Site Final | 4/16/2019 | 4/16/2019 | 4/17/2019 | P | PASS |
Andy J. Long
|
|
|
see ESC15-00853 for remaining inspections at North HIll sub. Site is in compliance. Storm drains have sediment protection, trash containment on site, trained excavator and on site RP. Approved.
|
General Inspection | 4/16/2019 | 4/16/2019 | 4/16/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | | PART |
Michael Zawacki
|
|
|
Some trackout coming from empty lot, not reaching hill road.
|
General Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 | | PASS |
Michael Zawacki
|
|
|
All work is interior, new phases haven't begun. Some tracking from delivery of rock, no trackout leaving site. Upper witches hat about half full.
|
General Inspection | 2/27/2019 | 2/27/2019 | 2/27/2019 | | PASS |
Michael Zawacki
|
|
|
Inspected 2-25. No new phases have begun, no new disturbances.
|
General Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior completed, all work inside. No ESC issues on site.
|
General Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | | PASS |
Michael Zawacki
|
|
|
All current work in interior. Owner plans on starting next phase soon.
|
General Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work on units complete. No new foundations begun.
|
General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | | PASS |
Michael Zawacki
|
|
|
Inspected 12/26. All current work is interiors. Site prep has begun for next units, on hold currently.
|
General Inspection | 12/12/2018 | 12/12/2018 | 12/12/2018 | | PASS |
Michael Zawacki
|
|
|
West side of project hasn't begun. Some forms and material stored in area.
|
General Inspection | 11/27/2018 | 11/27/2018 | 11/27/2018 | | PASS |
Michael Zawacki
|
|
|
Crew working on retaining wall, some light trackout from skid steer.
|
General Inspection | 11/2/2018 | 11/2/2018 | 11/2/2018 | | PASS |
Andy J. Long
|
|
|
WIP on 4 units at North HIll Townhomes/Hill Terrace. Storm drains have sediment protection, trash contained, crew onsite sweeping up some trackout onto Hill Terrace.
Review washout requirements with onsite crew man and RP Ron, Site is currently in good condition.
|
General Inspection | 10/18/2018 | 10/18/2018 | 10/18/2018 | | PART |
Michael Zawacki
|
|
|
Working on interiors. Lots of dirt tracked in front of building, needs to be swept.
|
Site Preparation | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | CANC |
Andy J. Long
|
|
|
Jeremy Phone #: ###-####
intended for foundation inspection
|