Site Final | 8/8/2018 | 8/8/2018 | 8/10/2018 | P | PASS |
Andy J. Long
|
|
|
Homeowner in progress of completing landscaping. No further ESC inspections required.
|
General Inspection | 8/8/2018 | 8/8/2018 | 8/8/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Final | 7/23/2018 | 7/24/2018 | 7/25/2018 | A | PEND |
Michael Zawacki
|
|
|
Still not landscaped. Sprinkler system in process of being installed. Oile of topsoil on lot and sidewalk.
|
General Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/6/2018 | 7/6/2018 | 7/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2018 | 6/20/2018 | 6/20/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/1/2018 | 6/1/2018 | 6/1/2018 | | PASS |
Michael Zawacki
|
|
|
Still not landscaped.
|
General Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | NR |
Andy J. Long
|
|
|
BLD finaled. Landscaping/stabilization not yet complete. No sediment leaving site, revegetation bond issued. Will keep permit open for now.
|
General Inspection | 3/30/2018 | 3/30/2018 | 3/30/2018 | | PASS |
Michael Zawacki
|
|
|
Home complete. Still needs landscaping to be complete.
|
Random Inspection | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Andy J. Long
|
|
|
Site has trash containment, no trackout from adjacent lot. Driveway poured. Storm drains on Heartleaf haved sediment filter bags installed. No corrections requested.
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | FAIL |
Michael Zawacki
|
|
|
Lots of loose trash and lumber scraps on site. Loose gravel on sidewalk and curb.
|
Site Preparation | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Melissa Jannusch
|
|
|
Project already started. No ESC violations. Sign posted. Okay to start. Brian Phone #: ###-####
|