Information based on query as of Thursday, May 9, 2024.
Permit Information
Permit NumberESC17-01791
StatusFinaled
Name TYLER MCINTYRE
Site Address 1005 W MAIN ST
Project NameJohn Alden Reno & addition
Customer Number 
ePlanReviewNo
Description
see BLD for project description. ESC plan waiver request approved. Install MS4 inlet protection if any exterior staging or utility work.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/29/20194/29/20195/2/2019PPASS
DetailsMichael Zawacki
General Inspection4/29/20194/29/20194/29/2019 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection2/27/20192/27/20193/1/2019 PASS
DetailsMichael Zawacki
Andersen Construction has staging on Main
Site Final12/21/201812/24/201812/24/2018ANR
DetailsAndy J. Long
Need to removal all staging area materials and sweep where fence is installed.

DI bag on 11th and Grove has been pulled.
Site Final12/20/201812/20/201812/21/2018PCANC
DetailsAndy J. Long
Tyler would like this permit finaled Phone #: ###-####

rescheduled for 12/24
General Inspection12/10/201812/10/201812/12/2018 PASS
DetailsAndy J. Long
WIP on vertical and interior. Staging area is clean, no discharges or loose materials. Permit posted.
General Inspection10/10/201810/10/201810/12/2018 PASS
DetailsAndy J. Long
General Inspection7/31/20188/8/20188/10/2018APASS
DetailsAndy J. Long
General Inspection7/25/20187/31/20187/31/2018APART
DetailsAndy J. Long
follow up inspection.

ESC permit signs now posted on Main Street and 10th Street site entrances as requested. Recieving storm drain is on 11th & Grove and has a sediment filter bag installed. No trackout or discharges observed, dry conditions.

Corrections remaining:

Some areas of staging area have been swept, but there is still need for further sweeping and clean up of sidewalk as well as attending to broken sand bags holding fence in place.
BMP Violation7/23/20187/24/20187/25/2018AFAIL
DetailsAndy J. Long
Verbal correction request issued to RP Tyler.

- sweep up staging area to remove any wallboard, demo dust, or concrete dust Do not use blower. If rinsed, contain wash waters.
- sweep sidewalk and gutter on Main Street.
General Inspection7/19/20187/19/20187/23/2018PFAIL
DetailsAndy J. Long
No trackout, spills/discharges leaving work areas along Main and 10th street

BMP Violations:
- No ESC permit signs posted at site.
- need to install secondary contaiment area around drywall washout area or implement daily clean or covered area to prevent mingling with stormwater or irrigation water.