General Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/6/2018 | 7/6/2018 | 7/6/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/21/2018 | 6/21/2018 | 6/21/2018 | | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Michael Zawacki
|
|
|
Driveway is in and sidewalk has been cut for driveway. Irragation and landscape company on site. No issues.
|
General Inspection | 5/24/2018 | 5/24/2018 | 5/24/2018 | | PASS |
Michael Zawacki
|
|
|
Site is clean and repaired. Some rilling from gutters, builder will put poly on ground to protect until they get connected to drain.
|
BMP Violation | 5/2/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Michael Zawacki
|
|
|
Check for cleanup of washout and repair of wattle and hill. Talked to new RP, Justin no longer with company. Sidewalk has been cleaned, stucco has been raked and removed. Old washout has been consolidated in pile. Driveway is scheduled to be poured and curb cut. All will be cleaned when they complete that work.
|
General Inspection | 5/2/2018 | 5/2/2018 | 5/2/2018 | | FAIL |
Michael Zawacki
|
|
|
Rilling still in front, wattles have failed and sand is on sidewalk. Concrete, paint, and stucco washed out in back corner of lot and also in front corner. Second failure for same issues, sending written request to RP and will follow up 5-9. Will put inspection hold on parcel if site not cleaned.
|
General Inspection | 4/12/2018 | 4/12/2018 | 4/13/2018 | | FAIL |
Michael Zawacki
|
|
|
Lots of rilling in front, wattle is overtopped and runoff is on sidewalk. Wattles need to be maintained and repaired and sidewalks swept. Painters on site, washing out onto ground. Stucco is on site and hasn't begun, mixer has no secondary containment.
|
General Inspection | 12/18/2017 | 1/4/2018 | 1/3/2018 | A | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 1/3/2018 | 1/3/2018 | 1/3/2018 | P | PASS |
Michael Zawacki
|
|
|
BMPs still in place. Framers on site, using trash box. No dirt leaving site.
|
Random Inspection | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. No significant trackout. Perimeter sediment control wattles installed.
|
Site Preparation | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Michael Zawacki
|
|
|
John Phone #: ###-#### 2 rows of wattle for perimeter protection. Excavation for foundation has already begun.
|