General Inspection | 12/31/2019 | 12/31/2019 | 12/31/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
Michael Zawacki
|
|
|
Pile of debris cleaned
|
Site Final | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | NR |
Michael Zawacki
|
|
|
Saw cut concrete and washout on north side of project. Sent message and pic to John with Petra. Talked to facilities manager on site, they will watch out for illegal dumping.
|
General Inspection | 10/1/2019 | 10/1/2019 | 10/1/2019 | | PASS |
Michael Zawacki
|
|
|
All work and lan dscaping completed. Lot to north still has landscape waste, concrete chunks and washout, and a dumpster.
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Andy J. Long
|
|
|
WIP on interior and exterior site clean up.
Will require street sweeping on Bird before getting ESC site final approval
|
General Inspection | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Michael Zawacki
|
|
|
Landscaping completed, site looks stabalized.
|
General Inspection | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Michael Zawacki
|
|
|
Landscapers on site finishing up.
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/26/2019 | | PASS |
Michael Zawacki
|
|
|
Project nearly finished. Landscapers n site, nost of area planted. Parking lot in front has been torn up and crew working on sewer. No issues at site.
|
General Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Michael Zawacki
|
|
|
Landscapers on site. Tuffy hauling out old fill and bringing in screened top soil, will sweep road. No ESC issues, nearing completion.
|
General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Michael Zawacki
|
|
|
Pouring concrete in rear for what looks like dog runs or kennels. Washout on site and being used. Some activity on stockpile, no dust. Site is contained and no issues.
|
General Inspection | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Michael Zawacki
|
|
|
Trackout from tuffy has been cleaned.
|
General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PEND |
Michael Zawacki
|
|
|
Some trackout from Tuffy. Talked to Jon the project manager and he will make sure it is cleaned. Trackout further down Bird. Sounds like unmarked truck and trailer pulled into mud and took some gravel that was piled there and was previously used at apartments. Truck had nothing to do with partments or Humane Society.
|
General Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 3/8/2019 | 3/8/2019 | 3/11/2019 | | PASS |
Michael Zawacki
|
|
|
Met with foreman on site. Will have crew do a trash walk and pick up bottles and other small trash. Will have tuffy on site to remove stockpiles, grade, and add topsoil soon as site is dry enough. Plans on having sweeper in parking lot, all workers parking on street.
|
General Inspection | 1/21/2019 | 1/21/2019 | 1/22/2019 | | PASS |
Michael Zawacki
|
|
|
Met with foreman on site. Will clean inlets bags on bird street and install new witches hats in parking lot. Crew on site cleaning crash, large dumpster being used.
|
General Inspection | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Michael Zawacki
|
|
|
Ground snow covered, no dirtwork activity. Workers parking on paved lot.
|
General Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PART |
Michael Zawacki
|
|
|
Area around building is paved. Traffic being directed around parking lot, construction entrance needs to be repaired, it is all compacted. Majority of work is now inside building.
|
General Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PART |
Michael Zawacki
|
|
|
Some trackout and dirt in gutters coming from south entrance. All workers parking on road, trackout from equipment prepping lot for paving. Trench is being cut across Bird St.
|
Tracking Control | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Michael Zawacki
|
|
|
Entrances are blocked, workers are parking on street or parking lot across street. Lots of standing water and mud on site, all contained.
|
General Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PART |
Michael Zawacki
|
|
|
Bird stree has dirt in gutters and needs to be swept. Site is being prepped for paving. No other ESC issues on site.
|
General Inspection | 8/14/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Michael Zawacki
|
|
|
Met with foreman while on site. One witches hat has started falling into inlet. Tuffy brings water truck a few times a week. Project will be operating through winter. Most paving should be done in a few weeks. New pit run will be brought in fo employee parking before weather turns.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Andy J. Long
|
|
|
WIP on interior. Shell complete. No trackout or fugitive dust. Will need to improve construction entrance once dry season is over and chipseal on Bird is complete.
|
General Inspection | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Michael Zawacki
|
|
|
Current work on site is all mechanical inside building. No loose trash around site. Staging for duct work is behind the building. No blowing dust at time of inspection.
|
Random Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Andy J. Long
|
|
|
Construction entrance installed. No trackout to Bird. Storm drains have sediment protection. No loose trash or disharges observed. WIP on framing. No fugtive dust occuring at time of inspection.
|
Random Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Michael Zawacki
|
|
|
Properly constructed washout on site and being used. Mortar mixer and form oils are in secondary containment. Currently site is free of dust, a water truck should be kept on site for future issues. Trade meeting was going on and I didn't talk to foreman.
|
General Inspection | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Michael Zawacki
|
|
|
WIP. Lots of dust on bird street along area where vehicles parked. Rock entrance on site, compacted round rock, no crushed.
|
Tracking Control | 3/26/2018 | 3/28/2018 | 3/30/2018 | P | PART |
Andy J. Long
|
|
|
New rock installed at entrance. Rock is round and not angular, unable to tell if fabric is underneath.
Trackout from apron and loose dirt in the gutter.
Warned about stockpiles being source of dust. Need to stabilize or move. Stated they need to be screened and dirt will be reused.
|
Tracking Control | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | FAIL |
Andy J. Long
|
|
|
Muddy, unmaintained construction entrance.
Corrrection request to have new entrance installed tomorrow. Specific requested for the angular 1.5-3" rock and geotextile lining underneath.
|
General Inspection | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is well contained. New concrete washout has bee installed. Back entrance has been vlocked forcing everyone to comne in and out in one spot. Rock entrance needs to be freshened up, will have Tuffy repair when they are back on site.
|
General Inspection | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed
- repost ESC permit sign and SWPPP info - refresh and maintain south construction entrance to Bird - have crew sweep and scoop dirt and gravel out of the east side of the gutter
Verbal corrrection request issued to RP John Low wth Petra 208.860.7522
1 week compliance time granted
|
General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Michael Zawacki
|
|
|
New entrance built, old one blocked off. No fugitive dust or dirt, very light track out. Has been swept since last inspection.
|
General Inspection | 11/14/2017 | 11/14/2017 | 11/14/2017 | P | PEND |
Michael Zawacki
|
|
|
Needs new construction entrances. Talked to John, the project manager, said they will construct new entrance and a gravel employee parking lot they will share with neighboring contractors. Will get sweeper scheduled to clean track out.
|
General Inspection | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Michael Zawacki
|
|
|
Large site with other big projects adjacent. Entire area is being prepped for curb and gutterEntire area has been watered and free from fugitive dust. Dirt is not on neighboring properties. Free of trash and trackout. Looks like water and/or sewer is being installed. Water truck on site.
|
General Inspection | 8/18/2017 | 8/23/2017 | 8/25/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/16/2017 | 8/16/2017 | 8/18/2017 | P | PASS |
Andy J. Long
|
|
|
MInimal activity at IHS site. No trackout or wind blown fugitive dust observed. Contractor wIll need to stabilize areas that are inactive. Follow up scheduled for next week..
|
BMP Violation | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PART |
Andy J. Long
|
|
|
City of Boise ESC permit posted, construction entrance installed on Bird and to the north access to Hackamore. Currently installing underground utilities and hauling away grubbed topsoil. Topsoil stockpile and loading into trucks is main source of dust. Site does not have a designated water truck, but one that is moving between sites. No excessive dust at time of inspection, but did receive complaint this moring about fugitive dust and no water suppresion.
Violations: - no site preparation inspection requested, informed RP John of the policy/requireement
Correction request: - have designated water truck for site - sweep access to Hackamore
- need to update sign to have current CGP 2017 required signage.
|