Site Final | 5/20/2019 | 5/20/2019 | 5/23/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 5/20/2019 | 5/20/2019 | 5/20/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Michael Zawacki
|
|
|
Front of home completed. Landscaping in rear is not completed.
|
Aging Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 | | PASS |
Michael Zawacki
|
|
|
Landscaping needs to be completed.
|
General Inspection | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Michael Zawacki
|
|
|
Home is complete. Front yard is landscaped, crew in rear prepping yard.
|
General Inspection | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Michael Zawacki
|
|
|
Still dewatering for pool. Well point is below gravel for pool base, water is clear, no turbidity.
|
General Inspection | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Andy J. Long
|
|
|
dewatering inspection.
dewatering pit installed. Water discharging into pit is 1.7 NTU. Dishcharge out of wattle is overflowing through a straw wattle and bankside vegetation. No plume visible. Water upstream in creek is approx. 6 NTU.
Approved.
|
Complaint Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 | A | PEND |
Andy J. Long
|
|
|
potential dewatering of turbid water reported.
No turbid water discharge occuring at time of inspection. Settling structure constrcuted but full of turbid water and is not discharging. Submersible portable pump is placed perforated pipe and is discharging clear water to bank side vegetation intermittingly.
Reviewed dewatering requirements with homowner/GC Rick and Premier Pools project manager Scott. Explained receiving water is Logger's Creek and returns to Boise River downstream. No visible plume in receiving water is allowed.
Will construct new settling trench and allow infiltration and settling with outfall to existing grass and vegetation.
Follow up inspection scheduled for tomorrow AM.
|
General Inspection | 8/10/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
Michael Zawacki
|
|
|
Driveways are prepped for concrete. Majority of site is belo grade of road. Lot is exposed, nothing leaving site. Mason on site cutting bricks, causing lots of dust.
|
General Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on prepping driveway for paving and painting the house No trackout, discharges or spills observed. No loose trash and materials around site. Some dust due to the equipment working, but water available on site. Creekside bank and vegetation has been left undisturbed. Approved.
|
General Inspection | 4/5/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Michael Zawacki
|
|
|
WIP. Site is contained, rock entrance installed. No ESC issues.
|
General Inspection | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. Project adjacent to Loggers Creek. Bankside vegetation preserved and is good buffer. Two rock construciton entrances installed.
ESC permit sign posted. No corrections requested.
|