping.
General Inspection2/22/20192/22/20192/26/2019 FAIL
DetailsMichael Zawacki
Needs landscaping and stabalization.
General Inspection2/7/20192/7/20192/7/2019 FAIL
DetailsMichael Zawacki
Home complete. Rills forming between homes and in backyard. Sediment goint into back yards of homes below.
General Inspection1/22/20191/22/20191/22/2019 PASS
DetailsMichael Zawacki
Home completed, needs landscaping. Most building waste hauled away.
General Inspection1/7/20191/7/20191/7/2019 PASS
DetailsMichael Zawacki
Home is complete, still needs landscaping.
General Inspection12/21/201812/21/201812/21/2018 PASS
DetailsMichael Zawacki
Needs landscaping and stabalization, home complete.
General Inspection12/6/201812/6/201812/6/2018 PASS
DetailsMichael Zawacki
Exterior looks completed, all of lot is snow covered. Trash bin has been removed.
General Inspection11/21/201811/21/201811/21/2018 PASS
DetailsMichael Zawacki
Project nearing completion, will need repairs and landscaping.
General Inspection11/6/201811/6/201811/6/2018 PART
DetailsMichael Zawacki
Area needs cleaning and landscaping.
General Inspection10/22/201810/22/201810/22/2018 PART
DetailsMichael Zawacki
Home nearly done. Area needs trash cleaned and lot repaired and landscaped.
General Inspection10/5/201810/5/201810/5/2018 CANC
DetailsAndy J. Long
General Inspection9/20/20189/20/20189/21/2018 CANC
DetailsAndy J. Long
General Inspection9/5/20189/5/20189/5/2018 PASS
DetailsMichael Zawacki
General Inspection8/21/20188/21/20188/21/2018 PART
DetailsMichael Zawacki
Trash needs to be removed, box is overfull, also lots of small trash around site. Rills will need repair when landscaped.
General Inspection8/6/20188/6/20188/6/2018 PASS
DetailsMichael Zawacki
Interior work. Site will need cleaning and stabalization before fall rains.
General Inspection7/20/20187/20/20187/20/2018 PART
DetailsMichael Zawacki
New silt fence along bottom of hill. Rills are still on site, some wind blown trash.
No discharges and site contained.
General Inspection7/5/20187/5/20187/6/2018 CANC
DetailsAndy J. Long
General Inspection6/20/20186/20/20186/20/2018 PEND
DetailsMichael Zawacki
Site still needs cleaning and repair.
General Inspection5/24/20186/5/20186/5/2018PFAIL
DetailsMichael Zawacki
follow up
No repairs or corrections taken for runoff and erosion issue. Lots of sediment is around drain on Sand Dune and at Boise Hills.
General Inspection5/18/20185/21/20185/24/2018PPART
DetailsAndy J. Long
Follow up:

- check for trash pick up around both homes
- additional sediment catchment/perimeter control to be added in front of existing wattle.

DI bag on uphill side of Sand Dune was changed out. Trash around back mostly picked up, some items remain. No trackout or discharges.

Correction needed:
- wattle/trench has faile and some sediment and sand has ran into downhill neighbors yard. Need to additional controls to slow and capture runoff between the two homes.

Correction request to Shane to fix and clean up this area. He stated that framers should be next week and will have excavator work on erosion issue. In meanwhile will take measures to prevent further sediment runoff to neighbor
General Inspection5/10/20185/14/20185/18/2018PPART
DetailsAndy J. Long
Inspected 5/17 AM

Sediment behind wattles had been maintained prior to recent storm. No sediment runoff to neighbor observed.

Large gully between homes has increased in size. RP-GC is aware and will be repair once framers are done at site next week.

Correction requests:
- pick up all loose trash around both sites
- add additional wattle and/or sand retention area at bottom of gully.
- change out DI bag on upper side of Sand Dune.

Follow up schedule. Verbal correction request to Shane Jayo
General Inspection5/3/20185/10/20185/10/2018APEND
DetailsAndy J. Long
follow up inspection for watle maintenance at back of lot below erosion rill between homes..
General Inspection5/3/20185/3/20185/3/2018 PART
DetailsAndy J. Long
No trackout or discharges to Sand Dune. Trash relatively contained.

Correction request to Justin Jayo voicemail

- remove collected dirt behind wattle in the backyard to increase capacity.
- fix rill/channel that has developed between the twon home
- pick up any loose trash and put in container.
General Inspection4/18/20184/18/20184/18/2018 PASS
DetailsMichael Zawacki
WIP on framing. No dirt leaving site, vo loose trash. Building material being staged in cul-de-sac.
General Inspection4/2/20184/2/20184/2/2018 PASS
DetailsMichael Zawacki
WIP on framing. No esc issues and site is clean today.
General Inspection3/16/20183/16/20183/16/2018 PEND
DetailsMichael Zawacki
Backfill has been refilled. Rill starting to gorm between two new homes. Wattle at bottom very close to being overtopped and spilling into neighbors below back yard.
General Inspection3/1/20183/1/20183/1/2018 PASS
DetailsMichael Zawacki
Site has bee inactive since foundations poured. No ESC issues.
General Inspection2/14/20182/14/20182/15/2018 PASS
DetailsMichael Zawacki
No new work
General Inspection1/29/20181/29/20181/29/2018 PASS
DetailsMichael Zawacki
No workers on site. Foundations have been poured. Perimeter BMPs in place. Stockpile is on adjacent lot. Some trash piled on adjacent lot as well.