General Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/11/2019 | 3/11/2019 | 3/11/2019 | | PART |
Michael Zawacki
|
|
|
Needs landscaping.
|
General Inspection | 2/22/2019 | 2/22/2019 | 2/26/2019 | | FAIL |
Michael Zawacki
|
|
|
Needs landscaping and stabalization.
|
General Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | | FAIL |
Michael Zawacki
|
|
|
Home complete. Rills forming between homes and in backyard. Sediment goint into back yards of homes below.
|
General Inspection | 1/22/2019 | 1/22/2019 | 1/22/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed, needs landscaping. Most building waste hauled away.
|
General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 | | PASS |
Michael Zawacki
|
|
|
Home is complete, still needs landscaping.
|
General Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | | PASS |
Michael Zawacki
|
|
|
Needs landscaping and stabalization, home complete.
|
General Inspection | 12/6/2018 | 12/6/2018 | 12/6/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior looks completed, all of lot is snow covered. Trash bin has been removed.
|
General Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | | PASS |
Michael Zawacki
|
|
|
Project nearing completion, will need repairs and landscaping.
|
General Inspection | 11/6/2018 | 11/6/2018 | 11/6/2018 | | PART |
Michael Zawacki
|
|
|
Area needs cleaning and landscaping.
|
General Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 | | PART |
Michael Zawacki
|
|
|
Home nearly done. Area needs trash cleaned and lot repaired and landscaped.
|
General Inspection | 10/5/2018 | 10/5/2018 | 10/5/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/20/2018 | 9/20/2018 | 9/21/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/21/2018 | 8/21/2018 | 8/21/2018 | | PART |
Michael Zawacki
|
|
|
Trash needs to be removed, box is overfull, also lots of small trash around site. Rills will need repair when landscaped.
|
General Inspection | 8/6/2018 | 8/6/2018 | 8/6/2018 | | PASS |
Michael Zawacki
|
|
|
Interior work. Site will need cleaning and stabalization before fall rains.
|
General Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | | PART |
Michael Zawacki
|
|
|
New silt fence along bottom of hill. Rills are still on site, some wind blown trash. No discharges and site contained.
|
General Inspection | 7/5/2018 | 7/5/2018 | 7/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2018 | 6/20/2018 | 6/20/2018 | | PEND |
Michael Zawacki
|
|
|
Site still needs cleaning and repair.
|
General Inspection | 5/24/2018 | 6/5/2018 | 6/5/2018 | P | FAIL |
Michael Zawacki
|
|
|
follow up No repairs or corrections taken for runoff and erosion issue. Lots of sediment is around drain on Sand Dune and at Boise Hills.
|
General Inspection | 5/18/2018 | 5/21/2018 | 5/24/2018 | P | PART |
Andy J. Long
|
|
|
Follow up:
- check for trash pick up around both homes - additional sediment catchment/perimeter control to be added in front of existing wattle.
DI bag on uphill side of Sand Dune was changed out. Trash around back mostly picked up, some items remain. No trackout or discharges.
Correction needed: - wattle/trench has faile and some sediment and sand has ran into downhill neighbors yard. Need to additional controls to slow and capture runoff between the two homes.
Correction request to Shane to fix and clean up this area. He stated that framers should be next week and will have excavator work on erosion issue. In meanwhile will take measures to prevent further sediment runoff to neighbor
|
General Inspection | 5/10/2018 | 5/14/2018 | 5/18/2018 | P | PART |
Andy J. Long
|
|
|
Inspected 5/17 AM
Sediment behind wattles had been maintained prior to recent storm. No sediment runoff to neighbor observed.
Large gully between homes has increased in size. RP-GC is aware and will be repair once framers are done at site next week.
Correction requests: - pick up all loose trash around both sites - add additional wattle and/or sand retention area at bottom of gully. - change out DI bag on upper side of Sand Dune.
Follow up schedule. Verbal correction request to Shane Jayo
|
General Inspection | 5/3/2018 | 5/10/2018 | 5/10/2018 | A | PEND |
Andy J. Long
|
|
|
follow up inspection for watle maintenance at back of lot below erosion rill between homes..
|
General Inspection | 5/3/2018 | 5/3/2018 | 5/3/2018 | | PART |
Andy J. Long
|
|
|
No trackout or discharges to Sand Dune. Trash relatively contained.
Correction request to Justin Jayo voicemail
- remove collected dirt behind wattle in the backyard to increase capacity. - fix rill/channel that has developed between the twon home - pick up any loose trash and put in container.
|
General Inspection | 4/18/2018 | 4/18/2018 | 4/18/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. No dirt leaving site, vo loose trash. Building material being staged in cul-de-sac.
|
General Inspection | 4/2/2018 | 4/2/2018 | 4/2/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. No esc issues and site is clean today.
|
General Inspection | 3/16/2018 | 3/16/2018 | 3/16/2018 | | PEND |
Michael Zawacki
|
|
|
Backfill has been refilled. Rill starting to gorm between two new homes. Wattle at bottom very close to being overtopped and spilling into neighbors below back yard.
|
General Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 | | PASS |
Michael Zawacki
|
|
|
Site has bee inactive since foundations poured. No ESC issues.
|
General Inspection | 2/14/2018 | 2/14/2018 | 2/15/2018 | | PASS |
Michael Zawacki
|
|
|
No new work
|
General Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | | PASS |
Michael Zawacki
|
|
|
No workers on site. Foundations have been poured. Perimeter BMPs in place. Stockpile is on adjacent lot. Some trash piled on adjacent lot as well.
|